PROFESSIONAL RESUME
PERSONAL DATA
Name: POMPILIU TARAS
Address: Bucharest/Romania
Phone: 004-***-***-** 57
Mobile: 004-****-**-** 67
E-mail: ********.*****@*****.***
**************@*****.***
EDUCATION
Polytechnic University - Diploma of Electrical Engineer -five years of full-
time study.
1 Industrial High School, Bucharest - Awarded Diploma of Baccalaureate
profile Electro-Energetic
Atlas Interactive Limited Offshore-Permit to Work-Level 2
Certificate,February 2010
GASCO Permit To Work,National Training Centre Abu Dhabi-L.L.C.-Jan.2009
AGIP KCO Permit to work Training Workshop, Caspian Technical Resources
Craft Training Center-Kazakhstan, Nov.2006
Marketing and Negotiated Techniques, Romania, 2003
Reliability and Maintenance in Quality Assurance System, Romania, 1998
The Instrumentation Training Course, Danfoss, Denmark, 1997
Compensation of reactive energy with automatic capacitor bank, Frako,
Germany, 1996
Evaluation of Industrial Companies, Romania, 1995
Risk Assessment in Industrial Activities, University of Pisa, Italy, 1995
Management in Research and Development Activities, Romania, 1994
Member of New York Academy of Sciences,
Selected as a Potentially Qualified Candidate for Inclusion in the 1998
Edition of International Who's Who
Senior Researcher
PERSONAL SKILLS:
Self-starter, motivated, professional
Good communication skills
Problems-solver
A keen ability to obtaining hard to get information
High moral standards and business ethics
Receptive and responsive to team work
Adapting rapidly to changes in environment, places, people
Supervisory and consulting potential
Good technical knowledge and skills.
TECHNICAL SKILLS:
PMC, Consulting, Conceptual Design, Inspection, Construction, Pre -
Commissioning, Commissioning, Start-up and Operation for HV/LV Electrical
Installations and Power Plant include Gas Power Plant.
Repair, Maintenance and Troubleshooting
Project Coordinator
QA/QC Inspection Activity.
Testing of Electrical Equipment.
Methodology and Procedures for Testing of Electric Equipment including for
Nuclear Power Plant (NPP)
LANGUAGES: English: good level
COMPUTER SCIENCE: MS Word, MS Excel, Internet Explorer
SIGNIFICANT EXPERIENCE
Sept.2011- 2013-TECHNIP Italy
Electrical Consultant-PMC-Project
Project: Arjew Refinery Rehabilitation & Adaptation Project -ARJEW-ALGERIA
Activity:
Responsible for developing and implementing of electrical part project
strategy and provide technical assistance to Client.
Performed technical reviews, checked and approval of design/engineering
documentation.
Focal point of project execution including screening and evaluation of
proposals, monitor progress of work and tracks implementation schedule.
Advise project management for any implementation and construction issues.
Monitor the activities of the EPC contractor; ensure that the approved
designs are followed during construction, monitor progress at site.
Provided technical assistance for electrical protection calibration,
energization and start up
Verified and approved site modifications according to FEED documentation
and technical standards
Recommended the development and implementation of the project procedures to
verify the electrical readiness for energization and to energize the system
Provided technical support to EPC contractors in major technical problems
in construction, commissioning & start up activity.
Inspection of contactors works, give technical solutions and prepares
technical reports
Guided and advising other members of PMT electrical engineering team
July -Nov.2010-CEGELEC FRANCE
Senior Electrical Engineer
Project: Revamping of Electrical System in Arjew Refinery -ARJEW-ALGERIA
Activity:
Final construction,Pre-commissioning and commissioning of electrical
installations:(Electrical
Substations,Switcgboard,MCC,Transformers,Motors,UPS,PMS,IPCS,CP,Ligting
System a.s.o.
Prepared all commissioning documents (procedures, test report etc)
Coordinated and supervised vendor activity.
January 2010-June 2010-TECHNIP FRANCE
Lead Electrical Commissioning Engineer
Project: Offshore Associated Gases Project-DAS ISLAND-UAE
Activity:
Coordinated actvity for final construction, mechanical completion, pre-
commissioning and commissioning of electrical installations:Electrical
Substations,Switcgboard,MCC,Transformers,Motors,UPS,PMS,VSD,IPCS, Cathodic
Protection, a.s.o.)
