RAM VINEETH
SAP System Analyst Lead
********@*******.*** Cell: 832-***-****
• Over 8 years of experience as an SAP Functional consultant in the areas of SAP
Materials Management Module including 3 full life cycle implementations.
• Experience in ASAP and Agile methodologies.
• Experience in ASAP methodology with its implementation phases such as Project
Preparation, Business Blueprint, Realization, Final Preparation, and Go Live &
Support.
• Analysis and design, go-live, project planning, configuration, quality
assurance, testing, post-implementation report development and user training
• Expertise in implementation and configuration of the MM module for Master
data, Procurement, Inventory Management, Invoice Processing etc.
• Expertise in Master data conversions including Material Master, Vendor
Master, Purchasing Info record, Source List, Bill of Materials etc.
• Worked in MM areas in Special Procurement Processes like Subcontracting,
Consignment, Third Party, and Stock transport Order etc.
• Very good understanding of cross-functional applications of MM, IM, WM,
FICO and PP modules in industrial scenarios.
• Configured Pricing conditions, conditional tables, access sequence for
Purchase Order Pricing determination.
• Configured Release strategies for various purchase documents. Configured
Release strategy with and without classification for Purchase requisition.
• Configured Output Determination procedures for Purchase Orders, Contracts and
Scheduling Agreements.
• Experience in Vendor Invoice management.
• Configured BOMs, Routings, Work centers for Production Master data
• Expertise in developing Test Scenarios/Scripts for Unit, Integration, and User
Acceptance Testing
• Designed Functional Specification Documents and developed interfaces in
conjunction with technical support.
• Experience in Data Migration and Data Uploads using BDC (session method &
call transaction method), BAPI and Legacy System Migration Workbench
(LSMW).
• Ability to analyze and understand problems, develop an action plan, successfully
complete the task within operating and financial guidelines.
PROFESSIONAL EXPERIENCE
Client : Hewlett- Packard (ESIT/EGIT), Houston, TX Dec 2012 – till
date.
Project : Support in Solution Management
Role : SAP System Analyst Lead.
Environment : ECC 6.0
Modules : MM/SD/FICO
Responsibilities:
• Analyzed the Business Requirements, studied the AS-IS Business Process,
submitted a solution design involving the TO-BE Business flows, documenting
the operating procedures and performed gap analysis between AS-IS & TO-BE
Process in the production environment.
• Configured the Materials Management module such as defining Material Master
Data, Purchasing, and Inventory Management (IM).
• Configured Material Types, Material Groups as per the requirements of the
Client.
• Configured screen layouts, Data screens, Sub-screens, Fields and Field selection
groups for Material Master
• Worked with the user to create characteristics, classification and dependency logic
for Variant Configuration (VC).
• Good understanding of Super BOM, Object dependencies and Pre-conditions in
VC .
• Configured Vendor Master, Item categories and Account assignment
categories for PO, Purchase Requisition, and Defined Quota Arrangement Usage.
• Configured Messages, Item categories, account assignment categories, access
sequences for Stock Transport Orders
• Configured Document types for Outline Agreement.
• Configured Movement types, GR, GI, Transfer posting in Inventory
management component of MM module
• Configured reason for movements for various IM movements.
• LIV- logistics invoice verification (MIRO), invoice parking and invoice block,
invoice verification in background.
• Settings for vendor evaluation-weighting keys, weighting factors.
• Employed Excel Spreadsheets to transfer initial stock from legacy system into
SAP and mapped the data into material master of SAP system.
• Created Scheduling Agreements, Contract Agreements and Quotations
• Worked on Source lists, quota arrangement, Info Records for Standard,
Scheduling agreements and Sub-Contracting.
• Worked on MIGO transactions for Goods receipt (GR)/Goods issue (GI) for
purchase orders, sales order, and stock transport orders.
• Carried out Unit Testing and Integration Testing with all possible Business
Scenarios to ensure minimum problems after Go-Live
• Applied fixes and OSS notes and data correction reports for
resolving SAP system errors and production issues.
Client : Nation Star Mortgage, Dallas, TX Oct 2011 – Nov 2012
Role : SAP MM Lead Analyst
Responsibilities:
• Analyzed the Business Requirements, studied the AS-IS Business Process,
submitted a solution design involving the TO-BE Business flows, documenting
the operating procedures and performed gap analysis between AS-IS & TO-BE
Process in the production environment.
• Designed and drafted upgrade plan, reviewed new functionalities with business
owners and made blue print document of the proposed system.
• Participated in the design process, assisted in defining project scope for the
company and planned implementation of SAP MM/PP module with full life-
cycle implementation using ASAP methodology
• Analyzed the business processes, mapped the processes and prepared templates in
the material management module for SAP R/3 implementation
• Was actively involved in the Realization phase by participating in tasks like
Configuration, Master Data Loads and Unit/Integration/User Acceptance testing.
