C URR ICU LAM V ITAE
Objective: - Looking for challenging assignment where I can use my skills and
K nowledge gained from study and experience, to help for
opening new vistas for my organization and there by achieve self – growth and
development.
P ERSONAL DETA I L
N ame :- Acharya Dinesh N.
8th September 1979.
Date of Bir th :-
Mari tal Status :- M ar ried.
Permanent Address :- Dinesh N. Acharya
140, Purrushotam Nagar,
B/h- Vaibhav Cinema,
Vadtal Road,
V. V.Nagar-388120
A anand (Guj)
Contact No. :- 987-***-****
E- Mail :- d *****.***********@*****.***
Nationality :- Indian
Religion :- H indu Brhamin
Job Preferred :- Company jobs.
Current salary :- Rs. 20000/- + company perks Per Month.
Reference :- Available as on requirement.
Hobby :- C ricket, Computer, Reading, Music, Movies.
P ROF I L E : 1. Self –Motivated and Responsible.
Page 1 of 4
2. Exceptionally creative with detailed oriented.
3. Highly t rustworthily, discreet and ethical.
ED UCAT ION QUAL I F ICAT ION :
D iploma in Electrical Engineer from Govt. Poly. Tech. Valsad with 62.39%
1.
(2003).
2. E lectrical Service Technician From Dakor ( Anand )T. E. B with 72.71%
(1999).
3. E lectrical Install. Wir ring Jointing Esatimat. & cost. From V V Nagar T. E.
B . with 56.58% (1996)
4. S. S. C from Anand H igh school, Anand G. S. E. B with 52.71% (1995).
PROJECT DONE D UR I NG ED UCAT ION :
1. Verstile zener diode tester. (major project)
2. Smoke alarm. (minor project)
WORK EXPER I N ECE :
1. April -2003 to September – 2004 “ Akshar Fire And Safety, Ahmedabad’’. As
M arketing Executive.
Job P rofile:
Knowledge of sprinkler system.
Managing of Man power.
Marketing and demonstration of Fire and safety related Equipment.
September – 2004 to September – 2005 ”Borsad (T) s/dn. MGVCL, Anand” As
2.
A pp. Jr. Engr.
Job P rofile:
Page 2 of 4
1 – P hase & 3 - phase Service line Maintenance and Meter replacement.
Monthly Inspection report and other detail submission.
New connection and line Surveying, drawing, Estimation, Costing .
HT and LT line Maintenance, Installation Repairing.
Checking of Electrical System’s meter, line and M R - C R, managing man power
3. September – 2005 to April – 2007 “132 KV Substation, Vallbhipur” As a
Cont. P.O. – 1
Job P rofile:
T he 11 KV – 132 KV power supply, Control Panel, Transformer yard’s
Observation,
M aintenance Work of Isolater, Circuit Breaker, Relay testing, Panelwork, D C
B attery
M aintenance, Meter replacement & M IS work, managing man power
4. October – 2007 to August – 2013 In Aquagel chemicals (Bhavnagar ) Pvt. L td.
As an
E lectrical Engineer.
Job P rofile :
Repairing & Installation of 3 phase &1 phase Motor, Wiring, Cabling, Earthing,
Ruoting maintenance of electrical equipment & system, Installation, Repairing of
various Drive.
Managing the manpower.
Plant Maintenances of all Motor, MCC & PCC Panel, and VFD panel
Parameter setting of VFD and fault finding Maintain store by putting MRS
(Material Requisition Slip.) ...
P roject H andled:
Page 3 of 4
A) A Coal Fire Hot Air Genrator new project is electrically & Mechanically
completed
S tarted in 2009.
B ) A Melter new project is also completed in 2010.
Note: - I am waiting for positive reply from your side as early as possible.
Your’s
T rully,
( M r. D. N.
Acharya )
Page 4 of 4