***** ******* ******** 919-***-****
Grove Church E-mail acd3vl@r.postjobfree.com
Road
Raleigh, NC
27613
Terry L. Benton
Summary of 1984 - 2014
qualificatio Various CADD positions supporting Environmental, Waste Water,
ns Telecommunications, Civil and Land Development Projects
Professiona Aug. 2012 - Present: Civil Department of The Wooten Company -
l Designer II
experience Design and produce Preliminary and Final Plan sets for Land
Development Projects.
Responsible for gathering data from various divisions, Designing
and producing Preliminary Site Plans based on state and federal
Governmental regulations, Design concepts, CADD tools, Plan
preparation, Site specific requirements, Survey and Construction
principles and techniques.
Coordinate with Client about Designs; Design questions, Client
directives and adjusts/redlines Plans, and revises Plans
accordingly.
Develop Erosion Control Plans which may include Sediment Pond
Design, including temporary and permanent Erosion Control
measures.
Proficient in ACAD Civil 3D 2012, Microstation V8i, Microstation
PowerDraft, Adobe, Microsoft Office Suite.
Oct. 2011 - Aug. 2012: Survey Department of SEPI Engineering -
CADD Technician (Part-Time Position)
Design and produce Plan sets for Survey Department.
Proficient in ACAD Civil 3D 2011, Microstation V8i, Microsoft
Office Suite.
Dec. 2008 - Oct. 2011: Covenant Planning Group - Project
Coordinator
Responsible for Day to Day operations in North Carolina.
Scheduling Sales Meetings and Seminar venues.
Responsible for Sales and Meetings involving annuities for
clients.
Oct. 2005 - Dec. 2008: Land Development / Civil Department of
Greenhorne & O'Mara Inc. - Senior CADD Technician
Design and produce Preliminary and Final Plan sets for Land
Development Projects.
Responsible for gathering data from various divisions, Designing
and producing Preliminary Site Plans based on state and federal
Governmental regulations, Design concepts, CADD tools, Plan
preparation, Site specific requirements, Survey and Construction
principles and techniques.
Attend Project and pre-Construction meetings. Ensure that all
policies, standards, techniques and specifications are adhered to.
Maintain Project libraries and CADD libraries based on latest
regulations and specifications.
Maintain all AutoCAD software for division. Assist other
technicians in software related issues and problems. Ensure that
all software is current per the department and/or Client
guidelines.
Coordinate with Client about Designs; Design questions, Client
directives and adjusts/redlines Plans, and revises Plans
accordingly.
Develop Erosion Control Plans which may include Sediment Pond
Design, including temporary and permanent Erosion Control
measures.
Proficient in ACAD Civil 3D 2008, Microstation V8, Volo View,
Scanworks with large format OCE Scanners, Convert PDF files to
drawings, Photoshop, Adobe, Microsoft Office Suite.
May 2002 - Oct. 2005: Water and Waste Management, Land
Development and Environmental Divisions of Arcadis G&M Inc. -
Senior CADD Technician
Responsible for Preliminary and Final Design Plan sets for D.E.
Benton Waste Water Treatment Plant for City of Raleigh.
Design and produce Preliminary and Final Plan sets for Land
Development and Environmental Projects.
Responsible for gathering data from various divisions, Designing
and producing Preliminary Site Plans based on state and federal
Governmental regulations, Design concepts, CADD tools, Plan
preparation, Site specific requirements, Survey and Construction
principles and techniques.
Attend all Project and pre-Construction meetings. Ensure that all
policies, standards, techniques and specifications are adhered to.
Maintain Project libraries and CADD libraries based on latest
regulations and specifications.
Maintain all AutoCAD software for division. Assist other
technicians in software related issues and problems. Ensure that
all software is current per the department and/or Client
guidelines.
Assist in Boundary Surveys, Right of Way Dedication, Sub-division
Surveys, and Mapping, Survey Point downloads.
Identify and secure necessary permits, variances and approvals
from Federal, State, County and City agencies for Construction
Projects. Coordinating the production and Development of all
drawings, reports, calculations applications, permits, letters and
transmittals.
