SUMMARY
Eight plus years of experience covering the areas of data validation,
data analysis, pilot plant operations support, steady state simulation
of gasification, CO-shift, sour water stripping, H2S removal, sulfur
recovery, methanol synthesis, and flue gas treating processes along
with production supervision of batch process operations. Hands on
experience in simulation and validation of chilled ammonia based CO2
absorption and regeneration process, developing PFD's, working with
P&ID's, performing heat and material balances for plant data, and
equipment lists for conceptual studies. Proficient in Aspen Plus,
Hysys, ProMax, and PPS simulation software's. Possess trouble shooting
and decision-making abilities. Result oriented team player with
excellent written and verbal communication skills.
EXPERIENCE
Process Development Engineer - Alstom Power, Knoxville, Tennessee
(Feb'11-Present)
Core member of Alstom's chilled ammonia CO2 capture- R&D execution
team.
Accomplishments:
. Monitor the process remotely through PI, identify key parameters and
report any deviations from the set target.
. Analyze raw data based on stability criteria produced from chilled
ammonia CO2 capture demonstration plant, Mongstad Norway.
. Perform heat and material balances around key individual unit
operations in excel for selected stable periods.
. Provide suggestions to improve CO2 capture efficiency and reduce
ammonia emissions to stack.
. Lead daily meetings with onsite crew, develop test matrix and test
plan for further testing to optimize the process.
. Present the test results in weekly meeting to the management and
client.
. Optimize overall steam demand (GJ/mTCO2) of chilled ammonia CO2
capture process.
. Perform water wash column sensitivity analysis and provide optimum
Liquid/Gas ratio for the column.
. Validate direct contact cooler, absorber, and water wash stripper
system in Aspen Plus using the reconciled data from Mongstad
(Norway) and AEP Mountaineer chilled ammonia CO2 capture
demonstration plants.
. Simulate the rate based CO2 absorption process in PPS (Procede
Process Simulation) software and compare the results with Aspen Plus
equilibrium based modeling results.
. Involve in developing single absorber flow scheme and provide
simulation support for testing the flow scheme in V xj, Sweden
pilot plant.
. Technical knowledge of gas-liquid contactors, scrubbers, absorbers,
water-wash columns, strippers, heat exchangers, and solvent
regeneration unit.
Process Development Engineer - Alstom Power, Mongstad, Norway (Jan'13-
July'13)
. Short term international assignment in Norway to provide onsite
process validation support to chilled ammonia CO2 capture
demonstration project.
. Process the raw data and develop stability sheets for all the key
parameters of the process.
. Perform mass and energy balances around main unit operations of the
process for the identified stable periods.
. Assist in modification of piping network for manual gas sampling and
calibration of Opsis CO2 gas analyzers.
. Develop weekly reports covering the highlights of operation results
and present them to the customer and management.
. Provide input to the technical reports and intermediate reports due
to the client.
. Two days of rigorous safety training on site. Received the training
certificate on successful completion of test.
Process Development Engineer - Alstom Power, V xj, Sweden (Aug'12-
Jan'13)
. Short term international assignment in Sweden to provide onsite
support to the chilled ammonia CO2 capture pilot plant testing on
gas applications as well as for packing performance testing series.
. Process the raw data and develop correlations for correcting the raw
data by applying process and instruments errors.
. Perform major instrument verification tests along with calibration
checks on CO2 and NH3 Opsis analyzers.
. Develop good understanding on liquid analysis methods of FTIR and
titration.
. Perform material balance around the absorption system; evaluate CO2
capture efficiency and NH3 emissions.
. Provide operations support by planning the tests for next day and
estimating the required liquid make-up rates.
. Compare the performances and recommend the best packing from the
packing performance tests conducted on four different packing's
(Fenix, Montz, Zehua, and Koch Glich) on the basis of CO2 capture
efficiency, pressure drop, and NH3 emissions.
. Analyze the results and prepare the test summary reports.
Engineer I - WorleyParsons, Reading, Pennsylvania (Oct'07-Feb'11)
Project Feasibility Group - Responsible for feasibility studies for
post combustion and integrated gasification combined cycle (IGCC)
projects related to power production as well as SNG production.
Projects:
. Coal to Methanol to Gasoline - The conceptual study involved
development of coal-to-methanol-to-gasoline plants combined with
heat recovery and power generation.
