CURRICULUM VITAE
Name : JOSE CARDIENTE MORILES
Mobile No. : +966-**-*******
Nationality : Filipino
E-Mail Address : ********@*******.***
Passport Details :
Passport No. : XX4742106
Date of Issue : 13 October 2009
Valid Until : 12 October 2014
Issuing Authority : Philippine Embassy Riyadh
Objective:
To gain employment with a company where my leadership experience and
knowledge, especially in the area of telecommunications, can be used
effectively.
Summary:
. Operation and maintenance of Ericsson mini-link: E classic, TN and HC.
. Operation and maintenance of Ericsson RBS 2000 and 6000 family.
. Operation and maintenance of Ericsson OMS 1410 R2. And upgrade
software to SPO 1410 R3.
. Respond and execute work orders and close in the WFM within SLA
target.
. Routine preventive maintenance inspection on network elements eq.
Ericsson mini-link active alarms, receive signal level, DCN
connectivity.
. Routine preventive maintenance inspection of Ericsson RBS 600, 2000
series and antenna system.
. Mini-link TN Software Baseline upgrade, locally and remotely to latest
release (R5), using mini-link craft R13B.
. Troubleshoot DCN lost connectivity of network elements remotely by
accessing FE site and open telnet session to verify network
connectivity issue using CLI tools.
. Represents for the operator in new site, expansion and link upgrade
acceptance test.
. Cisco Certified Network Associate (CCNA), 2013- 414204577039FNBG.
Specialties:
. Operation and Maintenance of Ericsson Mini-link: E, TN and HC
. Operation and Maintenance of Ericsson RBS 6000 and 2000 macro and
micro.
Experience:
NMS Engineer, April 2010 to Present
Mobily NMS, Ericsson AB, Saudi Arabia
. Perform corrective maintenance to resolve faults on RBS 2xxx, 6xxx
series and Microcell, Mini-link TN and HC. And restore network
services.
. Perform preventive maintenance to minimize the number of faults
occurring in the network.
. Software upgrade of Mini-link TN and HC baseline.
. Perform software upgrade of Ericsson (Marconi) OMS 1410 to Ericsson
SPO 1410.
. Perform site acceptance inspections and test for new sites according
to site completion checklist.
Project Delivery Manager (Ericsson Mobily Project), June 2009 to March 2010
EXi Telecom Saudi Arabia Ltd. NOVIAcom
. Creates and executes project work plans and revises as appropriate to
meet changing needs and requirements.
. Identifies resources needed and assigns individual responsibilities.
. Manages day-to-day operational aspects of a project and scope.
. Ensures project documents are complete, current, and stored
appropriately.
. Determines appropriate revenue recognition, ensures timely and
accurate invoicing, and monitors receivables for project.
. Follows up with clients, when necessary, regarding unpaid invoices.
Project Coordinator (Ericsson Mobily Project), September 2007 to May 2009
EXi Telecom Saudi Arabia Ltd. NOVIAcom
. Proactively coordinating projects and acting as central point of
contact for the project team including client, facilitators, director,
and project assistants.
. Implementing the agreed action plan to the agreed standards and
deadlines.
. Ensuring the effective preparation and delivery of all project events
and meetings and production of all necessary documentation.
. Taking responsibility for the effective flow of information between
team members and participants in project activities.
Telecom Engineer (Ericsson Mobily Project), March 2005 to August 2007
EXi Telecom Saudi Arabia Ltd. NOVIAcom
. Testing, commissioning and integration of Ericsson 2000 series and
Microcell.
. Testing and commissioning of Ericsson Mini-link TN (Traffic Node) and
HC (High Capacity).
. Mini-link TN baseline software upgrade, BER and feeder cable sweep
tests.
. PAT tests (Site acceptance testing).
Telecom Engineer, September to November 2004
Teledesign Philippines Co. Inc (Digitel Mobile Phil. Inc. Project,
Philippines)
. Installation, testing and commissioning of Ericsson RBS 2206 and Mini-
link E classic.
. PAT (Preliminary Acceptance Test) and Hand-over testing.
Telecom Engineer, December 2004 to January 2005
LM Ericsson Bangladesh Limited
. TI (Telecom Installation) consultant at Grameen Phone Ltd. Project.
. PISM (Pre Installation Site Meeting) Inspection, Civil works
inspection prior to Telecom Installation.
Installation Engineer, January 2002 to January 2004
EXi Telecom Saudi Arabia Ltd
. Installation and testing of Ericsson macro and micro RBS, antenna and
feeder system.
. Installation, testing and alignment of Mini-link E classic and micro.
. Testing of GSM antenna and feeders (sweep test), Min-link functional
tests.
LOS (Line Of Sight) Survey Engineer, February 2001 to November 2001
Keppel Communications Philippines
. Line of sight survey for point to point microwave radio transmission.
[pic]