Post Job Free
Sign in

Electrical Engineer Project

Location:
Mumbai, MH, India
Salary:
3.6 to4.0
Posted:
January 09, 2014

Contact this candidate

Resume:

C URR ICU LAM V ITAE

Objective: - Looking for challenging assignment where I can use my skills and

K nowledge gained from study and experience, to help for

opening new vistas for my organization and there by achieve self – growth and

development.

P ERSONAL DETA I L

N ame :- Acharya Dinesh N.

8th September 1979.

Date of Bir th :-

Mari tal Status :- M ar ried.

Permanent Address :- Dinesh N. Acharya

140, Purrushotam Nagar,

B/h- Vaibhav Cinema,

Vadtal Road,

V. V.Nagar-388120

A anand (Guj)

Contact No. :- 987-***-****

E- Mail :- d *****.***********@*****.***

Nationality :- Indian

Religion :- H indu Brhamin

Job Preferred :- Company jobs.

Current salary :- Rs. 20000/- + company perks Per Month.

Reference :- Available as on requirement.

Hobby :- C ricket, Computer, Reading, Music, Movies.

P ROF I L E : 1. Self –Motivated and Responsible.

Page 1 of 4

2. Exceptionally creative with detailed oriented.

3. Highly t rustworthily, discreet and ethical.

ED UCAT ION QUAL I F ICAT ION :

D iploma in Electrical Engineer from Govt. Poly. Tech. Valsad with 62.39%

1.

(2003).

2. E lectrical Service Technician From Dakor ( Anand )T. E. B with 72.71%

(1999).

3. E lectrical Install. Wir ring Jointing Esatimat. & cost. From V V Nagar T. E.

B . with 56.58% (1996)

4. S. S. C from Anand H igh school, Anand G. S. E. B with 52.71% (1995).

PROJECT DONE D UR I NG ED UCAT ION :

1. Verstile zener diode tester. (major project)

2. Smoke alarm. (minor project)

WORK EXPER I N ECE :

1. April -2003 to September – 2004 “ Akshar Fire And Safety, Ahmedabad’’. As

M arketing Executive.

Job P rofile:

Knowledge of sprinkler system.

Managing of Man power.

Marketing and demonstration of Fire and safety related Equipment.

September – 2004 to September – 2005 ”Borsad (T) s/dn. MGVCL, Anand” As

2.

A pp. Jr. Engr.

Job P rofile:

Page 2 of 4

1 – P hase & 3 - phase Service line Maintenance and Meter replacement.

Monthly Inspection report and other detail submission.

New connection and line Surveying, drawing, Estimation, Costing .

HT and LT line Maintenance, Installation Repairing.

Checking of Electrical System’s meter, line and M R - C R, managing man power

3. September – 2005 to April – 2007 “132 KV Substation, Vallbhipur” As a

Cont. P.O. – 1

Job P rofile:

T he 11 KV – 132 KV power supply, Control Panel, Transformer yard’s

Observation,

M aintenance Work of Isolater, Circuit Breaker, Relay testing, Panelwork, D C

B attery

M aintenance, Meter replacement & M IS work, managing man power

4. October – 2007 to August – 2013 In Aquagel chemicals (Bhavnagar ) Pvt. L td.

As an

E lectrical Engineer.

Job P rofile :

Repairing & Installation of 3 phase &1 phase Motor, Wiring, Cabling, Earthing,

Ruoting maintenance of electrical equipment & system, Installation, Repairing of

various Drive.

Managing the manpower.

Plant Maintenances of all Motor, MCC & PCC Panel, and VFD panel

Parameter setting of VFD and fault finding Maintain store by putting MRS

(Material Requisition Slip.) ...

P roject H andled:

Page 3 of 4

A) A Coal Fire Hot Air Genrator new project is electrically & Mechanically

completed

S tarted in 2009.

B ) A Melter new project is also completed in 2010.

Note: - I am waiting for positive reply from your side as early as possible.

Your’s

T rully,

( M r. D. N.

Acharya )

Page 4 of 4



Contact this candidate