. Simulation of Coal gasification, syngas clean up, carbon capture,
methanol synthesis and methanol-to-gasoline (MTG) process in Aspen
Plus simulation software.
. Develop PFD's and prepared heat and material balances from the
process model.
. Estimate the plant performance based on the results generated from
integrated steam cycle Aspen Plus model.
. Analyze two cases: 100wt% coal as one feedstock and 70wt% coal and
30wt% biomass as the other.
. Calculate MTG gasoline greenhouse gas emission profiles based on the
excel model developed by NETL and compare the economic feasibility
of the MTG gasoline to the petroleum derived gasoline.
. Tenaska Taylorville IGCC, Illinois - The project involved treatment
of raw gas downstream of the gas scrubbing unit of Tenaska SNG- IGCC
plant with 35 wt% MDEA (Methyl diethanol amine) solvent to remove
the H2S present in the raw gas down to 15ppmv.
. Model the single stage H2S removal MDEA unit in ProMax modeling
software.
. Prepare heat and material balances along with equipment list from
the process model results.
. Gas Atacama, Chile - Conceptual study on IGCC equipped with CO2
capture to produce synthetic natural gas (SNG) from Magallenes coal
of southern Chile.
. Develop Aspen Plus model for Shell gasification, water gas shift,
and methanation process.
. Develop the steam cycle model in Aspen Plus and calculate over all
plant performance.
. Develop PFD's and prepare material balances for the process.
. EPRI Study, Australia - Feasibility study of IGCC plants on two coal
sources: brown and black coal of Australia
. Model Shell gasification process in Aspen Plus and compare the
performance of the two coal sources with and without carbon capture.
. Carbon capture case involved two-stage Selexol unit to remove the
acid gas and CO2. Non-carbon capture case involved amine guard
process to remove the acid gas.
. Southern California Edison, Utah - Pre-front-end engineering and
design (FEED) study on two technologies ultra-super critical
pulverized coal (USCPC) and IGCC.
. Involve in the selection of best technology for the study from the
performance and modeling results.
. USCPC involves combustion calculations and process modeling of mono-
ethanol amine-based post-combustion carbon capture in ProMax.
. IGCC involves selection from five preferred gasification vendors
COP, MHI, Siemens, GE, and Shell.
. Develop detail process model of downstream gasification involving
water gas-shift, low temperature gas-cooling, Claus plant, and sour
water stripping in Aspen Plus simulation software with the vendor
given gasification boundary limit information.
. Develop PFD's and prepare material balances and equipment list for
all the cases of the study.
Simulation Engineer - TRAX LLC., Lynchburg, Virginia (March'07- Oct'07)
. Jeffrey Power Plant - Prepare process model schematics from the
P&ID's data using ProTRAX software.
. Develop schematics for Flue gas desulphurization model.
. Sherco Power Plant - Prepare balance-of-plant, boiler, and
electrical models in ProTRAX.
Assistant Process Engineer - Alkali Metals Ltd., Hyderabad, India (Aug'03-
Oct'04)
. Supervise the process operations of sodium azide and amino pyridines
production plant.
. Assist senior process engineer in trouble shooting the plant
operations.
. Develop process flow diagrams (PFD) for the reaction and
purification section of the plant.
. Optimize the reaction time of sodium azide from 24 hours to 18 hours
through pilot plant experiments.
. Develop daily and monthly performance reports along with material
and energy balances for key unit operations of the plant.
Internship - Dr. Reddy's Laboratories, Hyderabad, India (Jan'03-April'03)
. Design of an extraction column "Rotating Disc Contactor" for the
extraction of acetic acid-isopropyl ether-water system.
. Evaluate the number of theoretical stages in the extraction column
using McCabe Thiele method with the available data.
EDUCATION
Master of Engineering, Chemical Engineering,
GPA- 3.3/4.0 Lamar University, Texas, Dec'06
Bachelor of Technology, Chemical Engineering,
GPA- 3.5/4.0 Jawaharlal Nehru Technological University, A.P,
India, April'03
REGISTRATIONS/AFFILIATIONS
Registered Engineer-in-Training (E.I.T.), Pennsylvania, 2010
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES
Aspen Plus, ProMax, PPS, ProII, Hysys, ProTrax, Minitab, PI, Process
Book, SharePoint, Lotus Notes, and MS Office