Post Job Free
Sign in

Engineer Project Manager

Location:
Gaithersburg, MD
Posted:
March 26, 2014

Contact this candidate

Resume:

RYAN BECRAFT, P.E.

Structural Engineer

Home Address: *** ********* *****

Townsend, DE 19734

Phone Number: 410-***-****

E-mail Address: ***********@*****.***

Experience with current firm: 4.5 years Experience with other firms: 1 year (internships)

Mr. Becraft is an Engineer in RK&K's structures department in Dover, DE with 4.5 years of experience in design,

analysis, load rating and inspection of steel girder and prestressed concrete girder bridges, culverts, sign structures

and retaining walls. Having completed the three week Safety Inspection of In-Service Bridges training course in

October 2010, he meets the NBIS qualifications for Team Leader of a bridge inspection team.

Education:

Bachelor of Civil Engineering, Cum Laude, University of Delaware, 2009

I am currently pursuing an M.S. in Civil Engineering at Villanova University.

Courses Taken – CEE 8437: Structural Steel

CEE 7412: Modern Structural Analysis

Registration

Professional Engineer, Delaware – License No. 18621

Certification

Certified Bridge Inspector meeting NBIS requirements of Team Leader

3-week Safety Inspection of In-Service Bridges Training Course (NHI-130055), Harrisburg, PA, October 2010

3-day Bridge Inspection Refresher Course (NHI-130053), Harrisburg, PA, October 2012

OSHA 10+ Hour Safety Training Course – October 2009

Project Experience

Design/Analysis:

SR1/I-95 Interchange, Christiana, DE, DelDOT

Structural Engineer responsible for substructure design, preparing engineering quantity and cost estimates, and

preparing PS&E Construction Plans for Ramp B, a 750’, 4-span, steel, curved girder bridge. Other tasks included

shop drawing review, RFI responses, and the inspection of a steel girder bridge along I-95 to prepare

rehabilitation plans. Submitted PS&E package to DelDOT in March 2011.

US 301, New Castle County, DE, DelDOT

Structural Engineer for the review of section designer’s bridge, culvert, weir structures, and sign structure plans

for conformity to project guidelines for the US 301 bypass as part of the GEC team. Work also includes the

LRFR load rating of 29 proposed structures in accordance with DelDOT policies and the AASHTO Manual for

Bridge Evaluation. Structures consisted of prestressed concrete girder bridges, steel plate girder bridges, a precast

box culvert and a precast rigid frame. Submitted Final Load Rating package to DelDOT in March, 2014.

1

RYAN BECRAFT, P.E.

Structural Engineer

Christiana Promenade Bridge Design, New Castle County, DE, (Private Developer)

Structural Engineer for the design of two, simple span, prestressed concrete girder bridges spanning wetlands

conforming to DelDOT Standards. Work included design of the superstructure and substructure components,

quantity calculations, and plan preparation. Completed final construction plans, specifications, and engineer’s cost

estimate in May, 2014.

Christina River Bridge, Wilmington, DE, DelDOT

Structural Engineer for the foundation type study and preliminary design of a 470’, 3 span, skewed, prestressed,

haunched, concrete girder bridge. The main span of the bridge is 180’ long and utilizes a post tensioned spliced

concrete girder to reduce girder depth to allow for adequate clearance over the navigable channel. The study was

completed in September, 2013.

Delaware River and Bay Authority, Bridge 6 Design, New Castle, DE

Structural Engineer for the superstructure design and detailing of a 7-span steel plate girder overpass structure at

the I-295 approaches to the Delaware Memorial Bridge. The bridge consists of 7 simple spans, on large skews

varying between 30 degrees and 60 degrees. The existing substructure is being reused for this project so careful

consideration had to be given to the girder layout and framing plan. Submitted PS&E package to DRBA in

February, 2014.

Delaware River and Bay Authority, Bridge 6 Study, New Castle, DE

Structural Engineer for the analysis of alternatives for rehabilitation or replacement of an existing 7-span steel

plate girder overpass structure at the I-295 approaches to the Delaware Memorial Bridge. Structural analysis was

performed to determine the adequacy of the existing steel girders as well as the existing foundation. An

investigation into the use of Link Slabs on this bridge was also completed. Cost estimates were generated for each

alternative. A final recommendation was provided to DRBA in October, 2013.

Delaware River and Bay Authority Sign Structure Analysis and Design, New Castle County, DE

Structural Engineer for the fatigue and strength analysis of cantilevered and overhead sign structures located at the

I-295 approaches to the Delaware Memorial Bridge. The structures were analyzed for an increase in sign panel

area to determine which signs will need to be replaced to incorporate the larger sign area. Work also included the

final design and plan preparation of 18 new cantilever and overhead sign structures. Submitted PS&E package to

DRBA in February, 2014.

Maryland SHA Bridge Load Ratings

Structural Engineer for the load rating analysis of 12 steel girder bridges and 3 concrete box culverts throughout

Maryland. LFR load ratings were performed in accordance with MD SHA policies and the AASHTO Manual for

Bridge Evaluation. Submitted Final Load Rating Summary to MD SHA in January, 2013.

