CURTIS LANCASTER
Las Vegas, NV 89141 accjz7@r.postjobfree.com
Recruiting Department
Ausland Group
Ashland, OR 97520
To whom it may concern,
Please consider the attached resume for the position of Operations Manager. I have spent
the last 10 years managing the design & construction of challenging projects on the strip
in Las Vegas. Most of my projects over the last 8 years have been with MGM Resorts
International. Over this time they have requested me to continue to manage specific
complex projects, including overseeing multiple project managers and working as a
consultant for them on the City Center Project. I would like to use this letter to describe
the management philosophies that I believe have led to my success and can be applied to
my future positions to bring the same success.
I believe in dealing with all members of a project team in a courteous and respectful
manner. I’ve never seen an example of a condescending or negative tone produce positive
results. A project is not successful unless everyone is successful, including architects,
designers, engineers, contractors & owners. Good communication cannot be emphasized
enough. I believe in good, understandable procedures that have flexibility so that they can
be adapted to unique situations. I am a strong proponent of schedules and constantly
updating progress.
I feel one of my biggest strengths is problem solving. My philosophy on problem solving
is that there is no need to be smarter than everyone to be a good problem solver. The key
is being able to tap into the knowledge and experience of the members of a project team
and know how to analyze and use the information everyone contributes. Lastly, I like to
have fun and enjoy my work.
I hope that you will consider me for this position. I can provide references from any of
my prior bosses or project team members.
Thank you for your time and consideration.
Sincerely,
Curtis Lancaster
CURTIS LANCASTER
5498 Levens Ct. 702-***-****
Las Vegas, NV 89141 accjz7@r.postjobfree.com
EXPERIENCE
TRE Builders, LLC Las Vegas, NV
Senior Project Manager 2006 – Present
Project management of commercial construction projects for MGM Resorts
Development Group & MGM Mirage Design Group.
Responsibilities include development of project budgets, management of project
design including budget control and value engineering, bidding projects, manage
construction, costs management and cost projections.
Competed projects range from $300,000 to $75,000,000.
Provided Owner’s Representative services for MGM on the Mandarin Oriental Project
at the City Center project in Las Vegas.
Martin Harris Construction & Flagship Construction Las Vegas, NV
Project Manager 2004 – 2006
Managed hard-bid & design-build construction projects. Projects ranged in size from
$1,200,000 to $21,000,000.
Entelen Design-Build, LLC Salt Lake City, UT
Project Manager 2003 -2004
Completed design-build construction projects including management of the design
and construction process.
Layton Construction Company, Inc. Sandy, UT
Project Engineer, Superintendent 1999 – 2003
Completed design-build, CM/GC and hard bid construction projects.
Bernell Lancaster Construction, Inc Orem, UT
Lead Forman & Superintendent 1991 – 1999
Built custom residential homes
EDUCATION
University of Utah Salt Lake City, UT
B. S. Civil and Environment Engineering 2000
SKILLS
Proficient in SureTrak, Timberline, Expedition, Excel, Word, Microsoft Project.
*References available upon request.
CURTIS LANCASTER
PROJECT EXPERIENCE (Partial List)
YEAR PROJECT NAME TYPE VALUE PROJECT DESCRIPTION
PROJECT MANAGER
2013 Monte Carlo Front Entrance CM / GC $10M Extensive demolition and ground-up steel
Remodel & Double Barrel structure building. Tennant build-out of
Night Club T.I. Double Barrel Night Club.
2013 Michael Jackson Retail T.I. CM / GC $5M Remodel finishes at box office and lobby.
& Lobby Remodel T.I. remodel of theater retail store.
2012 Michael Jackson Cirque Show CM / GC $20M Theater Remodel including structural
modifications, new electrical infrastructure,
new finishes, seating and theatrical lifts.
2010 Mirage Suite Remodel GC $12M Hotel Room Remodel
2009 Mandarin Oriental Las Vegas CM / $600M Concrete, high rise structure with very
at City Center Consultant high-end finishes.
2009 Lion King Theater Remodel @ CM / GC $3.5M Steel structure remodel. Stage and
Mandalay Bay dressing room remodel. Sprinkler
system upgrade.
2008 Eye Candy Sound Lounge GC $10M Interior build-out of a night club in
& Bar the Mandalay Bay Casino
2008 Mandalay Bay Elevator Cab & GC $1.5M Interior Remodel
Lobby Remodel
2008 Bayside Buffet Renovation GC $500K Interior Remodel with high-end finishes
2008 Mandalay Bay Hotel Room GC $75M Interior Remodel of 3,200 hotel
Remodel roooms.
2007 Mandalay Bay Beach Remodel GC $4.7M Exterior renovation of the pool area at
Mandalay Bay including steel building
structures, ext. concrete & Landscape
2007 Mandalay Beachside Casino GC $17.5M Ground-up steel framed structure with
retail, restaurant, bar, casino, 3rd floor
pool and cabanas.
2006 Noodles Restaurant Remodel GC $300K Interior restaurant remodel.
2005 Paradise Aviation Jet Hangars GC / Design- $20M Ground-up, concrete tilt-up structure
Build with high-end office space build-out.
2005 Medical Office Building GC / Design- $1.2M Ground-up, wood framed structure
Build
2004 McCarran International Airport GC / Hard Bid $21M Ground-up, steel framed structure
Node 1 & 5 Expansion including baggage conveyors
2003 Roy Crossing Tennant GC / Design- $300K Exterior remodel of strip mall and build-
Improvements Build out of 3 tennant spaces.
2003 SLC Design Center GC / Design- $350K T.I. build out of 2 design stores, including
Build mezzanine structure and Electrical upgrades
SUPERINTENDENT
2003 Souplantation, Valencia, CA GC / $1M T.I. restaurant build-out inside 5 story office
Hard Bid building
2002 9th Street Plaza CM / GC $700K Ground-up cmu and wood structure,
including T.I. buildout.