Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
Summary
Highly motivated, results oriented and a leader in the information technology field. Having over 20 years of
experience in a diverse variety of fields (Energy, Insurance, Financial, Health Care, Telecom, Automotive,
Manufacturing, Engineering, and Computer manufacturing) has given me a very broad and international view of
the World economy. My skills have been honed over the years in the following areas (Networking and Design,
Database Administration, Project management, Web Development, Programming, Systems Architecture, and
System Engineering).
EDUCATION
University of Phoenix University of Detroit
Masters of Science in Computer Information Bachelor of Science Degree in Finance
Systems [WIPS*]
HARDWARE & SOFTWARE
Routers Cisco (6500, 2501, 2514, 2900, 1605, 1700, Pix), Switches, RIP, BGRP, Wireless Access Point,
Packeteer. NAI Sniffer, WireShark,
Proxmox VE, Windows NT Server, Citrix, Unix Solaris, Linux (Redhat, Gentoo, FreeBSD Mandrake, Suse,
Fedora, Centos, OpenSuse, Solaris, Centos, Redhat Enterprise), AIX, Snort, Iptables, Windows XP, Vista, OS/2
LANserver, Lotus Notes, Cyberark, Veritas, Clarion, Cisco, Juniper, VMware, Virtualbox, Dream Weaver 6.0,
AD, LDAP, Drupal, Joomla, Microsoft Exchange, DHCP, WINS, DNS, HTML, SQL Server,DB2, MySql,
PHPMyadmin, Oracle 7.3.4, 11G, Oracle RAC, Oracle ASM, TCP/IP, DHCP, VPN, WINs, IIS, Apache, BMC
Software, (Patrol), LDAP, Mercury Interactive (Loadrunner), Checkpoint Firewall,T-1, Fiber Optics, Cat 5, Perl,
AWK, SED, Postfix, PXE Boot, Kickstart, Postgres, MySQL, Nagios, Webmin, VMware, SAN, NAS, EMC
storage. Citrix Netscalar, Compaq Certified
EXPERIENCE
Centre Technologies
January 2014 – Present
Unix System Engineer
Contract
Responsible for creation and implementation of custom cloud setup for customer's application to work in two
data-centers with automatic fail-over. Vmware virtualization of Linux [Redhat Enterprise] High availability,
High Resilient Storage, clustering and custom monitoring.
• Vmware setup of 4 node stretch cluster [Houston, Dallas].
• DRBD implementation for block level replication.
• Implementation and integration of Redhat into Active Directory domain.
• Implemetation of Ubuntu, Nagios, for monitoring.
• Samba implementation for file-sharing of the DRBD block for application access.
• Bash scripts created for monitoring services, application, data access and authentiction failures.
Implementation of Proxmox Virtualization Environment.
Newpark Resources
October 2013 – December 2013
Unix System Engineer
Contract
Responsible for 70 Virtual servers. Managing them and monitoring them with Nagios, Thruk and Vmware.
Setup, configuration, provisioning and backups of the Unix environment integrated for Authentication with AD.
Server script enhancement and automation.
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449
Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
Hewlett Packard
April 2013 – October 2013
UNIX System Engineer
Contract
Responsible for creating, implementing and testing of new monitoring to help catch issues in the customer’s
environment. Creation of scripts using bash, and AWK to increase the efficiency of the application server and
notify Admins of issues with JVM’s and space issues among other things. Responsible for the Project Portfolio
Management application and implementation of new instances for new customers wanting access and creation of
their own environments. Replaced the frontend webservers and converted them from Windows /IIS, ISAPI to
Linux, 64bit, Apache servers with several key mods to increase available uptime and information from the
servers operation. Proliant servers were setup for our new Linux/Apache environment.
JP Morgan Chase
April 2012 – April 2013
Global UNIX System Engineer
Contract
Executing procedures and changes in the firm’s environment that is compliant with company policies and ITSM
standards.
SAN migrations and changes executed according to change management system and or according to incident
tickets to correct reported issues. Resolving issues with clustering, multipath, Veritas, NFS, ssh via boksm and
password less entry.
Assuring that change management is adhered to throughout the organization and eliminating and or minimizing
financial risk and or exposure
Disaster recovery implementation and redundancy.
