Post Job Free
Sign in

Project Manager Manufacturing

Location:
Danvers, MA
Salary:
130,000
Posted:
May 18, 2014

Contact this candidate

Resume:

Dennis M.

Rubino

* **** *****

Cell: (***) *01 - 7764

Danvers, MA 01923

Email: *****@***.***

Operational Excellence Manager / Master Black Belt

Results-focused Master Black Belt with a proven track record of delivering

impressive process improvements and cost reductions across a wide range of

industries. Problem solver and change agent able to optimize operational

efficiencies streamline engineering processes and deliver results. Proven

ability to lead kaizen events and provide training of cross functional

teams through the implementation of lean projects. A project manager with

superior strategic and tactical skills to successfully control and sustain

cost reduction efforts. Demonstrated leadership with the ability to

influence, motivate and enable others to contribute to a common purpose and

success of an organization.

Professional Experience

Company: Kiva Systems / Amazon: (May 2012 - Present)

Products: Robotics

Title: Manager Manufacturing Engineering / Lean Champion

. Developed manufacturing capacity model simulating multiple scenarios

to identify the most effective deployment of resources through a

projected ramp of 10X in production quantified people, space and

equipment to meet projected demand.

. Master Plan Development: Established lean manufacturing strategy;

developing framework and organizational structure to drive, sustain

and measure continuous improvement efforts for assembly and test.

. Developed space program used in the future design of the existing

facility as well Greenfield design options; Incorporated lean

principles and techniques such continuous flow manufacturing, kanban,

supermarket and various demand pull systems to optimize the safe and

efficient flow of product through the facility

. Managed 5S program; inclusive of training, implementation of "the

visual factor", metric development, audits and sustainment of 5S

efforts.

. Provided lean training for the entire operations team (120 people),

utilized VSM as the key tool to identify waste, the 5-Why's to drive

root cause problem solving and kaizen to develop a culture of

teamwork, empowerment and success.

. Worked closely with NPI / Design engineering team to ensure DFA

principles were incorporated into the design of new products ensuring

the cost effective transition of processes enabling manufacturing to

be "Production Ready".

. Ensured organizations development and continuous improvement of

technical and management skills to direct reports, addressing

individual development needs through training, continued education

mentoring and coaching.

. Directed the MFE / Lean Organization through a significant ramp

continued to drive KPI's to reduce cost by 20% lead time by 50%, FPY

from 70-90 % and OTD from 85% -95%.

. Provided support to other organizations outside of manufacturing in

defining and refining transactional processes through map and gap

analysis resulting in significant improvement to MRB, ECO, and SCAR

processes.

Company: Brooks Automation: (Oct 2008 - Sept 2011)

Product: Robotics / Cryogenic Pumps

Title: Director Lean Enterprise and Continuous Improvement

. Establish lean strategies, direct lean leaders and manage all lean

initiatives to ensure alignment with business goals and objectives.

. Developed 22 training modules for lean manufacturing, office and

supply chain training sessions.

. Trained and educated over 100 personnel both direct and

professional staff in the techniques and principles of lean

manufacturing.

. Lead lean assessment teams Robotics division benchmarking the

operation against best in class. The assessment comprised of over

220 questions relative to lean operations within the high tech and

electronics industry. Identified strengths, weaknesses and

opportunities across; Management Systems, Quality Systems, Quality

Culture and Operating Systems.

. Developed operational "Blue Print" to close critical gaps that

would improve key performance indices in driving financial gains.

. Facilitated Kaizen Teams in the implementation of key projects

identified in the VSM effort; established pull systems, mixed model

assembly lines, POU storage and visual factory concepts to optimize

operating efficiencies. Achieved hard savings in excess of $1M.

. Established both supplier and withdrawal kanban system for over

9,000 parts significantly reducing inventory and increasing turns

improving cash flow.

. Managed cross functional teams in the development of a Master Plan

to consolidate from 3-4 buildings resulting in a projected savings

of $750 K savings per year in operating expenses.

. Established cross functional teams across two key product lines.

Trained and educated the teams in Lean techniques and principles

relative to their process. Performed value stream mapping,

identified opportunities, developed fishbone and C&E matrix to

drive root cause analysis and resolution. Projects resulted in a

potential savings of over $500k per year.

. Performed lean warehouse assessment and training of warehouse

personnel. Led Kaizen event w/cross functional team resulting in

significant improvement to OTD and a cost savings of $300K.

. Selected By SLT to lead mapping effort of all business processes;

identified gaps, prioritized actions and developed "Road Map" for

resolution during implementation / transition of new ERP system

(Oracle)

Company: Covidien: (Aug 2007 - Aug 2008)

Products: Med Device/ Healthcare

Title: QIP/ Operational Excellence Manager

. As part of a highly skilled corporate team performed comprehensive

lean assessments that are strategically tied to KPI's for over 55

medical devices, pharmaceutical and imaging solution business units.

To include both manufacturing and logistics operations.

. Managed project teams within a FDA and GMP regulatory environment

that worked with operational excellence personnel in the development

of operational blue prints to improve critical manufacturing and

logistic processes.

. Provided expertise to manufacturing and distribution sites in the

implementation of lean manufacturing, world class quality and best in

class methodologies to drive continuous improvement efforts.

. Project Principal between corporate and business unit managers

providing time management, cost management, risk management and

communications management to ensure projects were completed on time

and within budget.

