Bradley Bruce
**** ******* *****, ***********, ** 44077
Phone: 704-***-****
E-mail: ******@******.**.***
QUALITY/PURCHASING
Project Management, Complex Analysis, Design, Warranty Investigation,
Product Development, Invoicing, Compensation, Purchase Orders, Logistics,
Budgets/Forecasts, Auditing & Compliance
Management level professional Purchasing & Quality associate with proven
track record in planning, auditing and problem solving. 22 years of hands
on experience. Six Sigma Green Belt certified with a long history of Lean
implementation.
Avery Dennison
Quality& Process Engineering Manager Jul 2012 to
Present
Painesville, OH - Performance Tapes
. Manager of Quality team for the site including A3 planning and budget
. Manager of Process Engineers for coating department
. Overseer of multiple improvement projects for equipment upgrade
. Implemented system to reduce complaints from customers by 10% and related
payouts to customers for complaints by 25%
. Managed improvement of supplier quality practices to reduce number of
open items and claim dollars
. Introduced method for SPC analysis in production area for improved
processes
. Created lean process for certification of analysis sent to customers
. Developed method for quality performance feedback to departments for
continuous improvement
. Ensured supply of quality products to many high profile customers
including FDA regulated medical device
. GMP applied to specific products
Solar Gard
Quality Manager Apr 2011 to July 2012
San Diego, California - Solar window film manufacturer
. Manager of Quality team for window film, industrial film and medical
device
. Implemented FMEA and 8D processes for analysis
. Added PPAP to product development process and led through a key product
introduction
. Managed improvement of supplier quality practices
. Utilization of GMP with specialty products
. Introduced MRB management system
. Champion for WCM Six Sigma projects
. Implementation manager of Quality inspection module in SAP
. Completed projects for major warranty and internal non-conformance issues
. Facilitated growth of Quality Dept. by 20%
Vantage Mobility International Apr 2008 to
Nov 2010
Quality Director
Phoenix, Arizona - Automotive conversion facility
. Established the Quality department & engaged organization to adopt the
Quality Initiative
. Implementation of containment process
. Reduction in warranty by over 50%
. VOC survey generated and sustainable process in place
. Growth of Quality Department from 1 to 17 personnel
. Was integral in the implementation of Design for Six Sigma in the company
. Leader of 2 Six Sigma projects and achieved Green Belt certification
using Six Sigma principles including DMAIC and DMADV
. Project manager for VMI control unit development that ties directly into
CANBUS of vehicles
* Correction of historical issues
* Streamline of firmware process
* Complete supplier testing for function
* In-house testing on vehicles
* Containment process
. Increase of ROI from less than 2% to over 6%, directly related to Quality
improvement
. Large number of Lean Initiatives successfully put into operation
. Application of ISO 9001 requirements: PPAP, FMEA, Control Plans, Work
Instructions, as well as principles of Root Cause analysis, A3, 5S and
APQP and Toyota Production System
. Reduced inventory of incoming and finished goods by 75%
. Established MRB for rejection and tracking of rejected parts
. Implemented corrective action system to address quality issues company
wide
. Essential part of line efficiency improvements
Eaton Corporation Dec 2006 to Apr
2008
Jumpstart Quality Manager Aug 2007 to Apr
2008
Based in Charlotte, NC - Truck Division
. Part of an 8 member traveling team
. Performed six week engagement at each of Eaton's factories to make
significant quality gains
. Organized in-plant teams to achieve set goals
. Implemented Lean and Six Sigma initiatives: Value Stream, 5S, APQP
. Review and improvement of documentation: FMEA, Control Plan, Work
Instruction
. Required to demonstrate minimum 50% reduction of internal defects
by the conclusion of each project, successful at each location
Operations Excellence Manager Dec 2006 to
Aug 2007
Charlotte, NC Manufacturing Plant - heavy duty and medium duty truck
clutches
. Management of Quality operations, ensure that Eaton Quality
Standards are met
. Implementation of Quality initiatives
. Lean System leader following Eaton Lean principles
. 5S system leader
. Successful move of plant operation to larger facility
. Transformation of facility from remanufacturing to OEM supplier
. Development of new quality systems utilizing ISO 9001 standards
. Direct contact to OEM customers, dealing with both return
authorization and warranty
. Use of 8D for full analysis of issues
. Member of Plant Safety Team, ensuring OSHA compliance
Hyundai Motor Manufacturing Alabama Nov 2004 to
Dec 2006
Assistant Manager
Supplier Quality Development (Division of Purchasing)
. Assigned to TS 16949 implementation team, with successful results
. Chassis/Body/Trim parts
. Large scale audits of suppliers, evaluating quality, process, capacity,
shipping, management systems, etc.
