Post Job Free

Resume

Sign in

Project Manager Power Plant

Location:
Doha, Qatar
Posted:
June 29, 2014

Contact this candidate

Resume:

CURRICULUM VITAE

PERSONAL DATA :

Name : RAJASIMHA KOPAY N

Year of Birth : 1955

Nationality : INDIAN

Passport Details : Z 2180403 Valid until 19 March 2021

Contact Details : 00974 - 77760 362 (Mobile)

00974 - 44278688 (Home)

Email ID : acer2d@r.postjobfree.com

EDUCATION:

Bachelor of : R V College of Engineering, Bangalore

Engineering University, Bangalore, India - 1976

SYNOPSIS OF PROFESSIONAL EXPERIENCE:

Over 35 years of core experience in Design, Engineering, Construction &

installation of conventional outdoor substations of voltage level 400kV

/ 220 kV & GIS substations ( 132 kV, 66 kV, 33 kV & 11 kV ) & large

thermal power plants ( installed capacity of 210 MW x 7 = 1470 MW ) &

simple gas turbine power plant of installed capacity of 150 MW.

Working as Engineering Project Manager, leading a team & responsible for

efficient management of design team for HV GIS substations, detailed

engineering & coordination with Civil & MEP & consultants. Responsibilities

include:

. Compliance with the technical specifications.

. Technical inputs to specifications for HV, MV power cabling, bonding,

diversion of HV power cables between stations, MEP & Civil services,

proposals

. Development of project schedules, management of engineering team.

. Preparation & review of Primary & Secondary designs, HV, MV power

cables, for HV substations & Power plants.

. Review & approval of technical documents from vendors.

. Coordination & interfacing with HV / MV power cables, Civil & MEP

services during site installation.

. Coordination with clients' consultants.

. Review of project progress in routine progress meetings.

Technical competency includes following activities:

. Preparation of layouts, general arrangement, HV, MV cable routing

drawings, SLDs.

. Preparation of technical specifications, tendering & bid evaluation,

placement of orders, project schedules, progress reports,

. Review of battery, charger & UPS sizing calculations, station transformer

adequacy checks, HV, MV cable arrangement, bonding & routing drawings.

. Preparation of CT, VT sizing calculations, review of fixed & variable

relay setting calculations.

. Preparation of operation & maintenance schedules, annual maintenance

reports for power plants.

. Installation of electrical equipments in power plants, HV GIS

substations, cabling & cable termination, supervision of testing &

commissioning.

. Preparation of SAT formats & review of FAT reports before issue of

dispatch clearance for dispatch of equipments .

. Witness of FAT of electrical equipments viz 247 MVA & 150 MVA

generators, power transformers, MV motors, 220 kV relay panels, LV

panels etc at manufacturers shops.

. Familiar with IEC, IEEE, BS international standards.

. Familiar with MS words, Excel, power point & trained in Primavera

planning P6 software.

. Developed useful interfacing schedules for coordination between various

disciplines.

SUMMARY OF EXPERIENCE:

Feb 2010 -Till Date : SEIMENS WLL, DOHA QATAR

Oct 2007 - Dec 2009 : ETA - POWER PROJECTS DIVISION, Dubai, United

Arab Emirates

Mar 2006 - Sep 2007 : FEDERAL ELECTRICITY & WATER AUTHORITY,

Dubai, United Arab Emirates

Aug 2003 - Jan 2006 : SAUDI ELECTRIC COMPANY (On Deputation from

DAR AL RIYADH Consultants, Al Khobar,

Kingdom of Saudi Arabia

Sep 1980 - July 2003 : KARNATAKA POWER CORPORATION LTD., Bangalore,

India

May 1977 - Aug 1980 : UNIVERSAL ENGINEERS, Bangalore, India

CAREER PROFILE :

FEB 2010 - Till Date : SEIMENS WLL - DOHA

POSITION HELD : ENGINEERING PROJECT MANAGER ELECTRICAL

PROJECTS:

QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE IX

Project comprises of the following 66/11 KV Substation projects

awarded in 2010:

Umm Ghuwalina : New (Energized)

Khalifat : Replacement(Energized)

Old Ghanim : Replacement(Energized)

Naeeja Local : Upgrade (Energized)

Al-Saad (West) : Modification (Energized)

Mergab Mall : New award in March 2011 (Energized)

QATAR POWER TRANSMISSION SYSTEM EXPANSION - PHASE X

Project comprises of the following 132/66/11 KV Substation projects

awarded in July 2011:

