PRABIR ROY

PROJECT/QA-QC Electrical Engineer

I have more than 24 years working experience in

Execution and QA/QC of Electrical Construction Field.

MY CORE COMPETENCIES OVERVIEW

Direct Involvement of Testing and Commissioning in

Electrical System:

LV/Control/I & C Cable Testing.

MV/HV Cable Testing.

Earth Resistance Testing.

LV/HV Switch Gear Panel Testing.

Equipment Testing (Transformer)

Motor(HT/LT) testing.

Quality Compliance/ Assurance

Taking stringent quality measures with quality

control wings and preparation/ maintenance of

necessary documents as per norms and conducting

audits to ensure compliance with ISO

Optimizing customer satisfaction level by on time

delivery, monitoring costumer complaints and

providing efficient post installation services

Assisting quality wing for internal auditor for

conducting quality audits and measuring the

effectiveness of the quality management system

Follow ups for testing and getting certification for

specialized hands like welders, millwrights,

instrument technicians, commissioning crews, etc.

Vigil on inspection & condition monitoring of static

and rotary equipment

Materials Inspection- Incoming and In-house

Checking quality standards for incoming materials,

ensuring stringent adherence to quality standards,

norms & practices such as ISO/IMS identifying gaps

and taking corrective action

Conversant with quality management techniques (Total

Quality Management)

Experience: As a QA/QC Inspector for the ORYX-GTL

PROJECT (TECHNIP /AIR PRODUCTS), Ras-laffan B

Combined Cycle Power Project (SIEMENS/Q-POWER), RL

(3) Common Off Plot LPG & Condensate Tank Project

(CBI/FLOUR/RASGAS) and AKG-2 Base Camp Facility

Project (CTJV/RASGAS) in RASL-AFFAN INDUSTRIAL CITY

QATAR.

Actively involved in the installation, testing and

commissioning of Transformers, HV & LV SW gears, HV &

LV Motors,Motor Manager(MM-II, MM-5), Power plux

70 &700 variable speed drives (ALLAN BRADLY), and

different equipments with quality in time.

Experience with Fernas Construction India (P) Ltd.

Duration : From Dce'11 To Till Date.

Designation : Manager Electrical.

Organization : FERNAS CONSTRUCTION INDIA (P) LTD.

Project Title : Utility and off side Package.

Job Details : Working as a Manager Electrical in this project.

Closely monitoring of Electrical System and

Instrumentation System: Like- Substation work,

Fire Alarm

& Fire Fighting System, Electrical &

Instrument works and

also, checking of electrical drgs & TQE,

preparing of MTO

and technical discussion with sub-contractors

regarding

tenders of electrical works etc.

Other Experience

Duration : From Oct'08 to June'11.

Designation : Electrical Inspector,

Organization : FOSTER WHEELER INDIA (P) LTD.

Project Title : Infrastructure Development.

Job Details : Working as a PMC Role in this project.

Consulting & closely monitoring of Electrical

System and

Instrumentation System: Like- Substation work,

Fire Alarm

& Fire Fighting System, Electrical &

Instrument work in

WTP/STP, Earthing work, Street Light &

Building Lighting,

Telecommunication System & HVAC System.

Duration : From March'09 to June '09.

Designation : QA/QC Engineer (Electrical),

Project Title : Working in Home Office.

Job Details : Home Office Electrical activities for various project and

site

Preparation of required documents

Preparation of Method Statements for ongoing projects

Review and give comments to Safety Plan, Electrical schedule,

SCC & GCC related to IOCL - Paradip project.

Duration : From October 2008 to March'09.

Designation : QA/QC Engineer (Electrical),

Project Title : PSR-2 Revamp Project, Melaka (Malaysia)

Job Details : Involved in QC activities such as close monitoring of daily

site inspection (as per RFI) along with contractor & client,

inspection surveillance report, motor preservation &

maintenance records maintained, internal inspection carried on,

QC documents (inspection test report) updated, installation,

testing & commissioning activities of MV/LV/Control/I&C Cables,

MV/LV Sw.gears, PMCC/MCC Panels, Power Transformer, MV/LV

Motors, Heat Tracing, Modification of PMCC/MCC Panels, Earthing

System, Lighting System and preparing of final Dossiers(as per

systems).

Other Experience

Duration : From May 2005 to Oct. 2008

Organization : Comsip Al A'Ali (Cegelec), Qatar

Designation : QA/QC Inspector

Project Title : RL (3) Common Off Plot LPG & Condensate Tank Project,

AKG-2 Base Camp Facility Project, Ras- laffan B Combined Cycle

Power Project and ORYX-GTL Project in RAS-LAFFAN INDUSTRIAL CITY

QATAR.

