Joe T. Scott, Jr.
***** ****** ***** **** 423-***-****
Cleveland, TN 37311 acb8mp@r.postjobfree.com
Objective Seeking position with a team oriented company to utilize my experience and engineering education to
reach overall team goals of company.
Work Experience
Electrical Supervisor April 2011 Present
Lectrus Inc., Chattanooga, TN
• Managed 65 electricians and electrician helpers
• Instrumental in the installation of new LEAN production line which resulted in 20% productivity
increase
• Responsible for electrical completion of all projects on time (maintained 100% on-time completion in
fast pace and dynamic environment)
• Developed productivity tracking sheets to chart monthly and yearly to maintain goal of 95%
productivity for department
• ERP system input (EPICOR), along with payroll system (KRONOS and ULTIPRO)
• Scheduling of electrical resources for projects based on customer priority
• Performance reviews and pay rates for employees within budget
• Time and Attendance tracking and corrective action implementation
• Interviewing, hiring and training of employees
Cold End Maintenance Supervisor August 2009 May 2011
Saint Gobain (Verallia), Ruston, LA
• Manage 29 Electro/Mechanical maintenance Employees
• Scheduling of PM’s for equipment to maintain 95% run-time
• Scheduling of job change crews for production lines. Goal of <3 hours per job change maintained
(included recalibration of inspection equipment and resetting of line speeds for new product)
• Material ordering for capital projects and PM work. Maintain spares for conveyors, palletizers,
VFD’s, box machines, etc.
• Troubleshooting of equipment failures. Included re-timing of box machine equipment, inspection
equipment, PLC’s, hydraulics, pneumatics and electrical circuitry.
• Supervise new project installations. Setting up new equipment.
• Vacation scheduling for employees, time and attendance, interviewing, and payroll utilizing SAP
system.
• Off-shift coverage scheduling
• 24 hour call-in availability
Electrical Shop Supervisor April 2008 February 2009
Corning Inc., Harrodsburg, KY
• Hot end tank rebuild electrical responsibilities including SCRs & VFDs
• Electrical PM assignments for plant(PM completion above 95% goal for plant utilizing TABWARE
CMMS)
• Scheduling training for electricians
• Project drawing reviews
• Electrical single line drawing updates
• Coordination with incoming power utilities company
• Balancing plant substation loads (12.47KV, 2400V, & 480V loads)
• NFPA 70E updates for the plant
• Motor replacement and repair coordination
• Variable Frequency Drive programming and troubleshooting
• Back-up power generator install project >$800,000
• Time and attendance tracking for electricians
• 24 hour call-in availability
Facilities Electrical Engineer June 2000 April 2008
Corning, Inc., Harrodsburg, KY
• NEC and Safety inspections
• Installation of PLC controlled air cannon project for plant abatement system
• Development of emergency power contingency plans
• Electrical design review for projects
• Project creation and scheduling
• Field supervision for electrical projects
• Bid meetings and contract awarding with vendors
• Troubleshooting plant equipment failures (VFD’s, motors, PLCs, fans, etc…)
• Electrical single line drawing updates
Electrical Project Engineer May 1996 March 2000
Air Products & Chemicals, Inc., Calvert City, KY
• Electrical design reviews for projects
• Single line, loop diagram, motor schematics & Process diagram updates
• Project creation, estimate, bid & installation
• Project budget control
• Troubleshooting of electrical & instrument systems
Electrical Designer August 1991 May 1996
Air Products & Chemicals, Inc., Calvert City, KY
Education Murray State University
Bachelor of Science May 1991
Electrical Engineering Technology
Skills NEC 5S DMAIC
NFPA-70E Lean Manufacturing Team Empowerment
Microsoft Word Allen Bradley VFD’s
Microsoft Excel ERP systems