Dino M. Gutierrez, PMP
*** *** ***** **** . **********, GA 30292
Home: 770-***-**** . Cell: 678-***-**** . Email: *********@***.***
Business Analyst / Program - Project Management
Results driven, detail oriented Certified Project Management professional
with experience in aviation maintenance, logistics, lean manufacturing,
project lifecycle, database development, process improvement, P&L, budget
management, personnel development, strategic planning, technical
instruction, production management, information technology,
telecommunications, power generation, engineering, risk management and
system validation.
CAREER HIGHLIGHTS AND ACHIEVEMENTS
Comprehensive experience in project management, executive and middle
management structure, solutions development, networking, quality assurance,
budget and risk management.
Strong background working with clients, designers and programmers to
identify requirements, provide cost analysis, create user interfaces and
develop implementation timelines.
Proven track record of increasing efficiency while completing projects on
time and under budget.
Hired, trained or managed 38 staff members in aviation maintenance and
production roles.
Articulate leader with exceptional communication skills. Extensive
knowledge with trends analysis and evaluation.
In-depth knowledge of project lifecycle and all phases of system and
software development.
Effectively managed team in conflict resolution during new system
implementation.
Successfully reduced manufacturing time from 13 to 4 weeks through
implementation of lean manufacturing practices and just in time supply
(JIT) techniques.
Developed standardized assembly procedure manual that reduced post shipment
costs by 20%.
Chosen 1st out of 5 senior project managers as Program Manager for
expertise with MILCON IT infrastructure and database development.
PROFESSIONAL EXPERIENCE
2014. Test/Validation Engineer, Belcan Inc., Griffin, GA
> Executed engineering data collection for validation and
testing of Caterpillar C175 and 3500 series generator sets.
> Piloted performance assessments on voltage
generator/alternator package configurations.
> Performed system modifications and design validation for
mechanical or software projects.
> Established production and testing schedules and managed
resource allocations.
> Oversaw assembly of test subjects in accordance with
testing protocols.
> Performed data analysis, testing, debugging, audits,
disaster recovery and problem resolution.
> Fully trained in OSHA-NFPA 70E safety protocol and
procedures.
(Continued on next page)
PROFESSIONAL EXPERIENCE (Continued)
2010-2011 Program Manager/IT Integration, CACI Inc., Fort Gordon, GA
> Led project management initiatives for the integration of
information technology efforts.
> Performed extensive assessments to monitor activities
including infrastructure, Military Construction and IT
services such as Enterprise Email, Active Directory, Data
Integration, IPS Upgrades, BRAC & SCCM Fielding and I3MP.
> Executed Infrastructure Library guidelines to ensure
achievement of the organization's mission.
> Facilitated internal and external meetings.
> Gathered information for report generation and status
updates.
> Conducted on site visits to retrieve critical data for
troubleshooting IT gaps and shortfalls.
> Performed needs assessments on six corporate structures to
improve existing procedures and meet future challenges.
> Involved in communicating corporate changes in policies and
procedures.
2009-2010 Information Technology (IT) Project Manager, CACI Inc.,
Peachtree City, GA
> Oversaw and directly managed business intelligence
initiatives for 114 projects in 19 states.
> Served as primary G-2/6 liaison to Regional Support
Commands to assess IT requirements on Military Construction
projects.
> Facilitated hardware, software and subcontractor service
acquisitions.
> Coordinated personnel resources and resolved complex
problems throughout software development life cycle.
> Participated in design analysis and pre- and post-
installation reviews.
> Assessed technical and functional information systems and
associated cost projections using USACE - Information
System Cost Estimate applications.
> Performed in-depth evaluations on processing systems for
strategic deployment of upgrades.
2008-2009 Senior Program Control Analyst, CACI Inc., Peachtree City, GA
> Senior level on-site project manager supporting process
development for the US Army Reserve Command (USARC) G-2/6.
> Managed comprehensive project scheduling and data tracking
for infrastructure requirements in new and refurbishment
constructions.
> Managed updates and support for over 350 construction
projects throughout 50 states.
> Researched, analyzed and recorded Information System Cost
Estimate applications.
> Verified cable and wire listings for compliance.
> Implemented web-based intranet-wide automated MILCON
project tracking system.
> Designed server-based centralized database system utilizing
SharePoint and Microsoft Project.
2006-2008 Production Manager, Kliklok-Woodman International, Decatur, GA
> Supervised 24 mechanics and electricians in the
fabrication, and assembly of capitol machinery in areas of
carton forming, top load/end load closing, and vertical
form fill packaging machinery.
> Developed input and utilization parameters for
Manufacturing Execution Systems (MES) to provide quality
data, enforcement of specifications and part/batch
traceability in effort to increase final product quality,
and higher productivity.
> Provided project development and oversight of a
manufacturing cell that led to a reduced manufacturing time
of 13 weeks to 4 weeks through implementation of lean
manufacturing practices and just in time supply (JIT)
techniques.
1986-2006 Aviation Maintenance Manager, U.S. Army, Various Locations,
World Wide
> Managed 6 maintenance repair facilities, Aircraft Engines,
Powertrain, Hydraulic/Pnuedraulics, Airframe/Sheet Metal,
Avionics/Electronics, Welding/Machine and Technical Supply
shops with the responsibility for training, morale, health,
and welfare of 38 soldiers.
> Responsible for logistics and accountability of over $6.5M
of aviation parts and supplies.
> Supervised twelve, 500 hour aviation airframe overhauls in
one year resulting in the success of 17,000+ annual flight
hours during Operation Iraqi Freedom.
(Continued on next page)
EDUCATION & CERTIFICATIONS
PMI - Project Management Professional/PMP (2011)
BS in Professional Aeronautics, Embry Riddle Aeronautical
University, Daytona Beach, Florida (2010) Magna cum Laude -
GPA: 3.76; Minor: Project Management
BICSI - Information Technology Systems Training (2010)
Designing Telecommunications Distribution Systems Course
Network Design, Inside/Outside Plant, Wireless Systems
Design, Voice/Data Cabling Systems
Lean Manufacturing Practices & Methodology (2007)
Implementation of Toyota Production Management, Just in Time
Supply Management, World Class Manufacturing
Federal Communications Commission License (1997)
TECHNICAL Microsoft Office Suite, Access, Vizio, MS Project, SharePoint,
AutoCad and ProE