Richard J. Bobosky
******@*****.*** • **** Ave Del Presidente #17 • San Clemente,CA 92672• 734-***-****
Maintenance & Facility Director leveraging 15+ years’ expertise in plant and people management, an impeccable
safety record, and a focus on preventative maintenance and teamwork to operate at peak efficiency.
Positively impacts the bottom-line via diligent task management and proactive solutions
Raised uptime numbers on key equipment 25% while managing $2M budget; accomplished by strategically
tracking machine needs and accurately forecasting repair or replacement time.
Kept plant open by soliciting $800K in departmental revenue after a loss of funding by providing in-house
services which were previously outsourced.
Saved an average of $233K in annual wages - preventing layoffs - by dividing maintenance shifts to
eliminate overtime despite tough union negotiations.
Identifies talent and ability positioning and developing employees for maximum efficiency
Raised preventative maintenance task completion 27% in 18 months exceeding plant standards.
Trained 35 employees on total productive maintenance (TPM) procedures bringing together all team
members from operator to repair technician to insure machine wellness.
Career Progression
OUTHERN CALIFORNIA EDISON
S
PROJECT MANAGER – (2013 PRESENT)
MANAGE CAPITAL PROJECTS $ MIL ROOF INSTALLATIONS
REMOVAL AND DEMOLITION OF BUILDINGS
SET UP TRAINING BUILDING WITHIN FIRING RANGE AT CAMP PENDLETON
MANAGE SIGNAGE
MANAGE CAMP MESA
SOLAR LIGHTING INSTALL PROJECT
TECH SPEC/SCIENTIST (2010 2013)
MANAGING THE PREVENTATIVE MAINTENANCE AND SURVEILLANCE REPORTING AND PLAN CHANGES, COMMUNICATING DEADLINES, PROGRAM
MANAGEMENT.
UPDATING MAINTENANCE PLANS IN SAP, MARS AND IVARA. COORDINATING SCHEDULING CHANGES ACCORDINGLY.
6 MONTHS ASSIGNMENT AS AN OPERATING EXPERIENCE COORDINATOR WITHIN PERFORMANCE IMPROVEMENT, TRACKING AND COMMUNICATING
PLANT OPERATING EXPERIENCE METRICS SITE WIDE
HRYSLER CORPORATION –
C
(2007-2009) - DODGE VIPER PLANT
FACILITIES ENGINEERING MANAGER
Directs operations for a 345,000 square feet facility on 27 acre site; maintaining 470 pieces of equipment
through TMS; overseeing building, grounds, heating, cooling, and fire systems.
Organizes building evacuations as Incident Commander.
Assures compliance with QS 9000 and QS 14000 standards and state reporting requirements including
proper handling and disposal of hazardous waste.
(2005-2007) - PILOT OPERATIONS
MAINTENANCE FACILITIES PLANNER
Introduced Smart Manufacturing visual management as part of tooling installation pilot program.
Implemented TPM Process training small groups through Checkpoint 2.
(2002-2005 )- PILOT OPERATIONS
MAINTENANCE SUPERVISOR
Planned and oversaw $2M renovation of monorail system adding two new lines of production doubling
testing output.
Led 26-member team evaluating and utilizing all production related equipment and pilot tools.
SPECIAL VEHICLE OPERATIONS MANAGER/
(1994-2002) - STERLING HEIGHTS VEHICLE TEST CENTER
QUALITY ENGINEERING SPECIALIST
Operated in a role of increasing management responsibility overseeing
up to 18 technicians, supervisors and clerical staff.
Prepared vehicles for press demonstrations and car shows travelling to South America, South Africa, and
the Middle East for event set-up.
Engineered large vehicle fleet repairs, managing and delivering multiple
projects at once to specifications on-time and under budget.
MS in Administration BS in Industrial Management, Central Michigan University
Trade Certification in Automotive Technology, Motech Automotive Institute