STAGE 1

Garaffa North : Upgrade

Bin Mahamood : New

Doha Industrial F : New

Ministry of Interior : New

Sheraton Park : New (Underground)

Barwa Al Doha : New

STAGE II - New Award in Dec 2011

Al Khissa North : Upgrade

Vegetable Market : Upgrade

Al Wajbah : New

Umm Al Gahab : Upgrade

Abu Sidra : Upgrade

Doha Industrial C : Upgrade

PSS-3 : Upgrade

Lusail Real Estate

Development Authority : 66 / 11 kV - Golf 1 s/s ( Awarded in Dec

2012 )

Al Mirgab Developers Semi Underground .

66/11 kV Maamoura South s/s ( Awarded in Sep

2013)

Semi Underground.

OCT 2007 - DEC 2009 : EMIRATES TRADING AGENCY (ETA) - POWER

PROJECTS DIVISION, DUBAI, UAE

POSITION HELD : MANAGER - PROJECTS (DEWA APPROVED)

Contributing for 132/11 KV GIS Substation projects under DEWA and

private property developers in Dubai, UAE . Lead a team of

electrical, civil, MEP & testing & commissioning engineers.

PROJECTS:

QARYAT JUMEIRAH - 132/11 KV Substation

Letter of appreciation issued by EHS -TRAKHEES, JAFZA for the best

EHS procedures practiced at the project site.

Letter of appreciation issued by DEWA for the excellent Occupational

Health & Safety performances & presentation during the British

Safety Council 5 Star Health & Safety Management System Audit,(

Third party auditors for DEWA ).

LOST CITY, 132/11 KV Substation

TELECOMMUNICATION CITY, 132/11 KV Substation

MAR 2006 - AUG 2007 : FEDERAL ELECTRICITY & WATER AUTHORITY,

DUBAI, UAE.

POSITION HELD : SENIOR LEAD ELECTRICAL ENGINEER with a team

of engineers .

PROJECTS:

AL ZAWRA COMBINED CYCLE POWER PLANT AT AJMAN, UAE

The project consisted 6 Nos G9171 Gas Turbines and 9A5 Generators

supplied by GEEP, France.

AUG 2003 - JAN 2006 : DAR AL RIYADH CONSULTANTS/SAUDI ELECTRICITY

COMPANY, KSA

POSITION HELD : PROJECT ENGINEER

Involved in installation of following 132/33/13.80 KB GIS

Substations

Al Suffa and Qunfudah : Extension of 2 Nos 66 kV GIS bays

Muhayil and Majardah : Extension of 2 Nos 66 kV GIS bays

Al Zarqa and Sabya : New

Muhayil North : New

Samitah, Qilwa and : Installation of capacitor banks

Baish

Qunfudah town & : New

Muhayil north

New Al Salamah : New

SEP 1980 - JUL 2003 : KARNATAKA POWER CORPORATION LTD., KARNATAKA,

INDIA

POSITION HELD : EXECUTIVE ENGINEER

PROJECT

7 X 210 MW -Raichur Thermal Power Station - Coal fired boilers (

BHEL make ), KWU ( German make ) 3 stage Turbines, 247 MVA

hydrogen cooled generators, with conventional outdoor 220 kV / 400

kV switchyard with 315 MVA inter bus transformers.

MAR 1977 - AUG 1980 : UNIVERSAL ENGINEERS, BANGALORE, INDIA

POSITION HELD : FIELD ENGINEER

PROJECTS

Commenced career as field engineer and supervised electrification

projects of Commercial & Industrial buildings

PROFESSIONAL MEMBERSHIP

Member of The Institution of Engineers, India

Member of IEEE Institute .

Member of PMI, USA.

TRAININGS:

Power System Protections conducted by ALSTOM, Bangalore, India.

Power System Protections conducted by ABB, Bangalore, India

Power System Protections conducted by Central Electricity Authority

Government of India.

Variable frequency Drives for Power Plants conducted by BHEL, India.

Operation & Maintenance of Power Stations conducted by Power

Engineers Training Society, India.

PMP - Have undergone training in PMP

Primavera P6 project management.

Seminar on ETAP .

Driving License : Valid Indian, UAE & Qatar driving license

References: 1. Mr Uwe Lingmann, Project Manager, Siemens, Kuwait.

009**-********.

2. Mr Andre Romermann, Project Manager, Siemens,

Germany.

+ 49 (9131) 7-20105.



Contact this candidate