Serve as an expert advisor to senior management in the development, implementation, monitoring and
maintenance of our UNIX environment
Responsible for Linux / UNIX, [Redhat Enterprise, Centos, Ubuntu] Solaris, AIX servers worldwide. 50,000
plus servers located worldwide.
Global UNIX server administration, OS, Level 2 Administrator
Software responsible for:
Tivoli Endpoint administration Windows server media and master configuration for
Netbackup netback up.
Boksm [Global Authentication] Migration of over 5000 VM servers
VMware migration Admin Oracle, (ASM, CRS)
Responsible for all technical aspects of migration Solaris, (ZFS)
and problem resolution during the after. Tools (ILO, LOM, KVM access, Nagios, Netcool,
Windows 2003 server configuration for netback up Peregrine)
of windows environment.
Windows server V2V migrations and static route
configuration.
Hostgator
January 2011 – August 2011
Webhost Support
Webhosting technical support, management and running of multiple sites.
DNS, Nameserver tech support, Bind, SMTP, POP3, IMAP, PHP, CSS,
Drupal, Joomla, Word press, php technical support
Cpanel, WHMCS, (Management tools for webmasters to manage their environments and the environments of
their customer's websites)
WHMCS (Complete billing, support tool for webmasters)
Domain Name registration
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449
Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
Shell Scripting
Web Development – Drupal, Joomla, HTML, PHP
Linux, Win2k, (Webhosting)
KBR Corporation
June 2010 – April 2012
Senior Systems Engineer
Responsible for the management, implementation, testing, monitoring, and updating of our Global Content
Management System [ECM], Global Survey System [Opinio], and Global Digital Marketing system [Lyris],
Introspect records manager
Implementation Oracle Fusion Middleware 11g and 10g Web logic 10.3.4, Oracle DB 11G, Oracle Universal
Records and Universal Content Management.
IIS configuration to work with multi tier applications and Oracle database backend.
Configuration of F5 Pool load balancing for our applications.
AD setup for ECM systems Tomcat administration and deployment of applications.
SSL certification setup and configuration.
Responsible for making and implementing changes in our production and testing environment of Lyris, Opinio
and ECM. Proliant Servers setup for applications
Lakota Data Center
May 2010 – Oct 2010
NOC Engineer
Night Operations NOC Engineer. Local datacenter, downtown Houston. 24/7 operation.
Cisco Configurations changes for our data customers
Installation of servers, routers for customers. OS installs, Redhat, Centos, Ubuntu.
Assignments of IP addresses from our iplan management system
Modifications of DNS entries to Bind for our customers.
Kickstart implementations to configure servers for clients.
Resolving issues with customer installations and servers.
Installation and configuration of customer servers, software and hardware.
Monitoring of network traffic and fraud, malware and copyright infringement.
Shell Oil Corp
Sept 2008 – March 2010
Systems Architect
Contract
Global Vista Implementation
Global Custom application development
Implementation of VMware environment
Implemented a VMware environment for our team. The virtual production servers were used for our projects.
Two production environments were created, for redundancy, fail-over and so that we had full authority in this
environment. We used ftp, SQL Server, Outlook, Office and other applications in our production environment. A
testing environment was created for use to test any applications prior to us rolling it out to the customer or for our
production use.
Vista Roll out to all refineries
Certified that the refinery applications were able to run with the Shell customized version of Vista
Sniffer setup for network component detection.
Divestiture of Central America (Guatemala, Nicaragua, Honduras, Panama and San Salvador)
Setup of swapkit to migrate users into for hand over to buyer. Migration to new HP Proliant G series server.
Worked with EDS, Systems and AT&T for cut-over from Shell to buyer.
Plan and implementation of complete Cisco network work migration to customers Subnet and network for
completion of sale.
Carve out all users to be migrated. Sanitized all user laptops and desktops, removing all Shell specific
information and applications for handover to the customer.
Support of the environment and problem resolution after the handover for 30 days.
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449
Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
SQL Server 7.0 (applications which use this DB as a back-end)
Oracle 10G, weblogic (applications which use this DB as a back-end
Linux, NT 2003 Advance server
Setup swapkit environment for our use with production applications, test environments, migration environments.
