CURRICULUM VITAE
*. PERSONAL INFORMATION
SURNAME : COOK
NAME : CHARLES
FULL NAME : CHARLES RAYMOND
DATE OF BIRTH : 1966/02/07
PLACE OF BIRTH : WORCESTER (CAPE)
I.D. NUMBER : 660**********
ADRESS : 14 COLLIN STREET
JOHN VORSTER PARK
ERMELO
2351
TEL. NUMBERS : (H) 017-*******
(Cell) 079******* or 082*******
MARIAGE STATUS : MARRIED
SPOUSE NAME : MARIA ALIDA
LANGUAGE : AFRIKAANS & ENGLISH
VEHICLE LICENSE : CODE 02 AND 08
HEALTH : EXCELLENT
CHILDREN : 2 SONS - 23yrs AND 20 yrs
CURRENT WORK ADDRESS : Die Koffiepomp (own business)
14 Jan van Riebeeck Street
Ermelo
2351
2. ACADEMIC QUALIFICATIONS
. Senior Certificate (1983) High school Dirkie Uys - Bluff - Durban
Subjects: Afrikaans; English; Maths; Physical Science;
Accountancy; Geography.
. Highest extra curricular qualifications: Technical College Natal,
Umbilo (Durban)
Subjects: Electrical Engineering; Industrial Electronics; Fault
Detecting and Safety Equipment. All the above-mentioned were passed
on N4-level. (N5 incomplete)
~ SEE ATTACHED CERTIFICATES ~
3. OTHER WORK RELATED COURSES
. Labour Relations Course - Successful
. Green Area Course - Successful
. D/Base 4 Course - Successful
. Electrical Apprentinship Course - Successful - 300 days
. High Voltage (Bobaan & Substasie) - Successful
. Fulmen Telecontrol Course - Successful
. Hot Box detector set up and control
. Transnet - Management Coarse - one week per month for a year
. Project Manager for 2 big projects and various small ones
. Coarse for analysing root causes of incidents
. Conducting conferences and interpersonal relationships
. Technical College Courses as follows:
a) National Certificate - N2 (Nr. 569666)
b) National Certificate - N3 (Nr. 314176)
c) National Certificate - N4 (Nr. 215700)
d) National Certificate - N5 - Passed half of it
~ SEE ATTACHED CERTIFICATES ~
3. CAREER HISTORY (Experience)
2009 - 2012
1) I was appointed Manager MIS for the COALline after the post was created
and advertised. All the information systems for the intelligent equipment
next to the track, was part of my portfolio in the Infrastructure
environment. My job description was as follows:
a) Preparing statistics and analysing thereof - Electrical, Signals,
Perway and Telecoms
b) Presenting information to top management on a relative understanding
format
c) Prepare annual budgets and driving then on a monthly basis and execute
the plan
d) Extensive traveling through the region which I was responsible for
e) Assist with training in the SAP environment - Maintenance programs and
setting them up
f) Do on the job training - This being a fairly new field that had to
explored - new technology
g) This was a new position with new challenges that we needed to
establish and implement
h) Generating reports on production and progress - Weekly, Monthly and
yearly intervals
i) Setting up formats and design reports for management in the
infrastructure environment.
j) Training and teaching staff in the following field of expertise:
SAP
Computer Literacy
Basic Technical concepts and statements to understand the
infrastructure environment
Maintenance execution principles
Compiling Budgets and also assist other disciplines
Safety implementation
Coordination of annual shutdowns and program implementation -
Project Manager
Compile statistics and graphs and analyse them for future shutdowns
k) Work extensive hours to get stats completed for management on short
notice and verify the
correctness of the information
l) Attending various seminars and management planning meetings to assist
with new innovative
ideas and implementing them as working inniciatives
m) Health and Safety, as a manager was my primary concern and had to be
driven because this
was one of my KPI's which I was measured on
n) I always look forward for any challenge that my come up or they needed
me to pursue - I have
always done everything to the best of my ability
2004 - 2009
SAP System was only used to capture the hours worked on a bulk PM Order as
per Line Code. Projects were done separate and Maintenance PM's was also
done as per Line Code per Cost Centre. Currently I am monitoring the
System (Maint.) on SAP in Ermelo and all the MIS related issues are
reported and registered by me in Ermelo. Mr v.d. Linde upgraded me in the
beginning of this Financial Year to ask me if I would be entrusted to do
this. All this related staff reports to me and we supply Management with
information.
. All technical info on faults - Infra Ermelo
. Complete budget for Electrical systems in Ermelo
. Represent Infra on the conference (Heavy Haul) in Ermelo
. Monitor the projects - Electrical & Signals
. Handle all material related issues - Electrical & Signals
. Handle all IT problems for Infra Ermelo
. Handle all SAP profiles for Infra Ermelo
. Handle technical specs on Electrical Material
This has been my first big project that I have managed and implemented it
successfully. This had to be implemented on depot level and also on
management level on the Coalline (Transnet). This is the line that runs
from the coal fields down to Richards Bay.
