Post Job Free
Sign in

Project Construction

Location:
Maple, ON, Canada
Posted:
January 09, 2014

Contact this candidate

Resume:

Ahmad Pasha-Haji Safar Tehrani

****, ********* *’Acadie, Montreal, QC, H3N 2W1

Phone: 514-***-****

Email:**********@*****.***

OBJECTIVE:

Ability and desire to work as Expediting coordinator/Senior Expeditor with more than 11 years of experience in

the field of oil and gas projects, process plants, petroleum and gas refineries.

SUMMARY:

Worked for EPCM contractors and engineering companies

Knowledge of engineering standards such as ASTM, AWS, ASME and API

Knowledge of material basis such as metallic or non metallic as theoretically and experimentally

Knowledge of material selection/protection philosophy against corrosion

Involved in construction management team for EP and EPCM based projects.

Experienced in the management or supervision of personnel, including defining tasks, developing work

assignments, and evaluating performance.

Strong management and coordination skills

Organized and team oriented professional

Proficiencies and Responsibilities:

Timeliness, accuracy and adequacy of expediting coordination responsibilities.

Fulfilment of expediting requirements during project execution

Plan and coordinate expediting requirements for projects including specific needs and

expediting direction

Reviewing Purchase Order (PO) scopes

Chair kick-off meetings with all parties once P.O. has been awarded (common

u nderstanding)

Expedite and Monitor Materials and Services requested, consistently, adequately and

accurately

Preparing a detailed expediting scope based on Project Procurement Plan

The Review of Material Requisitions and definition of specific quality requirements and

supplier data submission requirements

Monitor supplier activities during the manufacture and shipment of products

Assist in problem resolution relating to engineering, materials, manufacture, or testing

p roblems with both supplier and sub suppliers. Take proactive role in identifying

possible problems

Coordinate with document control the obtaining and returning of vendor drawings/doc's

Expedite exchange of drawings, doc's, and schedules between home office and suppliers

Perform as liaison between Project Engineers and Vendors on delivery

Execute and assist with Materials Management

Update project team regarding equipment/material delays and follow up on supplier’s

p lan to restore schedule

Ensure Expediting Procedures are carried out as per Client requirements

Issuing of Project Expediting Reports

Ini tiate corrective action, as required, to assure delivery performance

Evaluating the claims raised by the contractors/manufacturers

Maintain effective relationships with suppliers, management, customers, support

organizations and project team

Perform delegated tasks as required

Page 1 of 2

Support continuous improvement initiatives

WORK HISTORY:

2008 – 2013

Energy Industries Engineering and Design (EIED)

Title of Position: Expediting Coordinator

Worked for “South Pars Gas Field Development Projects, Phases 20 & 21”E&PS Project for the production of a

2000 MCFD, grass root gas refinery plant

Worked for “Tabriz refinery gasoline production plant”,EPC project for the construction of a new 30K

barrel/day gasoline production plan in the existing refinery

Worked for “Hormuz Heavy Oil Refinery Project plant”, E&PS project for the construction of a new 100K

barrel/day heavy oil utility & offsite facilities (Unit Area, Flare Area, and Sea Water Intake ).

Worked for “Construction of Bandar Imam 2nd Liquids Jetty”, MC project for construction all utility and

loading arms& metering system area for exportation of Bandar Imam special economical petrochemical zone

2001 –2008

Nargan Engineers & Constructors (www.nargan.com)

Title of Position: Procurement Specialist & Expeditor

Worked for “Low Density Poly Ethylene/LDPE” EPC Project for the construction of a new

300 K/year LDPE in the Arya Sasol Petrochemical Co.(J.V Technip France)

Worked for “10TH Olefin Ethylene Plant” EPC Project for the construction of new 1200 K/year

Olefin Ethylene in Jam Petrochemical Co. J.V Technip France)

Worked for “Crystal Melamine Plant” EP project for the construction of a new 10 K/year CM in the

Khorasan Petrochemical Co.(J.V Eurotecnica Italy)

EDUCATION AND TRAINING COURSE:

September 1996 - September 2000

B.Sc. in Material Engineering-Industrial Metallurgy

Sahand University of Technology/Iran

Material selection philosophy by Iranian Corrosion Association

Proficient in the use of MS office 2007

References: Available upon request.

Page 2 of 2



Contact this candidate