This was done with RHEL and VMware, NT Server.
It was done to give our group total autonomy to create and tear down any environments we needed for our
projects.
IDMS, API / SRBI
Active Directory
Web Development and Site management (Drupal, Joomla)
MySQL, Postgres,
MySQL was used to create website with Drupal as the CMS for our projects. It allowed all users to access this
site for critical information and allows us to distribute information once the users as not longer on the corporate
email system.
Huntsman Corporation
Dec 2007 – Sept 2008
Systems Architect
Contract
DBA / application support and implementation.
Setup configuration and management of the following applications (GEARS, OmniRim, Getpaid, PPMC). These
applications run on the NT Server, and Linux(Redhat Enterprise).
Responsible for implementing and recommending changes in our Gears, OmiRim, Getpaid and PPMC
environment. Kickstart implementations to setup and configure new Linux servers for our environment.
Their environment of applications is mostly a web frontend (IIS, Apache and a DB backend of Oracle 10g or
SQL Server 2007)
I was brought in the middle of most of the implementations and had to play catchup and implement them
according to the predetermined timeline. All apps were successfully implemented per the agreed upon timeline.
SQL Server 7.0 (applications which use this DB as a backend)
Oracle 10G, weblogic (applications which use this DB as a backend
Linux, NT 2003 Advance server
Getpaid (SunGard app), ERam (D&B)
Linux RHEL application used globally to collect debts in local currencies as quickly as possible. This application
was in the process of being upgraded. It was recommended that we create a virtual server environment,
(Production, Testing, Development, and QA). This process was started before I left but it is unknown if it was
completed.
GEARS (Custom Auditing IIS app, management of upgrades and testing for promotion to production
environment), OmniRim (Custom document management app, implement to our production environment and
testing of upgrades prior to production roll-outs)
Appworx Enterprise management scheduler
SAP – Sales and Distribution, Finance, Quality Management, Production and Plant Maintenance Production and
Plant Maintenance
JP Morgan Chase
Dec 2006 – December 2007
Application Manager
Application support.
Nightly runs of Global Trading system to provide traders with their positions and their risk exposure. The run
cycle is from 15:00 to 06:00. Nightly completion is critical.
Modification and enhancement of that application on a weekly basis or when necessary were written, tested and
promoted to through development to production following our approval process.
System release of patches etc on a bit weekly basis.
Deployment of new hardware to support our application.
We used VMware in a Linux environment to deploy our virtual servers for the complex calculations that were
needed to produce the traders’ positions nightly.
Use of MOM for server monitoring and control of our environment.
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449
Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
Managed nightly run of our Global Trading application for a successful production of the morning report. When
there were problems, I would coordinate who would need to be involved in the event conference call when
necessary to resolve the issue. Should a bug fix be necessary used our incident management system to record the
problem and the fix. Worked within our change management to get the fixed coded, tested, and implemented in
production once approved.
SQL Server 7.0,
Oracle 10G, Admin
NT Server Advanced 2003,
Linux Admin, shell scripting, BASH
Perl Scripting
Ctrl -M Admin (Enterprise scheduler)
DELL
June 2005 – December 2006
Application Management III
SQL Server 7.0, Admin, DBA.
Oracle 10G, Admin, DBA.
IIS web design, admin
NT Server Advanced 2003, Admin
Terminal Server, Admin
Linux, Apache
Citrix testing of our application for outsourced sales personnel.
Application development, with the use of SDLC methodology.
Use of websphere for out inhouse application, (Symphony). The application was used by all of our sales staff
both in the US and internationally.
Testing of updates for NT OS and execution of our change management process.
Work with Networking, DBA’s, programmers and customers on upgrade weekends for our symphony application.
Part of the team to implement changes in our Symphony environment. Changes were done about 3 to four times
per year.
DBA for our patch tool project Creation of stored procedures
Setup and configuration of DB server (SQL Server Support and deployment of our sales app
Enterprise version) IDD/Symphony in US, Europe, Asia, Philippines,
Setup of databases for development and production South America
Setup of maintenance plans, scheduling of jobs Supporting databases on both Oracle 10G and SQL
Empirix monitoring Server Enterprise
Setup monitoring our IDD/ Symphony web sales Work with Development and sales to distribute
application. application out on launch night.
