Scott H Light **** Valerie Circle Wichita Kansas *7205
316-***-****/accabj@r.postjobfree.com
Objective: Challenging career in Engineering or Management or Manufacturing with a dynamic, growth oriented
organizations. Professional Experience:
September 2013 Present Lear Jet- Planner/M.E. . Created new planning concept for moving assembly line for testing and
building processes. Worked with Mech’s. To resolve engineering issues with build errors in drawings. Held configuration
for electrical planning doc’s.
June 2013- September 2013 Bell Helicopter-Machine/Planner, Configuration designing for programing for NC
programming of Machine parts in CATIA V6.
June 2012-June-2013- L-3, Crestview, Florida M.E./Planner, Configuration Planning of detail and assembly of new parts
for Bell Helicopter and Boeing. Assembly planning for new CH-47G and UK version in conjunction with working with
Mech’s for ease of assembly within the planning structures. Part of the PCA audit team for process improvement and
configuration
Feb. 2012-June 2012 Bell Helicopter, Fort Worth, Texas M.E.-Planner, Responsible for new planning of BOM in
preparation for SAP as well as holding new configuration of all old data for certification for new updated ENOVIA
upgrade. Working with all assemblies of manufacturing concerned of purchased assembly. Direct contact of suppliers to
help understand the build process set forth by Bell procedures.
November 2011-Feb 2012 Sikorsky Helicopter, Troy, Alabama Process Engineer/Planner: Responsible for final assembly
and modifications of avionic and electrical harness. Red lined all planning procedures for Installation and planning for all
Black hawk helicopters in final assembly. Was given the First avionic and electrical Rack to be installed in Troy. Built all
planning and procedures for new detail racks.
June 2011-November 2011 Bell Helicopter, Amarillo, Texas Manufacturing Engineer/Planner: Responsible for electrical
Harness fabrication, installations and pictorial planning from off-loaded work out of Bell Hurst facility. Created new
planning for all form boards and electrical lay-out and installation. Assigned to the OH-58D program utilizing BIEMS,
BEDVU2, CAPI, CAPPII, CSCAPP, VISIPRISE (HMSCAPP) and ENOVIA.
May 2010-June 2011 Boeing, Charleston, South Carolina Mech./Planner Engineer, 787 Dream liner Ship side support for
all wiring phases for Boeing newest aircraft 787 Dreamliner. Directly working with Mechs. to solve wiring issues during
powering up the aircraft for the first time. Was put in charge of (ECAT) Electrical Corrective Action Team. To Resolve all
planning building issues.
Sept.2008-Feb.09 Lear Jet Wichita, Kansas Engineer Planner/ Methods Elec. Avionics Responsible for testing and
certification papers on all Lear Jet aircraft to comply with FAA standards. . Developmental testing and final design of
electrical, avionics and hydraulics combined FAA certification, DOD qualification and aircraft system testing.
Responsible for functional testing of new parts received. Created new planning concept for moving assembly line for
testing and building processes
Aug 2007-Sept.2008 Fuller Brush Company. Great Bend, Kansas VP of Mech./Elec. Engineer Revising out dated
equipment with new plc's on manufacturing floor. Supervised 50+ employees with training and safety on new injection
mold systems. Introduced six sigma and new programming for plc's.
Feb 2007-Aug 2007 LSI Logic Wichita, Kansas Electrical Engineer Responsible for the new XBB controllers and Board
configuration testing, Running of ESS Chamber for fixing trouble with components within the XBB controllers.
Feb 1996-Feb2007 RAYTHEON CORPORATION Wichita, Kansas Electrical Engineer Manufacturing Test
Engineering/planner. Responsible for testing and certification papers on all Raytheon Aircraft including JPATS T400A,
Premier, Hawker, Horizon, Beech jet, Baron, Bonanza, King Air and Model 1900 lines. Developmental testing and final
design of electrical, avionics and hydraulics combined FAA certification, DOD qualification and aircraft system testing.
Project lead for the Hawker Horizon build-up procedures, the latest composite design for Raytheon Aircraft. Department
Safety Manager responsible for training and JSA program. Preformed auditing for OSHA, FAA and Military compliance.
Responsible for functional testing of new parts received into Raytheon Aircraft.
Feb 95- 96 RAYTHEON CORPORATION Wichita, Kansas Metrology Manger Repaired all signal generator, power
supplies, and power antennas. Administrator and Security for Raytheon servers to include service calls on 10,000 plus
PC's, printer and plotters.
Feb 1995 - Jan 1991 United States Navy. Honorable discharge Aviation Electronic technologist. Graduated sonar and
radar Specialist training. Held rank of E-4. Was in charge of ships manuals and logs to control all ship movements and
training for all deck hands. Made all preflight testing on HL-60 helicopter on board.
Feb.2001-Jan 2003 Country Side West Bowling Wichita, Kansas Owner Owned and Managed a 7 Million sports complex
to include all equipment, machines and maintenance.
Education: Eastern ILL. University
1985-1989 degree in electrical engineering graduated with a 3.1 GPA in 1988 and 1989 was co-captain of the baseball
team division II.
1995 -1991 AVIATION ANALYST TECHNICAL, SONAR, RADAR SCHOOL A School and C School an equivalent as
AS in electronics Total Quality Leadership, Fire Control Specialist Quality Management, 3M Maintenance. 1990-1991
Am tech Institute Electronics Tech. - Certification 1992.
Computer Skills: CATIA V5, CAD, PRO E, Helix, Micro-cad, Q-Basic, LAN, WAN, Win 95,97,2000 and office pro
DELMIA MES, VELISOTY, ENOVIA, IVT,EID/Redars.