Farid Homayouni P.Eng,
LEED AP BD+C
Toronto, ON M2H 1X2
**************@*****.**
OBJECTIVE A position as Mechanical Engineer
HIGHLIGHTS
. Over 15 years' experience in HVAC system design and
inspection for hotel, hospital and healthcare,
residential, commercial, industrial projects and P3
projects
. Extensive experience in HVAC calculations such as heat loss
& gain, hourly and block load analysis
. Demonstrable skills in preparing engineering plans,
drawings, layouts, diagrams and specifications for HVAC
systems and Tenant Services
. Certified by the Heating, Refrigeration and Air
Conditioning Institute of Canada for Residential and
commercial Heat Loss & Heat Gain calculations and Air
System design, HRAI,(2009)
. Experience in designing fire protection system, medical gas
network, ductwork, Pneumatic Tube, plumbing, sewage and
natural gas system
. Lengthy experience in installation of pumps, vessels,
valves, chillers and boilers
. Highly skilled at working with AutoCAD 2013, Revit and
Carrier E-20 load calculation software
. Strong and efficient team player, well-organized, deadline
oriented and quick learner
. Knowledge of Ontario Building Code, NFPA,CSA and ASHRAE
Standards
. Professional Engineer of Ontario
. LEED AP BD+C
EXPERIENCE
2014-NOW Mechanical Engineer
Racon Engineering Ltd
. Set and maintain Project Schedules and Project Contract
Administration, Conduct Site Surveys and oversee
Documentation control
. Responsible for overseeing the successful completion of
Projects
. Prepare drawings for Boiler Plant renewal and Chiller
Replacement
. Assisted Toronto School Board to define mechanical scope
of work in variety of
schools and provided cost estimates.
. Attended project coordination meetings with owner, and
other consultants such as
Structural, Electrical Engineers and Architects.
. Attended the construction meetings to discuss the project
issues during the
construction.
. Reviewed the installation of mechanical systems on site to
ensure conformity with specifications and design drawings,
and issued required instructions.
. Prepared HVAC, plumbing, and fire Protection drawings for
CML Healthcare (Life Lab)- phases I, II, and III Retrofit.
The work was also included: attending weekly site
meetings, inspecting mechanical systems on site, issuing
site visit reports, site instructions, reviewing shop
drawings, progress drawings, Humidification and BAS
Upgrades
2013-2014 Mechanical Engineer
AECOM, Markam,Canada
. Responsible for the design and project management,
overseeing projects through engineers, designers,drafters.
. Prepared Design Base Memorandum (DBM), Schematic Design,
specification, final drawings for variety of commercial
buildings including heritage, educational, and
administrative buildings.
. Checked and verified design drawings to determine
compliance with ordinance standards and applied Building
Codes for HVAC, plumbing, and fire protection
installations.
. Attended project coordination meetings with architect,
owner, and other consultants.
. Attended the construction meetings to discuss the project
issues during the
construction.
. Reviewed the installation of mechanical systems on site to
ensure conformity with
specifications and design drawings, and issued required
instructions.
2007-2013 Mechanical Engineer
Crossey Engineering Ltd., Toronto
. Perform load calculations for a variety of HVAC system
including Pharmaceutical, Residential and Hospital based
on air change rates and special requirements.
. Size HVAC components such as VAV boxes, diffusers and
grilles with special Situations for air delivery such as
fitting for architectural grilles and plenum boxes.
. Produce air schematics for multiple shaft and floor
services with multiple Air Handling Unit arrangements.
. Produce steam schematic for large scale buildings.
. Prepare drawings for Boiler Plant renewal .
. Calculate static pressure for fan coils and pumps.
. Reviewed shop drawings for projects in accordance with
schedules and mechanical specification.
. Reviewed request for information forms and Prepared SI
and CCN
. Perform ductwork, pipe sizing, load and pressurization
calculations.
. Produce layouts for Fire protection systems including
fire hose cabinets,standpipe system, sprinkler heads for
light and ordinary coverage areas.
. Work on a variety of projects including P3 large scale
projects during the bidding process and after being
awarded the contract.
. Maintain file system on P3 project FTP sites uploading
and downloading necessary documents.
. Perform background drawing clean-up as needed.
. Designed Pneumatic Tube system and Medical Gas for a
large scale P3 project including schematic and details.
. Work on Renovation Projects, prepare existing and
demolition drawings, design new duct work, fire
protection and plumbing drawings.
1996-2006 Mechanical Engineer
Bina Engineering Co., Esfahan, Iran
. Designed HVAC system for several hospitals including all
associated ductwork, natural gas, medical gas network,
piping, drainage, water supply system, sprinkler and fire
protection system
. Designed HVAC systems for condominiums, colleges,
restaurants, shopping centers
. Designed HVAC systems for several healthcare building
including indoor swimming pool, sports area, theatre and
library
. Performed engineering load calculations and selected air
handling units, boilers, chillers, pumps, coils,
radiators, fan coils, exhaust fans and cooling towers
. Provided contract documents and carried out construction
administration
. Reviewed mechanical system installation during
construction and provided site inspection reports
EDUCATION
2013 LEED AP preparation course, Ever Blue, Toronto
2013 Professional Engineers of Ontario, Toronto
2012 Course, Environmental Control In Building, EPIC
Educational Program
Centre, Toronto
2010 Course, AutoCAD 2008, Yorkdale Adult Learning Centre, Toronto
Self training, Visio 2007
2009 Certificate, HRAI Residential heat gain and heat loss calculation and
air system design, Humber College, Toronto
Certificate, HRAI Commercial heat gain and heat loss
calculation and air system design, Humber College, Toronto
2000 License, Professional Engineering, Iran
Construction Engineering Organization
Esfahan, Iran
1996 Mechanical Engineering Iran,Esfahan
REFERENCES Available on request
PROJECT LIST:
1. MC Master University
2. Oakville Hospital
3. Humber River Regional Hospital (P3)
4. TDSB Danforth Tech Boiler Plant Renewal
5. Ryerson student Learning Centre
6. University of Toronto (Heart House campus )
7. Teva ( Hood rood plant kitchen upgrade)
8. Centennial College (Ashtonbee Road Campus)
9. Rouge Valley Health System, Toronto (Fit up design)
10. Chinese Embassy (Fire Protection)
11. Rayerson University(Library Building& Jorgenson Hall Booster Pump
Replacement)
12. CML Healthcare, Toronto, ON - Warehouse Sprinkler, HVAC, Humidity and
BAS Upgrades
13. York University, William Small Building - New Electrical Engineering
Labs & Support Space
14. LifeLabs, Thunder Bay, ON - Lab Renovation
15. Lab Building, Toronto, ON - Chiller Replacement
16. TDSB - FDK Addition and Renovation