Johnny Short
**** ********** ***** . ***********, **** 44241
330-***-**** . **********@*****.***
Professional Summary
Over 20 years of combined industry knowledge and experience in the
Manufacturing Manager, Quality Engineer, Project Manager and OEM Sales
positions. Have a proven record of success driving projects, integrating up-
to-date technology, implementing quality engineering principles and
attaining highly profitable sales. Have effective troubleshooting, problem
solving and communication skills in highly diverse matrix environments.
Extremely detail-oriented with an organized management style and the
ability to adapt and respond to different situations quickly and
resourcefully.
Professional Employment
FORMTEK, INC.
Project Manager / OEM Sales
2004 - 2014
Responsible for overseeing the assembly of roll forming machine lines and
qualification per customer's APQP process which included a Control Plan,
PPAP, FMEA, and Part Submission Warrants. Upon acceptance, was responsible
for dismantling lines and re-installing at customer's facility.
Responsible for managing and expediting OEM Sales orders to meet customers'
needs.
. Project managed extensive custom roll forming lines using double un-
coilers, straighteners, feeders, pre-punch presses, loop control
systems, integration of Excel or AMS Controls, rafted and un-rafted roll
forming machines, post punch presses, cutoff systems, and roll tooling
. Developed control plans for project production runs using SPC to meet
customers process capabilities, Cp and Cpk conformances to
specifications
. Built an excellent customer base by supplying them with the tools they
needed to identify their machine parts, supplying them with the correct
OEM Parts and helping them with their PM Programs
. All OEM Orders were expedited to meet customer order milestones and
deadlines
. Possess unique and intricate technical knowledge of roll forming lines
which directly led to an established trust and commitment from customers
. OEM Sales; Contributed to over One Third of the company's 5 Million
Dollar Profit in 2013
Centria
2003 - 2004
Plant Manager, Manufacturing
Responsibilities included overseeing the following: Engineering/Quality
Manager, Supervisors, Sheet Metal processing work cells, Roll Forming Lines
and Maintenance Department in an architectural building products facility.
Daily meetings were held to review orders, and maintained production and
shipping schedules. Ensured goals, cost objectives and quality metrics were
met.
. Managed a workforce of approximately 85 employees
. Oversaw tooling and equipment projects consisting of budgets varying
from $5,000 to $250,000
. Created Sheet Metal Work Cells, Quality was improved and costs were
reduced by over $30,000
. Control Plan implemented, utilizing FMEA, Cause and Effect, and control
charts. Improved quality and reduced scrap by 11% on Sheet Metal
shearing, punching, bending and drilling operations. Improved quality
and reduced scrap by 15% on Roll Forming production line products.
Ohio Moulding Corporation
1971 - 2003
Engineering Coordinator
1999 - 2003
Project managed and installed machinery and tooling at sister facilities.
Managed all tryouts and developed a control plan for all new products.
Oversaw all conformances to specifications during the ordering process and
after first production runs and ensured that all customers part drawings
and control plans were up-to-date.
. Detailed drafting of product and roll tooling using accurate geometric,
dimensioning and tolerancing practices and AutoCAD 2002
. Completed estimates for customer jobs ranging from $5,000 to $125,000
. Project managed with direct input for design of rolls, pre-punches, post-
punches and cutoff tooling
. Developed project schedules for source tooling with viable milestones
. Instituted process capability studies for products leading to cost
reduction between 10-20%
. Maintained customer tooling and engineering reference files for existing
and new customers
. Maintained gage calibration schedules and documentation for instruments
Quality Engineer / Manufacturing Manager
1998 - 1999
Responsible for setting up an APQP process to build the foundation for the
company to become ISO-9000 certified. Responsibilities also consisted of
developing all documentation, establishing quality control systems,
capability studies, PPAP, FMEA, Cause & Effects and Part Submission
Warrants. In charge of creating and implementing training programs with
continuous improvement mindsets including all instrument training, usage,
repairs and calibration checks.
. Maintained and updated quality manuals
. Collaborated with sales and engineering to introduce new jobs into
production
. Developed and implemented quality control programs, procedures, controls
sheets, charts, instruments and training that developed a continuous
improvement attitude to reduce and eliminate non-conformances and
quality defects
. Created process capability studies using Mini-tab and Microsoft Excel
. Resolved customer quality issues through troubleshooting and product
improvement
Quality Assurance/ Production Control Manager
1995 - 1998
Managed the development and execution of the quality control system and
quality training programs Managed the plant with two shifts, scheduling all
customer orders, receipt of all materials and ensuring all customer
delivery dates were met. Managed all supervisory and hourly employees
involved with production.
. Developed quality systems with production and engineering
. Implemented customer quality programs
. Maintained and controlled all raw material and finished goods inventory
levels
. Prepared orders for production
. Maintained production planning board and developed a capacity planning
system
. Provided manufacturing input on quotations - lead times, labor rates,
costs -
Plant Manager
1991 - 1995
Managed all supervisors' and hourly employees on two shifts. Responsible
for production on roll forming lines that had material thickness
capabilities ranging from .020" to .375" and brake presses with tonnages
ranging from 50 to 500 tons. Responsible for scheduling customer orders
from receipt of customer order and incoming material to deliver (JIT).
Maintained and controlled all raw material and finished product inventory
levels. Ensured plant was adhering to and implementing OSHA and EPA
regulations.
Education
Certificate in Quality Engineering, Lakeland Community College
Certificate in General Quality Technology, Lakeland Community College
Military
United States Marine Corp
Memberships
American Society for Quality
ISO 9000 Network, Tools and Techniques Network
EPA and OSHA Networks