Monitoring server via ping, trace route sampling Debug application prior to launch
Monitoring via FIM page sampling Resolve issues when application is in production.
Monitoring responsiveness of our databases serving On Call 24 /7 internationally
our apps via sampling
Dunn Center
December 2003 – June 2005
Senior Systems Analyst
CMHC (Medical Application) Administrator Backup and restore of data
CMHC (Medical Application) application developer Management of Multiple Lpars
SQL 7.0 DBA Implementation of disaster recovery for this system
AD setup for our environment. and its apps
Implementation of IBM P570, 2 Lpars, AIX 5.3,
Tivoli 5.2 Implementation of Email gateway server (Redhat
P570 system administrator (AIX) 9.0, Software Mirroring, Postfix, Awstats, Samba).
Purchase and installation of IBM P570 and AIX 5.3 Maintained a 95% uptime. This server replaced a
Administration and security of the box and previous, non-documented BSD gateway setup by a
applications contractor. Once in place uptime was increased,
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449
Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
spam was decreased, more statistics were generated Network Security (Proposed implementation of
about amount of email, countries of origin, states of Dragon Software)
origin, domains of origin, etc. There was one Implementation of DHCP throughout the
incident that occurred which proved the value of organization
this Linux gateway. The cause was that the Sniffers (Ethereal, NAI) Zoomtown / Cincinnati
Exchange server whose email database had reached Bell, Cincinnati, OH
its capacity stopped delivering mail. The gateway Implementation of Acorn Activity Based Costing
was holding all incoming mail. The decision was system. This application allowed us to see our
made by my boss to reboot the gateway. No mail profitability down to the customer level according
was lost but they later figured out exchange was the to a number of accounting categories. It runs with
issue. SQLServer 7.0.
Managed a team of 2 Technicians and one Administration of network. We had NT running on
contractor, Wintel server side and Wintel Desktop and AS400.
support. Worked with AT&T managing our data circuits and
Migration of CMHC application from 4.0 to 4.1 voice circuits also. Handled everything from
Management of CMHC (Medical Application) troubleshooting to testing to reconfiguring.
which resides on a RS6000. Responsible for routers and switches; (3640, 2900),
Development of applications within the CMHC Dell (3024). Setup a T-1 connection directly to our
application. network from a major customer site. Their access
Migrated the Users of the CMHC application to a was limited and they were setup to print directly to
Browser user interface. our branch locations around the United States via IP
Securing the network and managing bandwidth. printing. Also have a VPN backup system for
Administration of Active Directory in W2K and failover if the main T-1 line goes down for any
2003 server environment reason.
Administration of Citrix and Terminal Server Initiated VPN connectivity to our site via our PIX
Management of Cisco Routers and Switches ( 1600, Firewall using 3 DES securities.
1721, 2600, 2900, 3640, PIX), HP 4104 gl switch Redesigned network to the Cisco ISO model of
Network Infrastructure design (Cisco Routers, PIX Core, Distribution and Access layer. Eliminated the
firewall, Switches) Access layer (got rid of hubs and went to a
Pix Firewall management manageable switch network). This was done on all
Implementation of Linux Redhat 9.0, Software our remote locations both in the the US and abroad
Mirroring, Postfix to give controllability down to the port level.
WebMaster Increased performance, accessibility and
Evaluated Nagios to install in our environment for manageability.
management of our network.
SharkTECH Computer Consulting, Cincinnati, OH.
OKI Bering, Cincinnati, OH
January 1999 – January 2003
March 2002 – September 2003 Senior Consultant
Network Engineer
Designed implemented and managed several
Lotus Notes Administrator (Domino 6.01) organizational websites. Hiring personnel for
Windows 2000 server administrator and engineer. project implementation of New servers, network
On a AS400 management and website design.
Pix Firewall management, management of Cisco Management of multiple websites
3640, 2600, & IOS Design and implementation of multiple websites
Purchase and implementation Packeteer 6500. This Designed and managed several networks using NT
is being used for bandwidth shaping and to give and Linux.
mission critical applications priority on our Implementation of Linux servers (Apache, Ssh, ftp,
network. With the implementation of the hardware email, Postgres)
we were able to do the following. Network Architectural Design.