• Configured the Materials Management module such as defining Material Master
Data, Purchasing, and Inventory Management (IM).
• Configured Material Types, Material Groups as per the requirements of the
Client.
• Configured screen layouts, Data screens, Sub-screens, Fields and Field selection
groups for Material Master
• Configured Purchasing component of MM module by creating Purchasing
groups, Source Lists, Purchasing Info Records.
• Defined Purchase Organization and Storage locations, Assigned Purchase
Organization to Company Code, Plant to Company Code
• Configured Vendor Master, Item categories and Account assignment
categories for PO, Purchase Requisition, and Defined Quota Arrangement Usage.
• Configured and created condition tables, access sequences and schemas for
messages for PO, PR.
• Configured Messages, Item categories, account assignment categories, access
sequences for Stock Transport Orders
• Defined price determination process, defined custom condition types for freight
burden etc.
• Configured basic data for foreign trade and transportation data.
• Configured Document types for Outline Agreement.
• Configured Movement types, GR, GI, Transfer posting in Inventory
management component of MM module
• Configured reason for movements for various IM movements.
• LIV- logistics invoice verification (MIRO), invoice parking and invoice block,
invoice verification in background.
• Settings for vendor evaluation-weighting keys, weighting factors.
• Employed Excel Spreadsheets to transfer initial stock from legacy system into
SAP and mapped the data into material master of SAP system.
• Created Purchase Requisitions, Purchase Orders, Scheduling Agreements,
Contract Agreements and Quotations
• Worked on Source lists, quota arrangement, Info Records for Standard,
Consignment and Sub-Contracting.
• Worked on MIGO transactions for Goods receipt (GR)/Goods issue (GI) for
purchase orders, sales order, and stock transport orders.
• Prepared functional specifications, interfaces, custom reports based on user
requirements and coordinated with ABAP Programmers
• Led the final preparation phase of the project, coordinated the team, and helped
meeting the global target of performance of the system guidelines.
• Carried out Unit Testing and Integration Testing with all possible Business
Scenarios to ensure minimum problems after Go-Live
• Participated in Cut-Over plans, defect resolution and logging of errors.
• Coordinated data transfer from legacy system to SAP R/3 system using LSMW
tool.
• Coordinated load of open PO, Inventory reconciliation and physical inventory for
go-live.
• Prepared user manuals and documentation according to clients’ standards.
Client: ASSURANT, MIAMI, FL April 2010 –
SEP 2011
Project: Development and support.
Role: SAP MM Lead Consultant.
Environment: ECC 6.0 (SD, MM, WM, FI/CO) EHP5.
Responsibilities:
• Analyzed the Business Requirements, studied the AS-IS Business Process, submitted a
solution design involving the TO-BE Business flows, documenting the operating procedures
and performed gap analysis between AS-IS & TO-BE Process in the production environment
• Involved in the design process, coordinated in defining project scope for the company and
planned implementation of SAP MM module with full life-cycle implementation using ASAP
methodology
• Expertise in configuration of all stages in Procurement to Pay
• Dynamically involved in the Realization phase by participating in tasks like Configuration,
Master Data Loads and Unit/Integration/User Acceptance testing
• Participated in configuration of the Materials Management module such as defining
Material Master Data, Purchasing, Inventory Management
• Have good experience in Configuration of Purchase Requisition, RFQ, Quotation
and purchase order
• Wide Knowledge in Goods receipt and Invoice verification
• Configured Material Types, Material Groups as per the requirements of the Client
• Configured screen layouts, Data screens, sub-screens, Fields and Field selection groups for
Material Master
• Configured Purchasing component of MM module by creating Purchasing groups, Source
Lists, Purchasing Info Records
• Configured service master, and have wide knowledge in creating service entry sheet
and service conditions
• Configured Vendor Master, item categories and Item-account assignment categories for
PO, Purchase Requisition, Defined Quota Arrangement Usage
• Configured Messages, Item categories, account assignment categories, access
sequences for Stock Transport Orders
• Configured Movement types, GR, GI, Transfer posting in Inventory management
component of MM module
• Created Purchase Requisitions, Purchase Orders, Scheduling Agreements, Contract
Agreements and Quotations
• Worked on Source lists, quota arrangement, Info Records for Standard, Consignment and
Sub-Contracting
• Worked with IM movement types, Goods Receipt (GR), Goods Issue (GI), stock
transfer, and transfer posting
• Configured allowable items in BOM headers and BOM items, configures BOM status
keys
• Maintained Planned independent Requirements by transferring data from Sales and
operation Planning. Configured schedule margin keys, capacity categories, standard value
keys, and control keys for routings. Configured allowable items in BOM headers and BOM
items, configures BOM status keys.
• Worked with Quality Certificates incoming/out going, Quality notification and
Quality control etc.
