Post Job Free
Sign in

Construction Manager

Location:
Glendale, AZ
Salary:
80,000
Posted:
February 19, 2014

Contact this candidate

Resume:

DANNY J. KNOELL

**** *. **** ***. / *******, Az *5016/Mobile: 602-***-****

Email: ***********@*******.***

OBJECTIVE

I desire a full-time position as a Construction Manager (Project Engineer-Assistant Project Manager-BIM Coordinator) in the

Construction Industry

EDUCATION & CERTIFICATIONS

Arizona State University – Tempe, AZ; Del E. Webb School of Construction (Attended: Spring 2007 – Spring 2009)

• Master of Science - Construction Management.

• Graduated: May 2009.

Franciscan University of Steubenville – Steubenville, OH; College of Business (Attended: Fall 2002 – Spring 2006)

• Bachelor of Science in Business Administration with a concentration in management.

• Graduated: May 2006.

USGBC – U.S. Green Building Council (August, 2008)

• LEED AP V2.2 (Accredited Professional)

OSHA – Occupational Safety & Health Administration (May, 2011)

• OSHA 30 Hour - Construction

EXPERIENCE

Full Time Work

BIM/Virtual Construction Manager – Commercial/Industrial and High Tech Industries July ’12 – Feb. ‘14

Delta Diversified Enterprises, Inc. Tempe, AZ

• Responsible for all aspects on projects with 3D Modeling/BIM Scope of Work

• Programs used on a daily basis: AutoCAD MEP 2012/13 and NavisWorks 2013

• Clients/CMs

Intel Corp, Hoffman Contracting, Turner Construction, McCarthy, Okland Construction & Hensel Phelps

• Key Responsibilities include:

Managed projects worth $60 Million

Responsible for Managing & Operating an Efficient and Effective BIM Department for maximizing profitability

Managed and responsible for a dozen industry professionals (Designers and Detailers)

Designed and Coordinated multiple projects at a single time

Design experience – AutoCAD MEP 2012/2013

Designed for Intel’s newest Fab 42 Base-Build, Intel Fab 12/22/32 Tool Install, Electrical Rooms, Electrical routing for

Semiconductor Fabrications, Commercial, Industrial and laboratory projects

Reported directly to the Vice President of Construction on a monthly basis and give progress updates

Carried out formal Employee Performance Reviews

Project Expeditor – Commercial/Industrial & Natural Gas Industry Jan. ’11 – July ‘12

Clear Creek Construction, LLC Oklahoma City, OK

• Responsible for all projects to be logistically executed – from sales/design, through construction, and to project

completion

• Key responsibilities and Value Added include (but not limited to):

Scheduling: Successful in instigating MS Project, and transitioning into Primavera P6 to maximize efficiency

and effectiveness for on-time commencement and completions of all projects

Managed the scheduling department by overseeing, creating, and managing all company project schedules

Update/Publish schedules weekly and attend weekly Client/Subcontractor meetings

Attend quarterly (out-of-state & in-state) client meetings

Liaison: Enhanced company representation, rapport and coordination between clients, engineers, construction

manager, superintendents, vendors, and sub-contractors for any/all information pertaining to projects by being

the middle-man for all communications

Overseeing all projects’ information exchange and transmitting any/all necessary data to appropriate parties that the

project allies to

Document Control: Assist in contract and scope write-ups

Documents including: Change Orders, Submittals, Redlines, and RFIs

Procurement/Logistics: Successful implementation of reducing waste by increasing procurement accuracy

Crane & Building redlines/approvals: Check crane & building prints for correct specs/dimensions

Assist in Building Designs: Retrofitted and/or custom buildings to suit client requirements

Project Engineer /Scheduler – Intel Fab 22 CUB Telecom Expansion Nov. ‘09 – May ‘10

Black Box Networking Services Chandler, AZ

• Project Scheduler: scheduling project’s activities and updating schedule

• Project Engineer: coordinator for meetings, site walks, and RFIs between electrical contractor and general contractor

