SUMMARY
An aggressive and results driven management professional with extensive
engineered-to-order product design and delivery experience. A proven
leader, communicator, and problem solver possessing over seventeen years of
experience as a licensed civil/structural engineer and an innovative
manager of design and project management teams. Daily focus is on
successfully integrating the technical aspects of engineering into an
overall business model for sustainable growth, client satisfaction, and
profitability.
QUALIFICATIONS & SPECIALTIES
Civil/Structural Design Code Compliance LEED Design
Licensed Engineer
Turnkey Solutions Product Development Project Management
Client Focused
Performance Metrics P&L Responsibility
Team Builder Execution Culture
Software Implementation Continuous Improvement ISO 9001 QMS
Safety Excellence
PROFESSIONAL EXPERIENCE
Engineering Manager, Lectrus Corporation, Houston, TX
(07/2011 - 02/2014)
Principal Structural Engineer, Sartartia Fabrication, Sugar Land, TX
(10/2009 - 07/2011)
Vice-President of Engineering, Porta-Kamp International, Houston, TX
(11/2008 - 09/2009)
Manager of Engineering Operations, NCI Building Systems, Houston, TX
(02/2007 - 10/2008)
Chief Design Engineer, Whirlwind Steel Buildings, Houston, TX
(06/2004 - 02/2007)
Design Engineer II, American Buildings Company, Eufaula, AL
(04/1998 - 05/2004)
Design Engineer, American Steel Building Company, Houston, TX
(08/1996 - 03/1998)
PROFESSIONAL ACTIVITIES
Alabama PE License - License Number 27451
ASCE Member
Louisiana PE License - License Number 36097
NSPE Member
New Mexico PE License - License Number 20448 SEI
Member
Texas PE License - License Number 103156
AISC Member
NCEES Record - Record Number 35295
APA Member
LEED Green Associate
Eagle Scout
DOL Card - OSHA 30-Hour Construction Industry Course
Sandler Management Training
High Performance Leadership Training
SOFTWARE SKILLS
MS Office (Word, Excel, Project, PowerPoint) STAAD, RISA-3D, GT-
STRUDL, MathCAD
Oracle ERP, Macola ERP, Epicor ERP AutoCAD, Revit,
SolidWorks, MBS, CFS
EDUCATION
Bachelor of Science in Civil Engineering, August 1996, Louisiana Tech
University in Ruston, LA
GPA 3.24 / 4.00 Overall
Chi Epsilon - Civil Engineering Honor Society
Pi Mu Epsilon - Mathematics Honor Society
President's List
Dean's List
ADDENDUM I
PROFESSIONAL EXPERIENCE
07/2011 - 02/2014 Lectrus Corporation
Houston, TX
Engineering Manager
. Recruit, develop, and lead the project management and multi-disciplinary
engineering teams after 70% turnover in 2011 due to direct competitor
raiding and low morale.
. Design and implement performance metrics to track on-time delivery, bills-
of-material accuracy, drawing quality, and labor absorption. 15%
improvement in accuracy and 12% improvement in labor absorption.
. Develop and institute project dashboards to track project cost, schedule,
quality, and profitability. 6% job level margin improvement and 21%
improvement in on-time delivery.
. Lead, motivate, and drive Houston team to design and fabricate new
products in the international, solar, and data center markets.
. Stabilize department and operations team during major overhaul of
corporate leadership and plant VP/GM positions by the private equity
investors.
. Successfully prepare and lead engineering and project management teams
during ISO 9001 compliance audits and supplier qualification audits.
. Management of 21 direct reports at peak
. Awarded the position after a management skills and leadership assessment
by Psychological Associates of St. Louis, MO.
. Accepted a severance package after reorganization of engineering to
Lectrus' Tea, SD facility.
Lead and direct the activities and performance of the project management
and multi-disciplinary engineering teams for Lectrus Corporation's Houston
operation. Full responsibility for the structural design, electrical
integration, and project management of complex, engineered-to-order
electrical equipment enclosures, data centers, operator centers, control
centers, and blast resistant enclosures. Accountable to senior management
for project level P&L and the mitigation of margin erosion through risk
assessment; project gating; change order execution; real-time scheduling,
and value engineering. Coordinate and oversee the extensive customer
interface during FEED, fabrication, certification, and installation to
ensure compliance with all project specifications. Develop and evaluate
department processes in order to maintain ISO 9001 certification and
desired supplier quality management systems.
10/2009 - 07/2011 Sartartia
Fabrication Sugar Land, TX
Principal Structural Engineer
. Accepted the position after a layoff from previous employer with a short-
term goal to add strategic planning, process development, and technical
improvements to a start-up.
. Expanded Laser Shot's shooting range product line by designing and
fabricating a modular, small arms indoor range which has directly
increased fiscal 2011 sales by $5 million.
. Principal and sole structural engineer for Laser Shot's and Sartartia
Fabrication's design and development of next generation weapons training
systems.
. Left the company after being recruited to an engineering manager position
with a company listed on Inc. Magazine's 5000 fastest growing companies
in America.
Lead the design team for a fast growing manufacturer/fabricator of
specialized modular shooting ranges, modular shoot houses, and mobile
ranges for the military and law enforcement. Develop and PE stamp design
packages that comply with federal and DOD standards for design,
construction, and facilities performance. Manage all aspects of
multiple bid, design and construction projects ensuring on-time and under
budget project completion. Investigate problems and coordinate solution
alternatives during FEED, fabrication, construction and commissioning.