Produce Civil engineering documents, including but not limited to,
Site Design, Storm and Utility Design, Erosion Control Design, and
Plan and Profile layouts in accordance with Local Governmental
regulations.
Coordinate with Client about Designs; Design questions, Client
directives and adjusts/redlines Plans, and revises Plans
accordingly.
Design Storm Drainage systems including: Storm Sewer piping, open
channel Design, orifice and wire Design, culvert Design, inlet
flow calculations and basic Hydrologic calculations.
Develop Erosion Control Plans which may include Sediment Pond
Design, including temporary and permanent Erosion Control
measures.
Perform Grading Design for small and large Sites, Earthwork
balance calculations and adjustments.
Proficient in ACAD 2004 Architectural Desktop, Raster Design,
Civil Design, Land Desktop, Volo View, Autodesk Buzzsaw, Mapdraw,
Copyworks, Scanworks with large format OCE Scanners, Convert PDF
files to drawings, Photoshop, Adobe, Microsoft Office Suite.
IT liaison and support for division, supporting various IT
functions, including server backup, various software installation
and support, printing, scanning and network issues.
July 1998 - May 2002 Telecommunications Division of Arcadis G&M Inc
National TELspro CADD Coordinator CADD Technician
Arcadis TELspro coordinator for all United States Telcom offices.
Responsibilities included:
Document, distribute, and implement the production processes and
standards adopted by the TELspro Team and CAD Coordinators via the
company Intranet, email, and other appropriate methods.
Maintain and update the TELspro CAD specific standards and
processes.
Conduct monthly conference calls with TELspro CAD Coordinators in
other telecom offices to stay abreast of CAD issues and related
areas affecting the telecom practice
Produce and distribute minutes of conference calls and meetings.
Ensure TELspro standards are maintained within each office by
conducting periodic reviews of electronic files from each telecom
office.
Assist with ARCADIS' international telecom initiative.
Organize and conduct semi-annual meetings TELspro CAD Coordinators.
Review CAD aspects of proposed scopes of services and contracts.
Review and coordinate CAD related pricing for various Clients.
Assist in the preparation of the CAD related portion of proposals
for specific new Project opportunities.
Assist CAD Coordinators in acquisition firms with transition to
ARCADIS G&M CAD specific processes for telecommunications.
Additional 1998 Aiken & Yelle Assoc., Inc. Raleigh, North
professiona Carolina-Engineering Technician
l 1997-1998 Rindt-McDuff Assoc., Inc. Marietta, Georgia-Senior
activities Engineering Technician
1996-1997 The Peachtree Group, Inc. Atlanta,
Georgia-Project/Construction Manager
1992-1997 Precision Planning, Inc. Lawrenceville, Georgia-
Engineering Technician
1990-1992 Atlanta Engineering Services, Inc. Atlanta,
Georgia-Project Coordinator
1989-1990 Metro Engineering & Surveying, Inc. Atlanta,
Georgia-Engineering Technician
1987-1989 Alpha Engineering & Surveying, Inc. Lakeland,
Florida-Engineering Technician
1984-1987-Gurr & Associates, Inc. Lakeland, Florida-Senior
Technician
1980-1984 Brewster Phosphates, Inc. (American Cyanamid) Bradley,
Florida-Surveyor's Assistant
Various residential and commercial Projects for companies listed
above. Responsibilities included:
Prepared Construction bid documents, including contract drawings,
specifications, estimated costs, and other bid documents in support
of Project execution.
Identified and secured all necessary permits, variances and
approvals from Federal, State, County and City agencies for various
Commercial and Residential Construction Projects.
Developed, produced and distributed all drawings reports,
calculations applications, permits, letters and transmittals.
Established standards for Cad drafting.
Provided technical support for Design contracts and participated in
Design reviews.
Additional responsibilities specific to Gurr & Associates Inc:
Drafted and managed groundwater/hydrology programs.
Managed the installation of monitor wells to comply with Florida
statute 17-61.
Monitored wells monthly including sampling of groundwater, following
a D.E.R. approved QA/QC Plan.
Installed soil gas probes at contaminated Sites.