Job Details : Actively involved in the Installation, Testing &

Commissioning of Transformers, Mv / Lv Sw. gears, Mv / Lv

cables, Generators, MCC Panels, RMU, Compact-Substation, Limit

Switches, Cathodic Protection, Foundation Heating System,

Lighting System, Earthing System and Regular Inspection

activities & preparing of QC Documents (Dossier).

Duration : From May 2004 to April 2005

Organization : Comsip Al A'Ali Cegelec Bahrain

Designation : QA/QC Inspector

Project Title : Line-5 Expansion Project of (Aluminium Bahrain)

Job Details : Actively involved in the installation, testing and

commissioning of transformers, Lv, SW gears, MV/LV cables, MCC

Panels. Motor manager (mm-II), power plux 70 & 700 variable

Drives (ALLAN BRADLY), and different equipments with Quality

ship in time

Duration : From June 2003 to April 2004

Organization : M/s. A.K. Electrical and Electronics

Designation : Servicing, Testing & Commissioning Engineer

Project Title : HT Switch Gear

Job Details : Working Experience of servicing, testing, commissioning of

HT/LT Sw.gears.

Duration : From Dec. 2002 to May 2003

Organization : M/s. Jayprakash Industries Ltd

Designation : Field Engineer

Project Title : HYDRO- Electric Project at Tala, under Tala Hydro-

Electric Project Authority (Bhutan)

Job Details : Working Experience of Maintenance of Electrical System for

tunnelling jobs.

Duration : From Feb.2002 to Nov.2002

Organization : M/s. Indo Power Projects Ltd

Designation : Project Engineer

Project Title : Up radiation & Modernization of power System at

Moradabad -Zone under World Bank Project

Job Details : Working Experience of Erection, Testing and commissioning in

UPPCL S Up gradation & Modernization of Power System (Village

Electrification).

Duration : From May 1999 to Jan.2002

Organization : M/S. Uma Enterprises

Designation : Site Engineer

Project Title : 11 KV Line & Capacitor Bank

Job Details : Working Experience of Erection, Testing and commissioning in

APTRANSCO"SW 33/11 KV Sw. Yard,

Also as a consultant Engineer in M/S. ANDREW YULE & CO.Ltd.ESG

(Electrical System Group)-Unit.

Duration : From Feb.1996 to April 1999

Organization : Andrew Yule & Co.(ESG-Unit)

Designation : Site Representative (Electrical)

Project Title : Turnkey project IN STTU Co-ordination project at Phase 1

N.Shaninal, Mehassna, Gujarat, Client- O.N.G.C

Turnkey Execution of DLF's 66KV Substation "Q" Block. Phase-11,

Gurgaon, Hariyana

Job Details : Working Experience of installation, testing, commissioning of

Electrical System of INSITU Combustion

Project, 66KV

Substation jobs.

Duration : From June 1992 to Sept.1995

Organization : NICCO Corporation Ltd. (Project Divn.)

Designation : Site Engineer (Electrical)

Project Title : Cabling Project of Metro Railway at Dum -Dum

Dum -Dum Metro Railway Carshed

Lighting Project of Vizag. Steel Plant at Vizag

Cabling Project of Metal and Steel Factory at Ichapur

Interplant Piping Project at Durgapur Steel Plant

Lighting Project at Vidyasagar Setu. (Second Hooghly Bridge

under Hooghly River Bridge Commission -HRBC)

Turnkey Project -at Rourkela Steel Plant, Rourkela

Job Details : Working experience in Erection, Testing and Commission of

Electrical.

Duration : From Aug.1989 to Aug.1991

Organization : M/S. S.K. Engineering Enterprise

Designation : Site Supervisor (Electrical)

Project Title : Dankuni Coal Complex (Under M/s. Simon Carves India

Ltd.)

Garden Reach Ship Builders & Engineers (Under M/s. Flakt India

Ltd.).

Job Details : Working Experience of Installation, Testing & Commissioning

of Electrical System of Carbonisation Plant,

HVAC System of Ship.

[pic]

Date of Birth

23.12.1960

Nationality

Indian

Educational Qualifications:

Diploma in Electrical Engineering

Passed in 1989.

Professional Qualifications:

An Electrical SCC Holder

Passport Details:

No. : J-7240006

Valid Till : 11-07-2021

Communication Address

Flat No.FF01 (1st Floor), 1/263, NAKTALA,

P.O.NAKTALA,

Kolkata-700047(W.B)

INDIA.

Contact No.

Tel :

Mob : +918*********/801-***-****

Email ID:

*************@*****.***

********@**********.***

**********@*****.**

Skype ID: prabir.roy86



Contact this candidate