Education:
- B.Sc. of Electrical and Electronics Engineering, Military College of
Engineering Baghdad - Iraq - 1999 (Five Years College)
Executive Summary:
More than 14 years of experience in Electrical Engineering, QA/QC, project
engineering and project management; during this period, I was hired and
worked in different positions:, QA/QC, Site Inspection, Project Manager,
HSE Manager, Document Controller, Site Engineer and Supervision Engineering
works. Most recent work experience includes more than six years working for
the Iraq Reconstruction Program with Air Force Center for Environmental
Excellent, US Army Corp of Engineers, US Army, and US Embassy in Iraq.
Advance computer skills in various packages and CAD applications, excellent
knowledge in various Engineering Codes and Standards e.g. NEC, IEEE, NFPA,
NEMA, IEC, IBC, IPC, IMC, IFC, PSDC, and UL. Working as Quality Assurance
Engineer and Quality Control Manager, Preparing and follow up the QA/QC
Plans. High acknowledgment of Inspection methods for construction, Oil and
Gas Field, and electrical works and documentation including inspection
forms, submittals, Technical Proposal for the Projects and Turn over
documents.
Skills and Qualifications:
- Excellent in Electrical Engineering Supervision and execution for the
electrical work of projects.
- Excellent in Quality Assurance and Quality Control Management,
Supervision, and documentation.
- Lead the Quality Control Team and make sure the work has complied with
QC Plan, Project Scope and International Codes and Standards
- Excellent in managing, mentoring, and coaching team members.
- Ability to work with multitasks and priorities projects and execute
with a high level of urgency
- Proficient with the latest version of AutoCAD (2006-2011), Microsoft
Office, Fluent Excel, Word
- Strong documentation and reporting skills
- Proficient with Preparing the Technical Plans for Construction
Projects.
- Technical knowledge of the Power Plant, Water Treatment Plant, Fuel
Facilities, JP8 Fuel Facilities, and construction.
- Project cost estimation; generate project material quantities take off
tables and proposals build up process.
Oil and Gas / Power Sector Experience.
Apr 2013 - Oct 2013 - Sales Engineer- KARMA Group
Commercial Agent for Wood Group Gas Turbine Power Plant Services.
- Sales Engineer and Representative of Wood Group Gas Turbine Power
Plant Services.
- Working on the introduction and promotion of WG for the Gas Power
Plants.
- follow up, coordination and cooperation with the Power Plant Managers
in Baghdad and Central Euphrate Production Directorates to get tenders
and direct invitation for bidding.
- Preparing and Delivering the Commercial and Technical Proposals.
- Reporting Visit reports to the Regional Manager to explain the status
of Tenders and to preparing the proposals.
- Conducting on line meetings with the Manager and Top Managers.
- Direct Contact with the Iraqi Ministry of Electricity to follow up the
Tenders and Bids.
Apr 2012 - Apr 2013 - Electrical Engineer & Document Controller - Mercury
Development offshore S.A.L
Sub-Contractor for Petrofac Iraq Base (Contract)
- Responsible for reviews Design & transmittals of electrical materials
and bill of quantity.
- Following up on the design drawings in addition to all detailed
technical drawings.
- Checking drawings, hands-on electrical design of inside buildings
electrical installation, conduit sizing, cable sizing, cable rooting,
fire alarm system power plant and pump station.
- Coordinated activities with engineers, designers, detailers, and
technicians.
- Maintain and follow up the documents including Project drawings,
forms, submittals, follow up with FTP, Coordinate with the DCC of
Client, and maintain the document flow.
Building and Construction Sector Experience.
Apr 2011 -Oct 2011 - Quality Control Manager- Middle East Dove Construction
Company
Prime Contractor for US Army (Contract)
- Quality Control Manager for the US Army FOB UNION III improvement
Project.
- Site Supervision on the items of project including Diesel Fuel
Facility, Installation of T-Walls, Installation of concrete walkways,
and Installation of 14 Guard tower.
- Follow up the performance of work to ensure the items of work complied
with the scope of work and QC Plan.
August 2010 -March 2011 - Quality Control/Site Safety Manager - Middle East
Engineering
Prime Contractor for US Army Corp of Engineers (Contract)
- Quality Control/Site Safety Manager for JP8 Bulk Fuel Facility - Taji
Air Force Base.