. Successful launch of full model change Sonata, currently focusing on all
new Santa Fe
. Performing analysis of complex quality issues - using DOE, 8D, Six Sigma
tools
. Commodities: Electrical, Chassis, Body, Interior/Exterior Trim, Engine
. Warranty claim analysis & resolution
. Working closely with JD Power & Associates to create world class plant
and suppliers
. Leader of HMMA Paint Shop improvement task force team
. Conduct instructional seminars for suppliers - FMEA, OEE, Value Stream
Mapping, 5 S, etc.
. Coordinate VA/VE activity
. Present quality issue findings to top management weekly
Honda of Canada Manufacturing Apr 1991 to
Nov 2004
Technical Coordinator June 1999 to Nov
2004
Purchasing Department
. Dual role of Quality Representative and Buyer for New Model
. Purchasing Project Leader for new models introduced at the Honda
Canada facility
. Chassis/Electrical specialist
. Manager of time & attendance for Chassis/Electrical Group
. Successful introduction of five major new models - Acura MDX, Acura
EL, Honda Pilot, Honda Ridgeline & Honda Civic
. Working directly with Honda R&D to resolve many design issues
. Coordinator of VA activities with suppliers
. Ensure that current Honda suppliers were fully prepared for new
model introduction
. Evaluate new suppliers prior to awarding business and prepare them
for mass production start up
. Coordinator of localization projects
. Confirm that suppliers meet all quality and testing requirements
(PPAP submissions)
. Use of 5 Why's for analysis as well as PDCA
Team Leader Nov 1996 to June 1999
Parts Quality New Model Group
. Chassis/Electrical specialist
. Successful introduction of Honda Odyssey, as well as yearly minor
model changes
. Concentration on brakes, suspension, steering, fuel system, as well
as many electrical components
. In charge of detailed evaluation of supplier testing for welding,
casting, stamping, forging & painting
Quality Engineer Feb 1994 to Nov 1996
Parts Quality Mass Production Group
. Worked directly with suppliers to address assembly line & warranty
concerns
. Plastic parts analysis - interior garnishes, mirrors, door liners,
bumpers, etc.
. Chassis/Electrical - seats, tires, locks, door handles, etc.
. Member of Plant wide Joint Health & Safety Committee
Line Quality June 1992 to Feb
1994
Final Assembly Department
. Statistical analysis of assembly line measurements (x-bar-r charts,
torque wrench calibration, fluid levels, etc.)
. Analysis & recovery of line problems (parts fit, wrong parts, etc.)
. Management of lot control system
Personal Achievements
. Participant in United Way Day of Caring 2013
. Worked with minority T.W. Harvey high school students in Painesville in
summer business courses
. Participant in United Way food drive and food bank in the spring of 2013
. United Way Campaign chair for Hyundai
. Finalist in worldwide Honda competition for innovation (quality
initiative with $1.5million immediate savings to Honda)
. Lead member of Aluminum casting/forging team
. Conducted ground breaking DOE on wheel balance for Tire Pressure
Monitoring System that set design standard for all future Honda models
. Oversaw the implementation of TPMS (first model for Honda)
. Successfully directed the planning and start up of a new factory (from
ground breaking to mass production) supplying parts to Honda Canada
Manufacturing
. Developed brake burnishing standard for Honda drum in disk brakes through
detailed analysis and testing
. Oversaw the completion of root cause analysis on many casting issues
requiring complex investigation
. Selected member of North American Honda initiative for Outstanding
Quality to improve utilization of FMEA's
. Completed several Honda "NH Circles" - long term, self directed quality
improvement groups
. Revamped Honda internal lot control system (previously hand recorded, now
automated)
. Achieved two major milestones for participation in Kaizan activities
. Honda Safety Committee member for 8 years
. Member of Hyundai Diversity Action Team
. Key participant in Honda's "Green Automobile" environmental target (lead
& chromate free)
Education
. University of Toronto, Toronto Ontario
> Degree: Engineering
. Computer Skills: Microsoft Excel, Word, Project, PowerPoint, Access,
Outlook, Visio, Filemaker, Lotus Notes, Catia, SolidWorks, Honda
Production Control/Ordering System, DMU, MQ1, SAP
. Training: Certified Six Sigma Green Belt, Certified ISO 9000/TS 16949
Auditor, Certified ASQ Auditor, SPC, GD&T, Blueprint Reading, Leadership
Training, PDCA, FMEA, DOE, Project Management, Catia, Plant Safety, KT
decision analysis, LEAN