**** ********** *** ***. **** Columbus, IN *****
Cell # 309-***-****, E-mail: *********@*****.***
Quality Control Engineer
Six Sigma ? Lean Manufacturing ? Continuous Product/Process Improvement ?
Project Management ?
OSHA ? CAPA ? 8D ? Statistical Analysis ? FMEA ? SPC ? Minitab ? ISO/TS
16949 ? LPA ? QCAM
SUMMARY:
7 1/2 years of experience using Quality and Lean Principles including 2 1/2
years at Cummins Inc.
6 + years of experience using Six Sigma and Lean Mfg tools.
Expertise in solving complex Design and Manufacturing problems, Root cause
analysis and implementing in-process verifications/validation.
Experienced Customer liaison- solving quality problems collaborating with
Design and Manufacturing team.
Demonstrated the abilities to perform statistical analysis and control
charts in order to resolve performance and safety related issues for diesel
and gas engines.
Expertise in implementing waste reduction tools such as 5S, VSM, 3M, 7QC,
OEE, SMED and Kaizen.
Experience in managing layered Process, Torque and Critical joint audits.
SKILL:
Quality Tools: - 5S, SMED, OEE, 3M, VSM, Minitab, 8D, PPAP, APQP, FMEA,
SPC, DOE, Pareto Analysis, Ishikawa, LPA, Internal audit
Design Software: - AutoCAD, Pro-Engineering, Teamcenter
Other: - GD&T, Microsoft Excel, Microsoft Word
Soft Skill: - Mentoring, teaching, self motivated, Problem Solving and
Analytical, Team player, Quick learner, Ability to work under pressure with
Positive attitude.
Certification:
Six Sigma Green Belt ? Continuous Product Improvement Green Belt ? Lean
Manufacturing Green Belt ? Reliability ? OSHA ? Process Change Notification
? Pro/Engineering
EXPERIENCE:
Cummins Inc. October 2011 - Present
Quality Engineer (QE)
Main role is to lead quality support to troubleshoot and reduce future
occurrences for assembly and test performance issues.
Lead Assembly and Test PQP (Plant Quality Problem) team and Interact with
support functions like materials, product engineering, Manufacturing
Engineering and SQI to reduce Plant and Test Quality Problems.
Address corrective action by using quality systems for defective material
(MNC's, CARs/PARs/SCARs, PQP, Six sigma, QCAM etc.)
Lead Root cause and permanent corrective action investigation for Customer
reported defects.
1 years of experience in leading LPA and Audit QCAM to prevent defects by
ensuring robust processes.
1 years of experience in leading Torque and Critical joint audits and
drive corrective actions to improve detection and prevent product failures.
Experience managing 4 quality techs for assembly quality and final product
audit.
Provide coverage as needed for other members of the quality team for
Customer, Custom-Fab and supplier Quality.
Completed 3 DMAIC Six-Sigma projects (1. Process improvement, 2. Design
improvement, 3. Employee training and development -contract phase)
Major plant level project worked other than six sigma - Lead effort to
reduce BIS/ELF and Engine test leak failures by statistically analyzing
manufacturing data and improving leak check process.
Perform Internal Process Quality audits, prepare QA procedures, plans, and
inspection instructions. ISO/TS 16949.
Pexco, LLC IL November 2010 - October
2011
Lean Manufacturing Engineer (KPO- Kaizen Promotion Officer)
Kaizen team leader at plant level, for conducting Kaizen Events focusing on
reducing waste in production, processes, raw materials and finished goods.
Implemented Kanban for raw material inventory that saved over 680
hours/year and reduced parts variation by 40%.
Implemented one piece flow process for Fabrication work that increased
efficiency by 20%, which equals 7000 hours/year in savings and made
material management more reasonable.
Lead Several TPM and energy savings kaizen that made work more efficient
and required less people involvement.
Caterpillar Inc, Mossville, IL April 2008 to
October 2010
Quality Control Engineer
Developed Customer Problem solving process map that helped achieving
Company's Quality Goals.
Used Oracle and SAP database to audit and improve manufacturing procedures
and products specifications based on customer requirements.
Worked as a Customer liaison with OEMs based globally to analyze Root Cause
and provide Corrective action for defects reported.