2000 - 2004
Since 2000 we started to implement SAP in Electrical Systems in Ermelo -
The reason for this was that the rest of Spoornet were already working on
SAP but not on COALlink and OREX - We could not order maintenance
material for the depot in Ermelo - We had to use SAP and work via a PM
Order - This was a new concept for Ermelo staff .
Then I started to implement SAP in Electrical Systems in Ermelo from
scratch - We had to start from anew with Electrical, Signals and Perway
pertaining all SAP related issues - From there it escalated to Vryheid
and Empangeni on the COALline - This was implemented initially on
Electrical Systems where Perway was working on a different system - We
started to capture all relevant technical information and this had to be
fed into SAP - I had to start implementing the complete system on
COALlink and was also responsible for training the staff that had to work
on SAP - I had to monitor the system for 4 years (a distance of 450km).
We also got Ogies depot 150km that was extra (STK's)
People needed to be appointed in the various SAP positions.
After I trained the staff, they used these jobs as stepping stones for
promotion and at the end of the day we had no staff left operating SAP R3
- I was convinced that the training they received were of excellent
standard (on-the-job-training / practical) - Due to the staff that left
the depot we ended up with a big back-load of work on SAP.
1997 - 2000
Work on the Ermelo Section (25Kv AC, 3Kv DC, 11Kv AC) due to a shortage of
staff in Ermelo for the above period - There was a shortage of qualified
technical substation technicians due to numerous reasons (wide variety of
voltages).
Due to this shortage of staff they needed extra people to do stand-by for
call-outs on substation equipment - In the same instance I still had to do
the functions of the Depot Planner at that stage.
I had to work overtime and Sunday time with the substation staff so that we
could complete the set-aside workload of the month. We had to uphold the
standard of maintenance and repairs to OHTE in the Ermelo Section.
This carried on for three years in which time I had to perform my regular
duties during day-time as well as helping the staff outside in the section
after hours and weekends.
1992. - 1997
Current position was - Technical Offices Infrastructure at Spoornet
Electrical in Ermelo.
My Controlling Officer was - Mr G.J.G. Coetzee (Tel. 017-*******)
The Electrical Engineer for COALlink was - Mr J. Koekemoer.
Occupy position - 5 years at Spoornet Electrical (North-Natal) (COALlink) -
received great experience in connection of depots - worked independent on
the planning aspect of certain depot functions.
Responsibilities are prioritised as follows:
a. Had to take care that the right material was bought for the
COALline (COALlink)
b. Supervision of cleaning staff under my control.
c. The purchase of all (Non-stock items) that staff needs to fulfil
their work effectively.
d. In advance planning of projects and capture of important data.
e. Monitoring the use of fuel usage (vehicles)
f. Capturing data on fuel slips (D/Base 3)
g. Drafting the following documents:
a. Year planner
a. Depot minute
b. Law 85 of 1993 minutes
c. Bobaan-fault meeting minutes
d. Substasie-fault meeting minutes
h. The control of 73-File Systems (Law on Occupational Health and
Safety)
i. Most of our planning is done on computer ( 600 S.T.K.'s)
j. The making of "Energising and De-energising" notices on
electrical equipment on all sections.
k. Data capturing of overtime and Sunday time of whole depot as
well as graphics on statistics.
l. Does all purchasing of material for Spoornet Electrical in
Johannesburg and Pretoria and thus have close relations with
private firms elsewhere.
m. Supervising of the following items:
a. Viamax fuel statements
a. B.D.R.S. time charts
b. Leasing-costs charts
c. Invoices of firms (payments)
d. Requisitions has to be checked
e. Control of "log" charts
f. Control of safety talks.
n. Doing the budget of 3 depots (Head- Substasie and Bobaan depot).
a. Business Budget - 3
depots
a. Activity Budget - 2 Operational depots
o. Does call-outs whenever needed or help is needed.
p. In control of replenishing the Petty Cash (R1 200-00)
q. In control of furnishing tools and keeping the records up to
date.
r. When needed - reparation on Substasie :
a) Double and
Single unit Substations
i. Rectifiers (3Kv DC)
ii. Transformers (3Kv en 25Kv AC)
iii. O.C.B. different sort (88Kv and 132Kv)
iv. Track Breakers (3Kv, 25K & 11Kv)
v. Battery Chargers
vi. Batteries (different types)
vii. 11Kv VCB's on transmission lines
viii. Cable ends and joints on 3Kv, 11Kv and
25Kv.
ix. Bundle Conductors 11Kv and their parts.
x. 11Kv OCB's and equipment in the EL&P
substations.