Verify all commissioning documents (procedures,test report etc)
Coordinated vendor activity.
July 2007- 2009-FLUOR CORPORATION LTD.
Lead Electrical Commissioning Engineer
Project: Habshan Gas Complex Expansion Project- UAE
Activity:
Creates Receives allocated duties and views enquiry documentation from
client together with Scope of Work to understand what is required. Raises
queries where there is lack of clarity, Interfaces with other disciplines
to ensure integration of activities
drawings and document register to ensure all deliverables are accountable,
and completed on time.
Monitor Contractor's and vendors' quality control effort
Coordinates the electrical engineering aspects of the project to ensure the
technical objectives are met within the approved scope, budget and schedule
Provide technical support and advice to project procurement and
construction activities.
Receives "as built" information from the Project Management Team, reviews
content and, if satisfied, passes to drafting for production of drawings.
Support the other PMT engineering disciplines and construction,
commissioning and operations teams
Drawing up the methodology and commissioning & maintenance procedures for
electrical substations and equipments.
Elaboration of safety management of energised substations procedures &
implementation of LOTO System.
Coordinated activity for final construction, mechanical completion,
commissioning & start up of HV/LV electrical installations: Electrical
Substations, Switchgears, MCC, Transformers, LMS(Load Management System),
IPCS(Integrated & Protection Control System), UPS,Variable Speed Drive
System (ABB),Catholic Protection, Motor Managers MM3(S&I),MULTILIN Relays
SR 469,745,750/760,MICOM Relays a.s.o.
April 2007-June 2007- GENERAL ELECTRIC Intl.
Senior Electrical Commissioning & Start-up Engineer
Project: RAB2 Power & Water Plant -Ras Abu Fontas/Qatar
Activity:
Commissioning & start up for LV/HV electrical installations-
Transfomers,Substations,UPS,Switchgears,MCC,Electrial
Cables.Motors,VSDS,CP,a.s.o.
September 2006-March 2007- AGIP KCO
Electrical Superintendent-PMC-Project
Project: Kashagan Development Experimental Program-Eskene West Onshore
Processing Facility/Kazakhstan
Activity:
Controlling schedule and budget for assigned tasks
Follow up the execution of project in accordance with the Discipline Design
Instructions,Project Procedures on Safety and Quality Control.
Design reviews and design review preparation
Provide assistance and support for construction,pre-
commissioning,commissioning and start-up for LV and HV electrical
installations as: Substations, Transformers, Switchgears, Electric Cables,
Motors, MCC,Power Centers, LMS (Load Management System),DMS (Distribution
Management System),IPCD (Integrated Protection and Control Device),Diesel
Generators,UPS,Electrical Super Heater,Earthing System,Cathodic
Protection,Trace Heating,Lighting System,Lightning Protection,
Supervised and controll the EPC CONTRACTOR's activities regarding
engineering,procurement and construction, verify and checking all the
documentation (technical specifications,drawings,procedures)
Organized, participate and coordinated all necesary technical meetings to
implemetnt the performance of the work.
Interfacing with all EPC Contractor departments on technical,contractual
and procedural issues in order to settle in useful time the critical
problems.
Well-known of local standards (PUE,SNiP)
2004- August 2006 - TECHNIP ITALY S.P.a
2 Senior Electrical Supervisor-Team Leader
4 Project: Unleaded Gasoline/Low Sulphur Gas Oil Project - Abu Dhabi Oil
Refining Company UAE.
Activity:
Reviews and monitors project electrical engineering deliverables, vendor
data and design changes.
Developing and implementing the EPC Contractors technical documentation
for pre-commissioning,commissioning and start-up.
Precommissioning, Commissioning and Start-up activity for HV( high
voltage), and LV ( low voltage) electrical installations as: Substations,
Transformers, Switchgears, Electric Cables, Motors, MCC, Power Centers,
VSD(LOHER),UPS(GUTOR),Capacitor Bank(ABB),SCADA System,Electrical Heaters
(CHEMTEC.B.V.),Cathodic Protection, protection relays as: Motor Managers
MM5(S&I),MULTILIN Relay SR 269,469,489,745,750/760 (ABB).