Baltimore County, Maryland Load Ratings

Structural Engineer for the load ratings of 33 bridges and culverts. Structure types include metal and concrete

pipe culverts, a concrete rigid frame, filled concrete arches, and prestressed concrete box beams. LFR load ratings

performed in accordance with Baltimore County policies, MD SHA policies and the AASHTO Manual for Bridge

Evaluation. Submitted Final Load Rating Summary and documentation to Baltimore County in August, 2013.

East End Connector, Durham, NC, NCDOT

Structural Engineer responsible for the TS&L investigation, preliminary design and plan preparation for a 542’, 4-

span, steel, curved girder flyover ramp bridge.

2

RYAN BECRAFT, P.E.

Structural Engineer

Northeast Creek, NC (Camp Lejeune), NCDOT

Structural Engineer for the design of multi-column concrete bents for a 16-span, prestressed concrete girder

bridge over Northeast Creek.

US-13/US-158 Design Build (NCDOT), Hertford/Gates County, NC

Structural Engineer for design of multi-column concrete bents for 9-span, prestressed concrete girder bridge over

the Chowan River.

Ballston Pond Retrofit, Arlington, VA

Structural Engineer responsible for the design of a steel pedestrian overlook structure and the development of

final construction plans and specifications. PS&E package submitted in December, 2012.

DelDOT Sign Structure Analysis, New Castle County, DE

Structural Engineer for the structural analysis of cantilevered and overhead sign structures on I-95, I-495, SR 1,

and SR 141 in New Castle County, DE. The structural analysis is required due to proposed changes in the sign

panels. The structures were analyzed for both strength and fatigue resistance. A final report was submitted to

DelDOT in November, 2012.

FDOT District 2 Load Rating, Jacksonville, FL

Structural Engineer for load ratings of two concrete, multi-cell box culverts. Performed LRFR load ratings in

accordance with the FDOT Load Rating Manual and the AASHTO Manual for Bridge Evaluation. Submitted

Final Load Rating Summary and documentation to FDOT in June, 2012.

Wekiva Parkway Design/Build, FDOT

Structural Engineer for the development Preliminary Plans and Quantities for 2 prestressed concrete overpass

bridges and 2 prestressed concrete wetland crossing bridges, for use in preparing a Design-Build proposal.

Performed preliminary design for superstructure and substructure elements. Developed 30% Plans and quantities

in August, 2012.

Inspection:

Maryland State Highway Administration Bridge Inspections, Baltimore County, MD

Team member for the hands-on inspection of steel girder bridges, concrete girder bridges and concrete box

culverts throughout the Baltimore region in compliance with NBI standards.

Turnkey Asset Maintenance Services (TAMS) on Woodrow Wilson Bridge, VA/MD/DC

Team member for the hands-on inspection of concrete slab, prestressed concrete girders, steel girder bridges and

overhead sign structures along the Capital Beltway near the Woodrow Wilson Bridge in compliance with NBI

standards.

Maryland Transportation Authority (MDTA) Condition Inspections, Baltimore, MD

Team member for inspection of highway bridges, pedestrian bridges, retaining walls and sign structures along I-

95, I-295, I-395 and the Intercounty Connector (ICC). Tasks included performing hands-on inspections and

preparing field inspection notes for steel girder bridges, concrete girder bridges, MSE retaining walls, overhead

signs and cantilevered signs in compliance with NBI and MDTA standards.

Light Rail Bridge Inspections, Baltimore, MD, MTA

Team member for the hands-on inspection of concrete box girders, concrete substructure and superstructure in

3

RYAN BECRAFT, P.E.

Structural Engineer

compliance with NBI standards.

Sign Structure Inspections, Baltimore, MD, MDTA

Team member for the hands-on inspection of overhead cantilevered and non-cantilevered sign structures for

structural deficiencies along I-95, I-395, and I-295.

Signal Pole Inspections, MDTA

Team member for the hands-on inspection of cantilevered signal poles for structural deficiencies along MD Route

2.

Baltimore METRO Subway Station Inspections, Baltimore, MD, MTA

Team member for the hands-on inspection of subway platforms along the Baltimore METRO Subway line.

MD I-95/I-695 Interchange, Baltimore, MD, MDTA

Construction Inspector (intern) – Responsibilities included construction inspection of deep pile foundations,

concrete bridge substructure, steel girder erection, and erosion and sediment controls.

Employment History

Rummel Klepper and Kahl (RK&K) – Dover, DE

July 2009-Present

Structural Engineer

Whitman, Requardt and Associates (WR&A) – Baltimore, MD

Summer 2008

Intern, Highway Engineering

Urban Engineers – Baltimore, MD

Summer 2007, Winter 2007/2008

Intern, Construction Inspector on I-95/I-695 Interchange Construction Project

Software

Staad.Pro

Microsoft Office (Excel, Word, etc.)

Microstation

MDX

BRASS

Leap RC-Pier

Leap Conspan

LARS

SABRE

MIDAS Civil

4

RYAN BECRAFT, P.E.

Structural Engineer

References

Bill Detwiler, P.E.

Senior Project Manager, TY Lin International

*******.********@*****.***

302-***-****

Douglas Finney, P.E.

Senior Project Manager, TY Lin International

*******.******@*****.***

302-***-****

Stuart Montgomery, P.E.

Director, Structures, RK&K

**********@***.***

410-***-****

Raymond Harbeson, Jr., P.E.

Principal, H4 Design LLC

(former DelDOT Chief Engineer)

***********@*****.***

302-***-****

5



Contact this candidate