Dino Vela
Idyllwild, CA 92549
Phone # 951-***-****
**********@*****.***
Objective:
To acquire a position in the Telecommunication industry to perform various duties, from running a project
from start to finish as a Construction Manager. I've been in the industry for over eighteen years. I’m looking
for a company that will allow me to utilize my professional skills.
Skills:
Admirable knowledge of business concepts and practices working as a construction manager on
•
wireless environment
Outstanding knowledge of safety guidelines and concepts
•
Operational knowledge of files construction concepts and procedures
•
Remarkable ability to interpret blueprints and architectural sketches
•
Sound ability to track job progress and complete projects within deadlines
•
Skilled to multitask and prioritize work
•
Excellent skills to plan projects and analyze efficient working
•
Familiarity in working on Microsoft applications
•
Solid understanding of building codes and zoning regulation
•
Qualifications:
•
• Able to supervise and monitor up to a twenty person crew or more on several job sites
Experience with Nordx, Lucent, Meridian, and AT&T partner switches
•
Extensive copper and fiber experience including splicing and testing
•
• Ability to design and build cable and fiber infrastructure & cell site engineering or Build
Capable of terminating high pair copper and fiber on 110 blocks or 66 block
•
Install Microwave Equipment & Install software or upgrades
•
Extend T1’s on Microwaves & DSX panels or OSB
•
• Experience on Lucent Alcatel equipment, Node B UMTS, MDR 8000 & 9500
Microwave and Ericsson Node and GSM
Can read AT&T granite path designs on T1 extension
•
T1 cut over from Microwave to NIU
•
Cut over on phone systems requiring adds, moves & changes
•
Installed and test new Cisco VoIP implementation equipment
•
• Build VoIP from ground up to routers
• Build Network Data centers from ground up
• Troubleshoot VoIP,Data,OSP, Phone switches and Fiber Optic
• Decommission Cell Sites for migration and upgrades
• Knowledge of WAN,MAN,LAN facilities and TCP/IP
• Current or recent infrastructure, technology cutover or IT systems build out project
Management experience.
• Heavy vendor oversight management
• Solid and demonstrated project management methodology experience
Employment History:
2012 2013 Berg Electric & Telecommunication
Foreman:
• Job duties are to obtain a project from start to finish, run the project with crews of 15 or more.
• My objective goal was to manage the project with the least amount of issues.
• Find problems before they occur and reduce the amount of budge coast that is contracted for the
project. Represent the company by having high standards and finding better solutions that may be
beneficiary to the company as well as the customer.
• Follow all safety procedures and building codes that applied to OSHA regulations. Obtained daily
reports to Project manager of day to day progress.
• I developed a relationship with other venders on project by communicating with scheduled work
that lies ahead.
2010 2012 Mycom North America USA
Construction Manager:
• Administered construction sites and associated activities for AZ & NV market working on ETTCS
& L2 testing for AT&T provider.
• Managed vendor relations and resolved site acquisition issues for LTE/UMTS
• Reported weekly on the status of site acquisitions through CASPR Milestones.
• Coordinated with various teams and assembled bills of materials and prepared schedule for cell
sites. Evaluated bids, interviewed contractors and ensured compliance within the budget. Managed
firms, reviewed various drawings and prepared status of projects.
• Responsible for vendor completion of leasing, permitting, zoning, and Landlord notifications within
scheduled times
• I would prepare status reports for construction site work on a weekly basis to be submitted to
project manager.
• Developed construction process and worked according to standards, Maintained work according to
site vendors. Oversaw all zoning submittals and prepared building permit process.
My duties include designing sites, ensuring power and TELCO availability, reviewing and
•
approving A&E drawings.
• This involves walking sites with the client clarifying and enlarging the scope of work, engineering
and re engineering site by site, estimating engineered cost estimates based on sound financial skills,
and construction experience.
• Developed and implemented communication plan regarding on going strategic initiatives.
• Performed the site walks, completed the checklists, reviewed the construction photos and cabling
installations per Go sol floor plans and install standards.
• Included zoning, permitting, engineering, both RF and civil, site acquisitions, and solving
constructability issues.
• Environment: LTE, UMTS, MS Office. (technical skills used)
• Managed several sub contractors in engineering, constructing, zoning, permitting and placement of
equipment.
2006 2009 Giannelli Electric
Project Manager:
• Monitored all phases of project’s development and ensured customer satisfaction with U.S.D.
Developed project goals and objectives, monitored project for accuracy and ensured its completion
on time.
• I would manage all reports of updates, project status and problem resolution for various
telecommunication plans.
• Follow all safety procedures and building codes that applied to OSHA regulations. Obtained daily
reports.
• I developed a relationship with other venders on project by communicating with scheduled work
that lies ahead.
• Inspected equipments and services provided by external vendors and ensured its standards
according to required specifications as given from the U.S.D. Oversaw working of projects and
ensured compliance with Federal Communications Commission.
• I maintained good working relationships with general public and local agencies. Determined
effectiveness of projects and ensured its timely delivery.
• Established reports on expenditures incurred on project.
2003 2005 Berg Electric & Telecommunication
Foreman:
• Managed several large jobs:
• Overall Responsibility was to have an understanding of the projects. Keep focus on the task that lies
ahead keep track of the projects were about. Lead the crew by teaching them the right way to safely
finish a task that is given.
• Keeping track of materials that arrive on site and day to day reports on material that were used and
what may be needed in the future.
• Stay focus on projects to accommodate the satisfactory of completion for the costumer.
1999 2001 Pacific Coast Cabling
Lead Technician:
• Responsible for additional moves and changes at Fox Studios in Century City.
• I was responsible for the maintenance of Fox Studios entire communications network.
• I ran a crew of ten technicians to perform this service.
1995 1999 Lucent Technology
Tech/ Cable Puller:
• I learned the fundamental basics of cable install.
• I learned the color codes that accommodate the phone systems, OSP and termination blocks.
• I adapted to the tools that are used in the industry. I accomplished the ability to terminate fiber optic
and test.
• I learned how to troubleshoot and repair issues that occurred on site.
• I learned how to install OSP cable underground by using safe methods to prevent myself or crew
members from getting seriously injured.
• I accomplished the ability to becoming a Phone technician by maintaining the Phone systems.
Education Level:
High school Diploma