Improved productivity through combined work steps, removing non-value added
tasks (3M), adding automation (OEE), in process verifications (Poke Yoke)
and the development of effective work practices (SMED).
Developed a Product Value and Variation Metrics (PVVM) in order to Reduce
Material Cost and reduce amount of Variation in Product.
Developed the Lessons Learned Database in order to prevent Issues Carry
over in New Product Development.
Worked in a team to review Critical Customer Requirements, APQP and PPAP.
Responsible for providing Quality solution for two manufacturing plants one
based in Midwest and other in South Carolina.
Six Sigma Project - Lead the team to Identify and resolve the potential
areas in plant, which contributes major defects - (COMPLETED - as a result
reduced number of issues per month by 30%).
Six Sigma Project - Improved the Velocity to resolve Customer issues (Set
up the Process Map and identified Control Variables) - (COMPLETED and
Increased the performance by 70%).
For about a year helped team to design existing and new components of the
Diesel Engine using ProE and team center.
Emhart Glass Manufacturing Inc. Elmira, NY June 07 - October 07
Industrial Engineer (Internship during MS)
Worked on Engineering inter department Value Stream Mapping, increased the
order start on line performance by 20%.
As a part of company's Lean Manufacturing initiative worked as a team
player and successfully implemented 5S and Value stream mapping activities,
increased overall performance by 45%.
Working with management team to map an ergonomic Plant layout for new
product development, (Added space for 6 more machines).
Designing new and existing components of glass bottle scanning Machines by
using design tools like, Pro/Engineering with Wind-chill PDM (Product Data
Management) and AutoCAD.
Bharat Engineering LTD, India May 05 -July 06
Production Engineer
Used time Study and Takt time to identify the work force requirement for a
new Product.
Implemented outsourcing strategy -resulted in increased the profit by 25%.
Key player in Designing, development and manufacturing of electric panel
board (Pro/Engineering and AutoCAD)
Responsible for Planning, distributing and controlling daily production,
and provided in-process solutions for maintaining product quality.
EDUCATION:
Master of Science - Industrial and system Engineering. Aug 2006 -
February 2008
State University of New York at Buffalo, NY, USA GPA: - 3.2
B-Tech - Mechanical Engineering. July 2002 - May 2005
Maharashtra Institute of Technology, MS, INDIA GPA: - 3.84
Diploma - Mechanical Engineering. May 2000 - May 2002
B & B. Institute of Technology, GJ, INDIA
Academic Projects:
. The optimal order quantity of food products sold at Food Courts using the
Newsboy Model: Effective saving after successful project was $1383.96/7
week.
. "Industrial innovation and Innovation in Service sector" (Elmex Control
pvt. Ltd. India)
A real time study was done for a continuously growing Indian company.
These dynamic aspects involve the startup of new firm, survival, growth,
the deployment of a strategy of compensating factor differentials. Project
was discussed with PHD professor to explore the factors through which these
innovations are driven.
. Psychophysical analysis of Back Pack:
Minitab/FMEA
Used Two-Factor Factorial design to collect and analyze data and
evaluated the psychophysical effects of strap length at different weight
levels upon backpack user, and also determined optimal strap length and
optimal relationship between strap length and weight level
. Six Sigma, Quality Assurance (Using a Paper Plane)
Minitab, DMAIC
. As a final result achieved the straight length and 30 feet of distance in
each three trial.
. Performed a Gage R&R for measuring the parameters affecting the
straightness and distance of the flight
. Designed an Experiment to arrive at the factors to be controlled
. Used Response surface methodology to optimize the straightness and
distance of flight.
. Rapid Product Development of an Ergonomic Book Stand.
Pro-E, Rhino, Insight
Completed a step wise study in developing the new product right from
customer survey to real time production. Conceptual designs were developed
using 'ProE'. In order to analyze the layers 'Insight' was used. FDM 3000
was used to Rapid prototype the product using ABS plastic.
Achieved Great appraisal and first prize for the successful completion of
project.
BS THESIS:
. "HVAC Project" - Heat Load Calculation of a Multi-storey building.
. Detail study of Vapor absorption system.