• Configuration and maintenance of Basic data like Inspection Characteristics,
Inspection Methods, Catalogs, and Samples etc.
• Worked with ASN and Inbound delivery
• Prepared training documents and user manuals
• Conducted end user and super user training in multiple facilities using web tools & net
meetings as well as taking training onsite
• Supported cutover plans and was involved in Go-Live of the project.
Client: Hershey’s, Harrisburg, PA Jan 2009-
Feb 2010
Project: SAP Implementation and Production Support.
Role: SAP MM Lead Consultant.
Environment: ECC 6.0 (MM, SD, QM & FI/CO).
Responsibilities:
Prepared Business Blueprint by considering “AS-IS” processes and by proposing “TO-
BE” processes and performed Gap analysis in the production environment.
Studied the business processes, mapped the processes and prepared templates in the
material management module for SAP R/3 implementation
Configuration of Materials Management module such as defining and assigning various
components of the company and material master data, Info Records, source list,
purchasing, Inventory
Configured Purchase Organizations, Purchase Information System, Pricing, Purchase
groups and other Purchase functions
Configured Purchase Request (PR), Request for Quotation (RFQ), Purchase Order (PO)
and Purchasing Info record and source lists
Configured transfer postings, goods issue, goods receipt for purchase order,
reservations and special stocks of inventory management
Developed interfaces, customer reports and enhancements specifications for the
development and migration of custom reports, forms and user exits and worked with the
developers in testing the reports and user exists created on timely basis
Carried out unit and integration testing with all possible business scenarios to ensure
minimum problems after Go Live
Participated in cutover plans and go live of the project
•
Client: RELIANCE Industries limited, Mumbai, India May 2006- DEC 2008
Title: SAP MM CONSULTANT.
Environment: SAP 4.7, FI/CO, MM, SD.
Responsibilities:
• Involved in the preparation of Base line configuration documents in the areas of
Enterprise Structure, Master data, Purchasing, Inventory Management and
Account Determination.
• Prepared standard configuration template documents for Material Master and
Vendor Master.
• Involved in user Interactions in collecting the data from the users related to
Master data and uploaded the master data from Legacy to SAP system using tools
like LSMW.
• Developed Functional Specifications for the gaps identified in the areas of Master
Data as per user requirements.
• Involved in Defining and Assignment of various organizational elements in MM
Module.
• Created New Material Types and defined control functions for Material types as
per the requirement.
• Defined Vendor Account Groups and Number ranges for vendor Master Data and
assignment of Number ranges to Vendor Account Groups.
• Designed Screen field settings for Material Master and vendor Master data and
designed functional specifications for custom defined fields for Material master.
• Configured the settings for Purchasing Info Record and Source list requirement at
Plant Level.
• Configured settings for Automatic Source determination in Purchasing
Requisition document.
• Worked extensively in Master Data, Purchasing, and Inventory management in
Goods receipts, Issues, transfer postings and Stock transfers.
• Actively participated in the workshops and presentations and guided application
to validate business processes and solutions with the end users.
• Configured settings for Stock transport orders and third party business processes
• Configured release procedures for Purchase orders, contracts and Scheduling
Agreements.
• Configured print control parameters for all external purchasing documents.
• Configured new Movement types and involved in settings related to account
determination.
• Involved in preparation of test plans and test cases and successfully conducted
Unit testing and Integration testing.
Client : CMC, INDIA Jun 2005 – Apr 2006.
Role : SAP MM Consultant.
Environment: SAP R/3 4.6C, Oracle9i, Windows 2000, ABAP/4.
Responsibilities:
• Mapping the Business Process Requirements of the client with that of SAP using
MM functionality.
• Involved in gathering requirements and Preparing the SAP MM Business Blue
Print of the Client.
• Configuring and Assigning SAP MM Organization elements in SAP R/3 system
which includes Plant, Storage Location and Purchasing Organizations.
• Configured Masters, which include Material Master, Vendor Master and
Purchasing Info record.
• Configuring attributes for Material Types and Assigned Number Ranges for
different Material Types.
• Interaction with cross functional module consultants in designing the integration
processes.
• Configured Document type settings and assignment of Number ranges for internal
and external Purchasing documents which include Purchase Requisition, Purchase
Order and Contracts.
• Configured IM parameters for various Goods movements like Goods receipts,
Goods issues, Returns and Stock Transfers.
• Exposure to different Procurement types like Subcontracting, Consignment, Stock
Transport order and Pipeline.
• Configured Automatic Account determination procedure. Involved in creation of
Account category reference, Valuation class, Valuation grouping code and
assignment of G/L accounts for various transaction keys.
• Configured print control settings for Purchase orders, Contracts, Goods receipts,
Goods issues and transfer posting documents.
• Inventory Management: Goods Receipt, Goods Issue and Transfer Posting.
• Involved in preparing End user Training documents and trained the users
effectively in SAP MM functionality.