Training his Engineering Team regarding the testing of equipment and
acceptance criteria.
1 2003-2004- GENERAL ELECTRIC - NUOVO PIGNONE
2 Electrical Supervisor
Project: Gas Turbine Generator-Western Libya Gas Project-WAFA DESERT- North
Africa -Libya
Activity:
Supervised teams of electrical specialists for construction of GTG (Gas
Turbine Generator) equipment.
Oversees the installation, maintenance, and repair of electrical equipment
and wiring systems
Locating and repairing defects in electrical systems
Perform a broad range of supervisory responsibilities over others.
1 Project: Kwale Gas Injection Upgrading Project -OBI-OBI, Nigeria
Activity:
Electrical commissioning and start-up activity for Gas Turbine Generators,
Low, Medium and High Pressure Compressors: Generator Control and Protection
Panel, Excitation Panel, MCC, Rectifiers, Inverters, Motors.
2 2002- 2003 -GENERAL ELECTRIC MATERIALS
Senior Electrical Engineer
Activity:
Received allocated duties and views enquiry documentation from client
together with Scope of Work, interfaces with other disciplines.
Undertakes technical evaluation of vendor offers to ensure that technical
details are satisfied..
Asses progress and procedure associated reports and propose plans to
recover slippage and correct inefficiency.
Received "as built" information, checked and reviews content
.
2001 - 2002- TECHINT CIMIMONTUBI -ITALY
3 Electrical Supervisor
Project:
Nigeria Liquefaction Natural Gases Expansion Project, BONNY ISLAND-NIGERIA
Activity:
Supervised the construction of electrical installations: Catholic
Protection, Electrical Substations, Earthing Systems.
Planned, scheduled, assigned and supervised the work of teams engaged in
the installation of electrical systems and equipment.
Developed and maintained safe work practices and enforces strict
conformance to safety regulations..
Provide to Site Manager daily report as concerns the working progress and
proposed actions to implement the performance of the work.
1996 - 2001- TOFAN GROUP, DANUBIANA S.A.
6 Head of Electrical Department-Project Manager
Main Projects:
Rewamping of Electrical Substations-Install H2S Switchgears (ABB-Type)
Implementation of Frequency Conveters for Pumping Systems (SIEMENS-Type)
Compensation of Reactive Power with Automatic Capacitor Bank (FRAKO-
Germany)
Information Management System (FRAKO-Germany)
Activity:
Conceptual Design,Supervised, construction, pre-commissioning tests and
commissioninig,repair and maintenance for wide variety of equipment :
Electric Motors, Generators, Motor Control Centers, Pumping
Stations,Compressor Stations,UPS,Frequency Converters,etc)
Scheduled maintenance inspections for a wide variety of electrical
equipment.
Coordinated and assisted in development and completion of all electrical
QA/QC acceptance forms.
Verified the development and completion of all electrical specific forms
and electrical testing before energizing the systems.
Coordinating of trouble tracking and start up activity before energizing.
1992 -1996- EUROTEST S.A
7 Scientific Manager
Activity:
Management of R&D activity in field of equipment qualification, namely:
assessment of the capability's equipment to operate in specific conditions
(Thermal and Operational Aging, Radiation Vibration, Earthquake and Nuclear
Accident) for Nuclear Power Plant.
Organization and coordination of QA/QC activity.
Coordination of activity to elaborate of new methodologies for
qualification of electrical equipment
1 1985 -1992- ELECTROTECHNICAL RESEARCH INSTITUTE, Bucharest
8 Head of Research and Qualification Department for Equipment of NPP
(Senior Researcher)
Activity:
Research in field of Qualification of Safety Related Equipment for NPP.
Elaborated of new methodologies and procedures for testing of equipment for
Cernavod? NPP according to international standards (IEEE, IEC, ASTM a.s.o.)
before installing and commissioning
Performed of specific tests for Electrical, Electronic and Automation
Equipment as: thermal aging, radiation aging, vibration and seismic testing
and LOCA test (Loss of Coolant Accident).
1977 - 1985- DANUBIANA
1 Head of relays protection department
Activity:
Testing of electric equipment (Electric Motors, Generators, Transformers,
Electric Cables, a.s.o.) as part of maintenance programs.
Pre-commissioning tests for electrical equipment and drawing up the
acceptance forms.