- Lead the QC Team to perform the QC Plan
- Conducting the Inspections and ensure the work Performance on jobsite
to comply with API 650 for JP8 Fuel Facility.
- Conducting the inspections and ensure the construction work on jobsite
to comply with IBC,IPC, IMC, NEC and other codes and Standards.
- Maintain the QC documents including inspection papers, Submittals, and
turn over documents.
- Lead the Safety Team to perform the HSE Plan.
- Direct Supervision on jobsite to ensure the safe work and performance
according to OSHA and USACE Safety Standard.
December 2008 -Feb 2010 - Site Quality Control Manager -Laguna Construction
Company
Prime Contractor for US Air Force Center for Environmental Excellent AFCEE
(Contract)
- Quality Control Manager for DFAC of 3200 Square meter with all
facilities in Baghdad Police College
- Lead the QC Team to perform the QC Plan
- Conducting the inspections and ensure the construction work on jobsite
to comply with IBC, IMC, IPC, IFC, NEC and other codes and Standards.
- Maintain the QC documents including inspection papers, Submittals, and
turn over documents.
September 2007 -December 2008 - Electrical Quality Assurance Area
Supervisor - Versar International Assistance Projects
Quality Assurance Representative for US Air Force Center for Environmental
Excellent AFCEE (Contract)
- Lead the QA Team of Baghdad Area projects to perform the QA/QC Plan.
- Ensure the performance of the AFCEE Contractor has complied with the
specifications, codes, and standards.
- Conducting follow up inspections and per-final/final inspections.
- Conducting QA/QC meetings and walkthrough.
- Conducting scheduled tour on the location of the projects in Baghdad
Region to inspect the electrical works of the projects and maintain
the QA team performance.
- Attending the Auditor visit and register his remarks in order to
ensure the contractor complies with.
- Review the QA Daily Reports for QA Team.
- Reporting to the Regional Manager the electrical inspection and issues
reports including the Deficiencies Non Compliance Report and Non
Compliance Notes.
May 2005 - December 2006 - Electrical Site Engineer - SIGMA International
Construction Company
Sub-Contractor for US Air Force Center for Environmental Excellent AFCEE
(Contract)
- Lead the Electrical Team for the project of Al-Rusumia Camp (7
Building).
- Lead the Electrical Team for the project of NATO Buildings (3
Building)
- Lead the Electrical Team for the project of Old Muthana Air Field Camp
(27 Building)
- Direct managing and supervision for the electrical work to maintain
the performance on jobsite.
- Conducting the initial tests and inspections for the electrical items.
- Reporting the electrical work items to the project manager
- Preparing the submittals of electrical materials and reporting to the
QC and Project Manager.
- Maintain the operation of purchasing the electrical Materials to the
project in time.
- Ensure the electrical work has Complied with the specifications,
codes, and standards and according to the shop drawings.
September 2003 - Feb 2005 - Electrical Engineer - Al Manar Construction
Company
Sub-Contractor for US Air Force Center for Environmental Excellent AFCEE
(Contract)
- Lead the Electrical Team for the project of Al-Nuamania Camp.
- Direct managing and supervision for the electrical work to maintain
the performance on jobsite.
- Conducting the initial tests and inspections for the electrical items.
- Reporting the electrical work items to the project manager
- Preparing the submittals of electrical materials and reporting to the
QC and Project Manager.
- Maintain the operation of purchasing the electrical Materials to the
project in time.
- Ensure the electrical work has Complied with the specifications,
codes, and standards and according to the shop drawings.
Sep 1999 - Mar 2003 - Officer (1st Lieutenant) Electrical Engineer - Iraqi
Marine Force Factory
Iraqi Marine Force - Basrah - Iraq
- Working as maintenance Engineer in Electrical and Electronic Dept.
- Manage and Lead the Military Electrical Team to repair and maintain
the electrical issues and defects in military ships, boats, and Patrol
Boats.
- Implementing the military instructions related to the technical
status.
- Reporting to the direct Commander.
Key Skills
. Windows XP, Windows Vista and Windows 7.
. Microsoft Office 2003, 2007, 2011 (Fluent Excel, Word).
. Microsoft Outlook and Internet Explorer.
. AutoCAD 2D (2004, 2007, 2009 and 2011).
. Languages spoken and written: Fluent Arabic, Fluent English.
. Preparing the Technical Plans, Project Schedule in MS Project, QC
Plans, and other Documents of Projects.
. Proficient in codes and Standards
2