Resume:

Farid Homayouni P.Eng,

LEED AP BD+C

** ******* *****

Toronto, ON M2H 1X2

647-***-****

**************@*****.**

OBJECTIVE A position as Mechanical Engineer

HIGHLIGHTS

. Over 15 years' experience in HVAC system design and

inspection for hotel, hospital and healthcare,

residential, commercial, industrial projects and P3

projects

. Extensive experience in HVAC calculations such as heat loss

& gain, hourly and block load analysis

. Demonstrable skills in preparing engineering plans,

drawings, layouts, diagrams and specifications for HVAC

systems and Tenant Services

. Certified by the Heating, Refrigeration and Air

Conditioning Institute of Canada for Residential and

commercial Heat Loss & Heat Gain calculations and Air

System design, HRAI,(2009)

. Experience in designing fire protection system, medical gas

network, ductwork, Pneumatic Tube, plumbing, sewage and

natural gas system

. Lengthy experience in installation of pumps, vessels,

valves, chillers and boilers

. Highly skilled at working with AutoCAD 2013, Revit and

Carrier E-20 load calculation software

. Strong and efficient team player, well-organized, deadline

oriented and quick learner

. Knowledge of Ontario Building Code, NFPA,CSA and ASHRAE

Standards

. Professional Engineer of Ontario

. LEED AP BD+C

EXPERIENCE

2014-NOW Mechanical Engineer

Racon Engineering Ltd

. Set and maintain Project Schedules and Project Contract

Administration, Conduct Site Surveys and oversee

Documentation control

. Responsible for overseeing the successful completion of

Projects

. Prepare drawings for Boiler Plant renewal and Chiller

Replacement

. Assisted Toronto School Board to define mechanical scope

of work in variety of

schools and provided cost estimates.

. Attended project coordination meetings with owner, and

other consultants such as

Structural, Electrical Engineers and Architects.

. Attended the construction meetings to discuss the project

issues during the

construction.

. Reviewed the installation of mechanical systems on site to

ensure conformity with specifications and design drawings,

and issued required instructions.

. Prepared HVAC, plumbing, and fire Protection drawings for

CML Healthcare (Life Lab)- phases I, II, and III Retrofit.

The work was also included: attending weekly site

meetings, inspecting mechanical systems on site, issuing

site visit reports, site instructions, reviewing shop

drawings, progress drawings, Humidification and BAS

Upgrades

2013-2014 Mechanical Engineer

AECOM, Markam,Canada

. Responsible for the design and project management,

overseeing projects through engineers, designers,drafters.

. Prepared Design Base Memorandum (DBM), Schematic Design,

specification, final drawings for variety of commercial

buildings including heritage, educational, and

administrative buildings.

. Checked and verified design drawings to determine

compliance with ordinance standards and applied Building

Codes for HVAC, plumbing, and fire protection

installations.

. Attended project coordination meetings with architect,

owner, and other consultants.

. Attended the construction meetings to discuss the project

issues during the

construction.

. Reviewed the installation of mechanical systems on site to

ensure conformity with

specifications and design drawings, and issued required

instructions.

2007-2013 Mechanical Engineer

Crossey Engineering Ltd., Toronto

. Perform load calculations for a variety of HVAC system

including Pharmaceutical, Residential and Hospital based

on air change rates and special requirements.

. Size HVAC components such as VAV boxes, diffusers and

grilles with special Situations for air delivery such as

fitting for architectural grilles and plenum boxes.

. Produce air schematics for multiple shaft and floor

services with multiple Air Handling Unit arrangements.

. Produce steam schematic for large scale buildings.

. Prepare drawings for Boiler Plant renewal .

. Calculate static pressure for fan coils and pumps.

. Reviewed shop drawings for projects in accordance with

schedules and mechanical specification.

. Reviewed request for information forms and Prepared SI

and CCN

. Perform ductwork, pipe sizing, load and pressurization

calculations.

. Produce layouts for Fire protection systems including

fire hose cabinets,standpipe system, sprinkler heads for

light and ordinary coverage areas.

. Work on a variety of projects including P3 large scale

projects during the bidding process and after being

awarded the contract.

. Maintain file system on P3 project FTP sites uploading

and downloading necessary documents.

. Perform background drawing clean-up as needed.

. Designed Pneumatic Tube system and Medical Gas for a

large scale P3 project including schematic and details.

. Work on Renovation Projects, prepare existing and

demolition drawings, design new duct work, fire

protection and plumbing drawings.

1996-2006 Mechanical Engineer

Bina Engineering Co., Esfahan, Iran

. Designed HVAC system for several hospitals including all

associated ductwork, natural gas, medical gas network,

piping, drainage, water supply system, sprinkler and fire

protection system

. Designed HVAC systems for condominiums, colleges,

restaurants, shopping centers

. Designed HVAC systems for several healthcare building

including indoor swimming pool, sports area, theatre and

library

. Performed engineering load calculations and selected air

handling units, boilers, chillers, pumps, coils,

radiators, fan coils, exhaust fans and cooling towers

. Provided contract documents and carried out construction

administration

. Reviewed mechanical system installation during

construction and provided site inspection reports

EDUCATION

2013 LEED AP preparation course, Ever Blue, Toronto

2013 Professional Engineers of Ontario, Toronto

2012 Course, Environmental Control In Building, EPIC

Educational Program

Centre, Toronto

2010 Course, AutoCAD 2008, Yorkdale Adult Learning Centre, Toronto

Self training, Visio 2007

2009 Certificate, HRAI Residential heat gain and heat loss calculation and

air system design, Humber College, Toronto

Certificate, HRAI Commercial heat gain and heat loss

calculation and air system design, Humber College, Toronto

2000 License, Professional Engineering, Iran

Construction Engineering Organization

Esfahan, Iran

1996 Mechanical Engineering Iran,Esfahan

REFERENCES Available on request

PROJECT LIST:

1. MC Master University

2. Oakville Hospital

3. Humber River Regional Hospital (P3)

4. TDSB Danforth Tech Boiler Plant Renewal

5. Ryerson student Learning Centre

6. University of Toronto (Heart House campus )

7. Teva ( Hood rood plant kitchen upgrade)

8. Centennial College (Ashtonbee Road Campus)

9. Rouge Valley Health System, Toronto (Fit up design)

10. Chinese Embassy (Fire Protection)

11. Rayerson University(Library Building& Jorgenson Hall Booster Pump

Replacement)

12. CML Healthcare, Toronto, ON - Warehouse Sprinkler, HVAC, Humidity and

BAS Upgrades

13. York University, William Small Building - New Electrical Engineering

Labs & Support Space

14. LifeLabs, Thunder Bay, ON - Lab Renovation

15. Lab Building, Toronto, ON - Chiller Replacement

16. TDSB - FDK Addition and Renovation



Contact this candidate