Designate which applications should have the most Broadband Internet access.
bandwidth and during which hours. Database Design
Eliminate from our network any nonessential or
prohibited protocols (i.e. Streaming audio, etc. ) Deloitte Consulting, Cincinnati, OH.
Implementation of Linux CVS for software
program management / versioning. This allowed the March 2000 – Dec 2001
programmers to code and check in and out their SENIOR CONSULTANT
code without heads of versioning.
Project Manager (EMC Project)
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449
Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
RFP for a state government to redesign their location which required coordination of data from
network for support of Oracle 11i and California, Texas, Taiwan and Australia. Tasked
implementation of PKI security, Checkpoint with providing the application resource on each of
Firewalls. their network segments to function efficiently and
Part of a team of 50 people to implement all of the to replicate any data in a timely fashion.
Oracle Financials for the State of New Jersey. Implemented our Network for the corporation from
Tasked with network security using PKI and the ground up. Chose hardware platform and
Firewalls to protect the data and application. We installed. Setup for all consultants to give them
had to do a RFP which took about 2 months and remote access, shared space, ftp, disaster recovery,
then a pilot to show the feasibility. Siebel access and email.
Project for Financial Institution to implement BMC Responsible for maintaining a secure network
Software products (Patrol Agents) for Oracle, environment, and implementation of VPN so that
Exchange, and SQL Server. employees could do their day-to-day tasks and work
Lead the implementation of BMC Software’s Patrol remotely.
products for Oracle and Microsoft Exchange. The
project consisted of 3 people. The product was to Attachmate Corporation, Cincinnati, OH. June 1997
be used to create benchmarks and then allow the – June 1998
Administrators to resolve problems prior to them Senior Consulting Systems Engineer
happening. Details available upon request.
Assigned to EMC to work on implementation of
SAN’s. Vanstar Corporation, Columbus, OH.
Managed teams of consultants on multiple December 1996 – June 1997
engagements. Senior System Engineer Enterprise
Participated in assignments ranging from Details available upon request.
internetworking, Oracle, web and stress testing.
Nationwide Insurance, Columbus, OH. February
Connaissance Consulting, Columbus, OH. 1993 – December 1996
Senior LAN Engineer
June 1998 – March 2000 Details available upon request.
Lead Consultant
American Electric Power, Columbus, OH.
Support and implementation of Seibel (server August 1995 – April 1996
configuration, desktop configuration) Senior LAN Engineer
Responsible for project management, problem Details available upon request.
resolution project deadlines and reporting status to
senior management. Cintech Tele-Management Systems Inc., Cincinnati,
Siebel (CRM) installations and configurations OH.
DBA for Siebel Pharma project using Oracle 7.3.4 January 1992 – February 1993
Managed the implementation and customization of Senior Telecommunications Specialist
Siebel Pharma. Reported back to senior Details available upon request.
management on status and when issues arose.
Resolved and issue with the customer VP who had Electronic Data Systems, Troy, MI. & Dayton, OH.
questions on our implementation methodology by
writing a response explaining how our cost due to July 1989 – January 1992
implementation methodology would be lower with Microcomputer Support Analyst
real dollar amounts. After reviewing it he was Details available upon request.
convinced and understood our direction and why.
Created a conference room pilot system to demo for Frieden Alcatel, Farmington Hills, MI. January
the customer with their data. Once it was approved 1988 – April 1989
created a test and production environment for Account Executive
Siebel. This ran with Oracle 7.3.4 on the backend. Details available upon request.
The project consisted of 4 people.
NT Server installation and configuration, Ernst & Whinney, Detroit, MI.
troubleshooting, OS updates, hardware June 1984 – December 1987
configuration. Programmer Analyst
SQL Server installation, configuration, backup, Details available upon request.
maintenance.
Oracle installation, configuration, and backup.
Implemented the network environment for the
implementation of Siebel for an international
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449
Gary Manigault
Cell: 832-***-****
E-Mail: **********@*****.***
Gary Manigault
19351 Little Pine Lane, Katy, TX. 77449