Represented Black Box in GC and Intel IT Work Group meetings

• QA/QC and Commissioning Manager

• 3-D Modeler: AutoCAD MEP 2010 – conduit installation

Electrician – Commercial Jun. ‘09 – Nov. ‘09

JMJ Construction, Inc. Scottsdale, AZ

• Both rough and trim stages for Banana Republic and Forever 21(retail stores) projects

• Pipe fitting/bending and wiring

DANNY J. KNOELL

1817 E. Luke Ave. / Phoenix, Az 85016/Mobile: 602-***-****

Email: ***********@*******.***

Internships (During Undergraduate/Graduate Studies)

Junior Scheduler – Intel Clean Room Fab 22 and Fab 32 Conversion Jan. ‘09 – April ‘09

Hoffman Corporation Chandler, AZ

• Supported Chief Scheduler – Primavera P6

Entered/tied logic for Process Laterals and PSSS (Spec. Gas/Chemical/Planar) into Excel and Primavera P6

Updated weekly subcontractor schedules

Project Engineer – Commercial Shell and TI May ‘07 – Aug. ‘08

Wespac Construction, Inc. Phoenix, AZ

• Toll Brothers – Luxury Condominium (May 07 – April 08)

Posting RFIs and As-Builts; Submittals; Meeting Minutes; filing, and documenting

Worked with Shell and TI Drawings: ASI’s; Architectural Sketches; and Interior Sketches

Quality Control: checking all unit finishes for correct specifications

Close-Out Documents: Maintenance and Operation Manuals for Owner, Architect and tenants

• Starwood Hotels - Phoenician Ballroom Addition (April 08 – July 08)

Assisted in the buy-out process in preconstruction phase

Plan distributing to relevant subcontractors

Implemented take-offs for alternative design/solutions

• TI Estimating – Plan Distribution (July 08 – Aug 08)

Distribution (by phone and in person) of plans to selected subcontractors for bid

Summer Internship – Project Engineer/Assistant Project Manager Jun. ‘05 –Aug. ‘05

D J Murphy & Company, LLC Phoenix, AZ

• Pay-Applications, Billings, and worked directly with the Construction Bank Inspector (check requests)

• Office Management: change-orders, contracts, shop plans, and all subcontract files

• Reviewing Residential and Tenant Improvement architectural drawings and producing preliminary and final

construction cost estimates

Pre-Collegiate (Pre/Post High School)

Supervisor/Foreman – House Remodeling Summers ‘03, ‘04, and ‘06

Knoell Properties, LLC Phoenix, AZ

• Project supervisor for house remodels

• Supervisor and Foreman for all facets of work: demo, electrical, sheet-rock, tile, carpentry, painting, etc.

Electrician – Commercial Jun. ‘01 – April ‘02

JMJ Construction, Inc. Scottsdale, AZ

• Involved in a half dozen retail outlet stores at Chandler Fashion Center, and Scottsdale Fashion Square

All facets from Rough to Trim - Pipe fitting/bending and wiring per electrical drawings and Specs

DEVELOPMENT & ACTIVITIES

• Master of Science Project Thesis

productivity analysis between different types of contractual structures (December 2007 – May 2009)

• Awarded the Del E. Webb Foundation Graduate Student Fellowship Award (2008/2009 academic year)

• Students in Free Enterprise (SIFE)

Leader of a student financial and time management consulting service (Fall 04 – Spring 05)

• Franciscan University Rugby

Player (fall 02 – Fall 05) – Allegany Rugby Union All-Star Team (spring 03, and 04)

OTHER/SOFTWARE

• General Software Proficiency

Proficient: Microsoft Office – Word, Excel, PowerPoint

• Scheduling Software

Proficient: Primavera P6 and MS Project 2010

• Project Management Software

Rudimentary: Timberline & Prolog (Project Management Software)

• BIM/3D Modeling Software

Proficient: AutoCAD MEP 2012/2013 & NavisWorks Manage 2013

• References available upon request



Contact this candidate