Selamhan Emin Kazokoglu
*** * ******** ** #*, Chicago, I L 60607 I 773-***-**** I
k ********@*******.***
SUMMARY
Demonstrated success in int roducing new products in to sales. Warehouse and retail store
management experience with direct responsibili ty for t raining new hires. Creative
analytical problem solver. Hands-on experience in assembly and fabrication. Strong
t roubleshooting ability to repair computer and electromechanical systems.
EDUCATION
U niversity of I llinois at Chicago
Chicago, I L
College of Engineering – Bachelor of Science in Industrial Engineering
December, 2011
WORK EXPERIENCE
E FE I n te rnational, I nc., Manager Melrose Park, I L J une, 2010 –
P resent
• Redefined job descriptions resulting minimized overlaps in responsibilities and increased
efficiency.
• Improved shipping speed, decreased errors, reduced shipping and storage costs by
changing layout.
• Monitoring daily, weekly and monthly performances of employees to assure predefined
data entry and shipping accuracy goals are met.
E FE Computer, Lead Technician Melrose Park, I L June, 2008
– J une, 2010
• Responsible for testing, repai ring and maintaining of microcomputers and peripheral
equipment.
• Implemented a repair order database which lowered order errors and improved customer
assistance.
• Used a variety of electronic test equipment for diagnosis.
• Responsible for t raining new technicians in repair and maintenance procedures.
• Provided on-site support for computer networks, security systems and surveillance
systems.
PROJECT EXPERIENCE
Plant Layout for M iller Welding and Machine Co. Homer
C ity, PA / Chicago, I L
• Analyzed location and material f low constraints.
J anuary–May, 2010
• Used linear programming to develop a program that calculated an optimal layout for the
new plant.
C rime F ighting Method Selection Using Branch and Bound Algorithm
Rogers Park Chicago, I L
• Analyzed past crime and expenditure data.
J anuary–May, 2010
• Used branch and bound algorithm to find best crime fighting methods for given area.
Work Method and T ime Study for Tu rano Baking Company
Bolingbrook, I L
• Performed time studies on current production line. September–
December, 2009
• Identified bottlenecks and suggested optimal machinery setups and employee scheduling.
Computer Simulation for Wendy’s Fast Food Restaurant
Chicago, I L
• Analyzed customer f low and cash register data for given t ime periods. September–
December, 2009
• Constructed a computer simulation and recommended optimum cashier scheduling.
SKIL LS
• Microsoft Word, Excel, Access, PowerPoint, AutoCAD, ARENA simulation software
experience.
• In tel MCS-51 and PIC micro controller Assembly, BASIC, C, Java language experiences,
robotics.
• Vehicle electronics and engine control systems diagnosis and repair.