s. Repairs on High Mast Lights and Security Lights
t. Repairs on Telecontrol on our section. Repairs on the following
charts: a. Modem
a. Control Output
b. Line Card
c. Return Card
d. AC and DC power supplies
e. Maintenance on batteries
u. Issue and balancing of all special work orders
v. Control all claims against equipment related to Electrical
Ermelo (all High voltage Equipment)
w. The controlling of 26 vehicles under the depot's control
x. Regular checking of equipment related to substations and
"bobaan"
y. Attend regularly the following meetings:
a. Material (Store) meetings
a. Budget meetings
b. Planning meetings
c. SHE Meetings
d. Financial meetings
z. I am skilful on the following Computer programs:
a. D/Base 3
a. D/Base Applicator
b. D/Base 4
c. Lotus 123
d. Q-pro
e. Pro-Write
f. PC Tools
g. Rek Mel (Maintenance Program)
h. Windows "95
i. MS Word - MS Office
j. MS Excel - MS Office
k. MS Projects - MS Office
l. Power Point - MS Office
~ much more ~
1989. - 1992
After completing my apprenticeship successfully, I applied for a position
at Transwerk in Durban (Bayhead) - That year was extremely hard to find a
position as an electrician, openings were all frozen - Transwerk accepted
me for a period to prove myself capable.
I started on the old bonus system at the stage where my bonus would be
33% - As your work performance improve your bonus would be adapted.
After 6 months my bonus was 70% - While busy with in-depended services a
vacancy opened which I applied for at Transwerk and I was appointed.
My responsibilities were as follows:
a. The maintenance of the following machines:
1. Welding machines - Electrical
2. Overhead Cranes - Electrical
3. Rectifiers
4. Associated equipment for Plating Shop
5. Wheel-abrater
6. Spray and shot blast booths
7. New installations
8. Transformers
9. Battery Charges
10. Electronic Cards, etc.
b. The maintenance on all portable electrical equipment in
workshops to whom we serviced
c. The checking of Fire extinguishing equipment in all workshops
to which we serviced.
d. Check and maintain all earth leakage units on our section
e. Appointed the task of safety representative on our section
f. There was a maintenance program on all machines in the complex.
It had to be done on a regular basis.
g. It was expected of you to work overtime every weekend to improve
production and for production to run smoothly every day.
1986. - 1989
I started my career as an Apprentice (electrician) at Electrical Training
School Umbilo on 16 February 1984 - only 7 people were chosen on that
occasion for Apprenticeship at the school - and I was fortunate to be one
of the seven chosen ones.
Our training on the section took place at the following places:
a. Durban Harbour "Dry Docks"
b. Northdene - Worked on the north-coast
c. Port Shepstone - Worked on the south-coast
d. Durban Harbour - Wharf 101
e. Pietermaritzburg - High voltage
f. Goodshed at Umbilo - Auto sort
g. New Durban Station - worked in the city
h. Bayhead Complex - mechanincal workshops
i. C.E.W. - Motor rewind
1984. - 1986
After school I had to defend my country on the border against terrorism.
I was called to the Air Force Training Facility in Valhalla at Pretoria.
I was there for 4 months basic training - I was then transferred to
Waterkloof Base for the 2nd phase training.
We were then transferred to different bases throughout the country for
the last 15 months. Of those 15 months I spend 11 months on the border.
In those 11 months I received two medallions.
INTERESTS AND HOBBIES
. Interior Decorating
. Maintenance on house
. Camping
. Gardening
. Cycling
. Play Volley Ball
. Table tennis
COMMUNITY INVOLVEMENT
. Attend regular fellowships with fellow Christians
. Attend discipleship meetings regularly
. Feed the street children on Saturday evenings
. Assist people in need (spiritual & physical)
REFERENCES - Name and Adresses
a.) Mnr. C.J.J. van Rensburg
Pastor
N.G Kerk
Posbus 21044
Fynnland
b.) Mr W.P. Boshoff
Principle
High School Dirkie Uys
P.O. Box 21042
Fynnlands
4020
c.) Mr. P. Walters
Manager
Training School (Transnet)
Umbilo
Durban
d.) Mr F. Meyer
Technical Superindendant
Maintenance (Mechanics & Electrics)
Transwerk
Bayhead
Durban
e.) Mr J.J. Ackermann
Technical Superintendent
Electrical
Spoornet
Umbilo
Durban
f.) Mr G.J.G.Coetzee
Junior Manager
Electrical Systems
Spoornet
Ermelo
Tel. 017-*******
g.) Ds G. Barnard
Pastor
N.G. Ermelo Oos Cell Church
Ermelo
Tel. 017- 8116066
h.) Dr. Riaan Swart
Theunisenstreet 5
Ermelo
Cell. 082*******
i.) Mr I. Van der Linde
Depot Engineer
Spoornet Infra
Ermelo
Tel. 017-*******
Cell. 083*******
j.) Mr Jesse Hill
Infra Manager
Eastern Region
Tel. 035-
Cell. 083-***-****
k.) Mr Fuzili Maqwa
General Manager
Eastern Region
Empangeni
Tel. 011-
Cel.