Jeff Keebler
********@*****.***
Alabaster, AL
Work History
Maintenance Supervisor
SalonCentric/Loreal
July 2013 - April 2014
McCalla, Alabama
Daily operations of facility and distribution warehouse equipment. Construction management of new installations and design. Preventive, Predictive, and PM, planning. Ensure spare parts inventory available in stock. Electrical/Mechanical troubleshooting to minimize production downtime. Training maintenance crew on skill sets and safety.
Maintenance Technician
Paramount Services
November 2012 - July 2013
Birmingham, Alabama
Troubleshoot and repair of Electrical, Mechanical, Pneumatic, and Hydraulic Systems. New Equipment Installations, Building and Grounds Repairs. Environmental Compliance and Waste Management. Parts Inventory. Chemical Inventory. Safety Compliance and Training.
Maintenance Supervisor
Cintas Corporation
March 2010 - October 2012
Bessemer, Alabama
In charge of Building, Grounds, Equipment Repairs, and New Installations. Manage the day to day CMMS work order,preventive and predictive maintenance system as well as parts inventory. Manage the Environmental Compliance and waste management. Train and direct maintenance technicians. Train and direct in all aspects of safety, NFPA 70E ARC Flash, LOTO, Forklifts, Scissor lift, Boiler Safety, Confine Space, Hot Work Permits.
Maintenance Manager
Vulcan Electo Coatings
February 2007 - January 2010
Columbiana, Alabama
Pipe liniings, electo coating deposition, Powder coating, and liquid coating of steel parts, pipe, or automotive parts. I installed an additional Electo Coating Line (Zinc Phosphating), Creat, adopt, and enforce the Preventive Maintenance Program. Train and instruct employees . Manage Buildings, Grounds, and Equipment throughout Facility. Manage All Hazardous Waste including the Treatment of Waste Water. Improve Utilite Cost and Controll usage. Project Management of new equipment or Improvements to facility. Insure Continual Improvements to Facility and Equipment. Design and Fabricate new tooling for Production use. Insure that all employees work to our ISO standards and adhere to our safety policy and procedures.
Maintenance Supervisor
Muller Copper Tube
November 2000 - October 2006
Fulton, Mississippi
Preventive Maintenance to keep equipment performing in peak efficiency Instruct and Supervise 14 Maintenance Techs Make Quick and Accurate Assessments with production goals Manage the Work Order and Unscheduled breakdowns Schedule Shut down and Start Up procedures Assist Casting Maintenance is Service and Repairs of all Casting Equipment PM and Repair Overhead Cranes Document all repairs and parts for facility Safety Training along with TPC training for Union Maintenance Employees
Education
Itawamba Community College
Electrical Technology
September 2001 - September 2005
Certifications
Hazardouse Waste Operations and EmergencyResponse
HAZ-MAT RESPONSE
December 2009
24 Hour Hazardous Waste Training with Emergency Response Training Procedures
Interests
Fishing
Beach
Motorcycles
Skills
Electrical Troubleshooting
PLC
Electomechanical troubleshooting
Hydraulics
Heavy equipment operator/ mechanic
Leadership
Organization and Time Management
productivity
Interdepartmental Organization and Communication
CMMS
waste management
Computer Programs Microsoft Excel
References
Mike Bailey
Warehouse Manager, Saloncentric/L,Oreal
205-451-7907M
********@************.***
Darrel Neer
Director of Operations, SalonCentric/L,OREAL
*****@************.***
Alex Thrasher
Plant Manager, Vulcan Electro Coatings
*********@**************.***
Danny Roberts
Maintenance Manager, Muller Copper Tube
********@****************.***