Current and completed projects include:
1.) US Marine Corps MOUT Live Fire Facilities
2.) Modular Indoor Small Arms Range for US Navy CENSECFOR Chesapeake
Bay, VA
3.) Modular Small Arms Range for US Border Patrol Station, Lordsburg,
NM
11/2008 - 9/2009 Porta-Kamp International
Houston, TX
Vice-President of Engineering
. Key part of the new senior management team recruited to turnaround a $25
million global manufacturing company
. Managed 150 people at a 260,000 square foot facility and a joint venture
operation in Algeria
. Successfully maintained operational discipline to support debt reduction
strategy. Overall debt liability reduced 30% over a ten month period
under challenging economic and market conditions.
. Implemented industry leading BIM software solution to reduce drawing and
bills-of-material errors and omissions by 20%.
. Positioned Porta-Kamp as the industry leader in the design, production
and performance of modular arctic buildings by completing two $3 million
camps for the North Slope in Alaska.
. Lowered production costs and increased throughput by standardizing core
product lines.
. Left the company after economic conditions during the 2009 recessionary
period forced the sale of the company assets to a special situations
investment group.
Direct project managers, engineers and designers in the development,
intelligent design, human engineering and production of industrialized
modular buildings for remote oil field, pipeline, mining and construction
sites around the world. Engineer structures to perform reliably and
efficiently in extreme climates from arctic conditions on the North Slope
to tropical conditions in South America to desert conditions in North
Africa and the Middle East. Provide design expertise for services to
support camp operations, including site environmental plans, water and
sewage treatment systems, storage tanks, refrigeration equipment,
generators, mobile trailers, and crane and helicopter rigging and lifting.
Full responsibility for P&L and accountable to the Board of Directors for
value creation, organic growth, intellectual property and accretive
acquisitions.
02/2007 - 10/2008 NCI Building Systems
Houston, TX
Manager of Engineering Operations
. Successfully merged low and mid complexity design groups into one
cohesive design group. Merger facilitated increased productivity and
engineering quality by sharper resource allocation and technical skill
development
. Seamlessly implemented new design software package obtained through the
Robertson-Ceco Corporation acquisition. Efficiencies gained from the
state-of-the-art design platform continue to drive corporate wide
increases in productivity and the quality of engineering deliverables.
. Implemented and tracked monthly, quarterly and yearly on-time performance
and job cost metrics for all design projects. The results oriented
outcome is a heightened awareness of accountability, profitability, and a
sharper focus on prioritizing and completing the task at hand.
. Management of 7 direct reports and 5 contractors
. Left the company after being recruited to a senior management position
Lead the internal design staff and remote contract engineers for one of
North America's largest integrated manufacturers of metal products for the
non-residential building industry. Manage all aspects of quality, cost, and
timeliness of engineering output by the creation of operations processes;
monitoring of performance metrics; on-
going skill development and mentoring. Responsible for the final review and
PE stamp of building permit drawings, fabrication drawings, and structural
design calculations.
06/2004 - 02/2007 Whirlwind Steel Buildings
Houston, TX
Chief Design Engineer
. Seamlessly tested and implemented a new estimating, design, CAD and
detailing software package with minimum loss of production time.
. Successfully prepared and directed the completion of two annual AISC-MB
comprehensive audits of engineering and manufacturing. The AISC-MB
certification is directly responsible for increased market share and
sales volume.
. Assisted with the streamlining of the production job-flow process and the
training and development of subcontract engineers and offshore
outsourcing which allowed for a 33% reduction of the in-house design
staff and a 6% reduction of the engineering cost to 10% of sales.
. Management of 5 direct reports and 6 contractors
. Promoted from Design Engineer to Chief Design Engineer
. Left the company after accepting an engineering manager position with the
industry leader in metal building systems
Direct design staff and remote contract engineers for a diversified
manufacturer of metal building systems and metal building components.
Coordinate with the sales team, estimating group, supply chain, and five
regional manufacturing plants throughout all phases of scheduling, design,
fabrication, and erection. Responsible for the final review and PE stamp of
building permit drawings, fabrication drawings and structural design
calculations. Maintain and update engineering policies and procedures,
design manuals, quality manuals and weld manuals in order to achieve AISC-
MB certification.
04/1998 - 05/2004 American Buildings Company
Eufaula, AL
Design Engineer II
. Promoted from Design Engineer I to Design Engineer II
. Fast-Track Group assistant squad leader
. I left the company after six years to return to Houston, Texas along with
the potential to advance into a chief design engineer position.
Responsible for the design and structural analysis of new and existing low
rise, non-residential metal building systems. Review building permit
drawings, fabrication drawings, and structural calculations to ensure
conformance with building codes and project specifications. Interface with
clients, architects, plan checkers, general contractors, steel erectors and
all levels of management.
08/1996 - 03/1998 American Steel Building Company
Houston, TX
Design Engineer
Responsible for the design and structural analysis of low rise, non-
residential metal building systems. Review building permit drawings,
fabrication drawings, and structural calculations to ensure conformance
with building codes and project specifications. Interface with clients,
architects, plan checkers, general contractors, steel erectors and all
levels of management.