Company: Boston Industrial Consulting: (1998 - 2007)

Product: Consulting Services

Title: Senior Consultant

Senior Consultant responsible for the management and implementation of

all manufacturing projects awarded in house. Managed 3 junior

consultants and supplemental contractors to ensure timelines and

deliverables were achieved to the satisfaction of our clients. Clients

included: Nova Biomedical, Boston Scientific, Millipore, GE,

Viasys Healthcare, Haemonetics and General Dynamics.

Services Included: Lean Assessments, Lean Training, Lean Implementation

/ Kaizen, Strategic and Master Planning, Facility Design, Consolidation

and Expansion, Standards Development, TPM/OEE programs, and Capacity

modeling

The Lean Manufacturing Group has achieved in excess of $10M in

documented savings over a period of nine (9) years for more than one

hundred 100 companies across a wide range of industries.

Boston Industrial Consulting / Projects

Client: Moore North America / Platens

Problem: Equipment manufacturer was given the task by a key customer (HP)

to reduce the total cost of platens by 12% in order to maintain the

contract / business.

Solution: Establish cross functional team, perform value stream mapping to

identify waste and bottlenecks in the process. Reduce lot size, implement

work cells and balance cell to tact time.

Key Tools: DMAIC, C&E metrics, VSM, 5-S, one piece flow, SPC, demand pull

systems, point of use storage

Results: Reduce total costs 14%, reduce floor space 50%, reduce lead times

80%, retained the contract from HP. Projected savings of $1M / year.

Client: Madico / Safety and Specialty Films

Problem: Batch processing of film from the coaters to inspection through

packaging was creating excessive WIP and causing major delays in shipments

to the customer. OTD was at 90%, WIP 5 days and scrap was at 7%.

Solution: Perform VSM, Identify Bottlenecks, Identify waste, Schedule to

Tact Time, Process to Tact Time and implement work cells integrating

inspection slitting and packaging operations.

Key Tools: VOC, VSM, DMAIC, SPC, FIFO Lanes, Continuous Flow Manufacturing,

SOP's, Visual Boards, Kanban

Results: 80% improvement in WIP turns, 58% reduction in cycle times, 26%

improvement in direct labor productivity, 80% reduction in lead times.

$1.2M in total savings

Client: G.E. / Transducers and Flow Meters

Problem: Relocate manufacturer of flow meters and transducers (G.E.) from a

350,000 sf facility into a 200,000 s.f. facility while maintaining

operational excellence.

Solution: Effective initiation of kaizen programs to significantly reduce

Raw Materials, WIP & F.G. inventory to reduce facility footprint.

Key Tools: Kaizen teams, Systematic Layout Planning (SLP), work cells,

focused factories, point of use storage, kanban, supermarkets, and vendor

performance criteria.

Results: Design of 200,000 s.f. lean facility which will enable G.E. to

meet customer demand for the next 5 years and beyond. Cost savings in new

facility fit up of $7.5M.

Company: Lytron (1996-1998)

Product: Recirculating Chillers

Position: Industrial Engineering Manager

Directed the efforts of 3 Industrial and Manufacturing

Engineers in support of manufacturing and

logistics operations.

. Managed numerous kaizen events / projects resulting in $1.5M in

savings. Implemented 5-S

program, work cells, one piece flow, kanban and demand pull systems

for chiller, cold plate and heat

exchanger product lines..

. Developed KPI's to drive cell performance: reports including but not

limited to: Labor Variance, Rework, FPY,

O.E.E and Schedule Attainment, OTD and QPPM..

. Developed TPM and OEE program resulting in 25% increase in

throughput, 20% reduction in scrap and rework

and 25% reduction in lead times.

. Project Lead for an aggressive inventory reduction program resulting

in $1.5M in savings.

. Project lead for the design and fit up of 75k s.f. building expansion

project for the manufacture of new products.

Company: Genlyte / Lightolier (1990 - 1996)

Products: Lighting

Title: Industrial Engineering and Facilities Manager

. Played the role of "Lean Champion "for the implementation and

sustaining of a comprehensive lean program.

Established, trained and educated both management and union

personnel in the tools and principles of lean.

. Established and led cross functional teams in the implementation of

one piece flow manufacturing, focused

factories, set-up reduction projects resulting in $2M in hard

savings.

. Managed a staff of 12 facility technicians and maintenance personnel

in the support of all fabrication, paint and

assembly equipment.

. Developed comprehensive T.P.M program resulting in significant

improvement to O.E.E. resulting in capital

savings of $1.5M, material savings of $500K and improved schedule

attainment by 10%.

. Maintained and modified incentive based labor system for all

manufacturing and assembly operations in a union environment reducing

cost per unit by 10% resulting in $1M in hard savings

Company: Digital Equipment (1980 -1990)

Products: Computers

Title: Project Engineering Manager

. Managed a team of industrial engineers in the strategic and tactical

planning for the design and fit-up of 6

manufacturing and distribution facilities during the extensive

period of growth for Digital Equipment.

. Performed detailed analysis and studies in support of logistics;

established labor standards, defined processes,

measured performance and monitored KPI's in the logistics resulting

in $500K savings per facility.

. Developed the specifications and sourced vendors for the purchase of

all capital equipment for distribution

centers.

. Project manager for the fit-up of each facility, provided time, risk,

resource and change management for each

project resulting in projects being completed on time and within

budget.

. Introduced cellular and continuous flow methodologies for all

packaging operations resulting savings of $2M

Education & Certifications

. ASEE Wentworth Institute of Technology:1975

. BSME Wentworth College:1977

. Logistics Institute @ Georgia Tech - Systematic Layout Planning

Specialist (SLP): 1996

. SME / MEP: Lean Master Black Belt Certification: (2005)



Contact this candidate