<Soham Sudhir Bothare
*** *** **** ********* ** 76010 Phone: 817-***-**** E-
mail: ************@*****.***>
Lean manufacturing experienced MS Industrial Engineer.
Actively seeking Industrial/Manufacturing Engineer position and
immediately available to join.
SUMMARY
. Lean management and Green Belt Six-Sigma certified.
. Experienced in Gemba Kaizen and time study application.
. Facility planning and layout redesigning experienced.
. Good at labor planning and utilization.
. Experienced in on-site commissioning and troubleshooting.
. AutoCAD and ProE 4.0 certified.
. Good knowledge of control charting/capability analysis.
EDUCATION
Master of Science Industrial Engineering University
of Texas at Arlington May2013
Bachelor of Engineering Production Engineering University
of Pune, India June 2010
PROFESSIONAL EXPERIENCE
Manufacturing Engineer: Nandini Enterprises, Pune India.
Jul 2010-Jul 2011
. Work Sampling method and time study performed for labor utilization.
. 8D methodology and ishikawa used for root cause analysis of axis
alignment process.
. Redesigned basic component to reduce cycle time by 2Hrs.
. Suggested economical and efficient component to reduced assembly time by
4.5Hrs.
. Increased company profit by $27,000/annum after LEAN implementation.
. Facility layout redesigned for accommodation of extra machine and floor
space utilization.
Production Engineer Intern: PARI Ltd., Pune, India. Jul 2007 -
Dec 2007 and Jan 2010 - Jun 2010
. Assist in development of manufacturing plan, integration, testing and
logistics.
. Implement 5S and Gemba Kaizen.
. Developed Operator Method Sheets (OMS)
. Implement Poka-yoke for sorting process.
. Design and implement fixture for SMED.
. Modified in-line process into U-line.
ACADEMIC PROJECTS: University of Texas-Arlington
. Production and Inventory Control
August 2011 to December 2011
Presented a paper on "Incorporation of Push-Pull Method in Manpower
Planning Model".
Utilized tools like pareto analysis, ishikawa analysis. Inventory control
tools like EQM, safety stock and forecasting methods are studied.
. Metrics and Measurement
Jan 2012 to May 2012
Work sampling project and predetermined time study project conducted to
examine cycle time and determine worker efficiency. Work measurement and
work standards studied.
. Project Management August
2012 to December 2012
MS Project used for scheduling of an industrial project. Workforce
utilization, set-up deadlines, budgeting and bottle neck
reduction/elimination are important aspects of the project.
. Facility Planning and Layout
August 2012 to December 2012
Manufacturing-facility design for highly fluctuating demand and multiple
products. Techniques such as forecasting, capacity planning and
automated material handling selection for lead time reduction are used.
AutoCAD and VISIO used for layout design.
ADDITIONAL SOFTWARE SKILLS:
Solid Works, MS Excel, MS Word, MS Project, MS Power point, VISIO