Post Job Free
Sign in

Engineer Manufacturing

Location:
Tulsa, OK
Posted:
February 07, 2014

Contact this candidate

Resume:

Mohan Nidadavolu

**** *. ******** **., *** #****

972-***-****

Tulsa, OK-74133, USA

********@*****.***

SKILLS SUMMARY

. 6+ years experience as a Manufacturing Engineer leading continuous

improvement projects

. Proficient in Statistical Process Control (SPC) tools, Simulation of

discrete-event systems, SMED

. Well versed with Six sigma, Project Management, Process Improvement,

JIT and lean manufacturing

. Understanding of Planning and Scheduling techniques, DFM, RFID systems

and Supply chain management

. Proven ability to lead cross functional teams and implement capital

projects

. Proven leadership experience of driving change in process performance

metrics

. Lead training for several groups while implementing kaizen events

. Hands on experience in leading process improvements for assembly,

machine and weld shops

WORK EXPERIENCE

Enovation Controls / FW Murphy

Manufacturing Engineer II, Tulsa, Oklahoma

February 2012- Present

. Lead Quality Scan implementation in LIM, Gauge and Electronics

departments

. Implement safety solutions for near misses and support corporate

quality program

. Lead new product development and continuous improvement efforts for

LIM and gauge departments

. Drive error free processing in manufacturing through mistake proofing

and best practices

. Provide manufacturing support for LIM and gauge departments

. Conduct Failure mode effect analysis as part of Customer Corrective

action requests

. Utilize Six sigma tools to solve production issues and document them

. Investigate and disposition Non conformance reports and Warranty

returns

. Eliminated inventory inaccuracies for MLS product line through

standard rework process

. Reduced scrap cost by 20% for level product families by implementing

Loctite patch

Cameron Surface Systems

June 2009 - December 2011

Manufacturing Engineer II, Oklahoma City, Oklahoma

. Deployed Cameron best practices by implementing continuous improvement

projects in weld shop

. Lead '6s Initiative' for entire facility to improve work place

organization and safety

. Improved throughput and streamlined workflow by restructuring and

relocating of valve assembly area

. Reduced downtime at bottleneck workstation by 50% in valve assembly by

implementing molded O-rings instead of manually making non standard O-

rings

. Revamped and strengthened certification program for assemblers and

testers in the shop to reduce safety incidents

. Eliminated safety incidents by implementing electric pallet truck

instead of transporting valves using manual pallet jack

. Investigate and disposition Non conformance reports

. Prepare add on work orders and purchase requisitions

. Provide manufacturing support to assembly and weld shop areas

. Developed and deployed metallurgy training for shop and office

personnel

. Lead training in GD&T for assembly and machine shop

. Promote GRD Program at University career fairs and present at

Information sessions

. Interview candidates for Global Rotational Development Program

Cameron Compression Systems

June 2008 - June 2009

Industrial Engineer, Ponca City, Oklahoma

. Lead '5s Initiative' for entire facility to improve work place

organization and safety

. Developed 'NCR analysis report' to collect data for reducing

manufacturing scrap

. Implemented standard operating procedures to improve consistency in

work and communication

. Streamlined work flow in the plant through capacity planning and

scheduling

. Implemented supplier managed inventory for grinding department

supplies

. Implemented routing sign off system for work-in-process tracking

Cameron Surface Systems

Dec 2007 - June 2008

Shop supervisor, Oklahoma City, Oklahoma

. Streamlined the workflow by scheduling Deburr and sandblast areas as

supervisor

. Eliminated 40% rework by implementing SOPs at Deburr area

. Implemented cross training program for operators across different

shifts for optimal performance

. Implemented TPM program at deburr area to reduce downtime of wash tank

Cameron Surface Systems

June 2007 - Dec 2007

Manufacturing engineer, Oklahoma City, Oklahoma

. Implemented '5S' for 14 m/c's as part of 5S project for entire

facility

. Improved the learning curve of the new operators by developing SOPs at

milling machine (AWEA m/c)

. Analyzed several processes in machine shop and provided data as part

of kaizen events in the facility

Shaw Tulsa Fabricators, Inc.

October 2006 - February 2007

Industrial Engineer, Tulsa, Oklahoma

. Analyzed production process and developed daily productivity and

backlog reports

. Streamlined the scheduling process which improved the productivity of

the plant by 10%

. Replenished the plant backlog daily according to work-in process

inventory

. Optimized the work flow in the plant by maintaining constant work-in

process inventory

EDUCATION

Master of Science in Industrial Engineering & Management

July 2006

Oklahoma State University, Stillwater, Oklahoma

GPA: 3.45

Bachelor of Technology in Mechanical Engineering

June 2003

Jawaharlal Nehru Technological University, Hyderabad, India

GPA: 3.6

Courses: Planning and scheduling techniques, Supply chain management, 5S,

Kaizen, Green Belt Training (I, II & III), Leadership training, HR

Training, Internal quality auditing, Safety Auditing

Software Applications: MSOffice, MS Access, Minitab, AutoCAD, Inventor,

ARENA, MS Project, SAP R/3, Enterprise one



Contact this candidate