THOMAS S. EARLEY
** ******* **** ********, ***** 77905
acao84@r.postjobfree.com
OBJECTIVE
Dedicated, punctual, and diplomatic professional with over 25 years experience
as an Instrumentation, Electrical and Control (IE&C) Designer, Journeyman
Electrician, and Instrumentation and Electrical Technician, I&E Estimator,
Project Manager and small business owner, seeks a leadership position as an I
& E Electrical Technician or Designer, Estimator, Inspector, or Project
Manager in the power generation, utility, Oil & Gas or related industry.
SKILLS
Skills applied at such companies as Testengeer Engineering, ISC (Dow Seadrift
plant), Alcoa, KGS, Lone Star and Zachry include installation, repair,
maintenance and design of electronic instrumentation and related
electromechanical or electro-hydraulic apparatus; operational and
environmental testing of mechanical, structural, and electrical equipment;
Licensed Journeyman Electrician, member of the Instrumentation, Systems, and
Automation Society (ISA), has a Certification in Specialized Technology, and
is proficient in Excel and Word, Microsoft A+ and Network+, NEC Code, AutoCad,
MicroStation, and PLC Programming.
EXPERIENCE
Testengeer Engineering, Port Lavaca, Texas Jan 2010 to Oct 2013
Allen-Bradley PLC Programmer, HP-II Unit, Seadrift, Texas
Lead Electrical/Instrument Designer/I & E Desigener/Journeyman Electrician
Designed Electrical and Instrumentation projects producing engineering
packages which included: Project Scope Documents, All Instrument/Electrical
related drawings, Bill of Material, Instrument/Electrical Specs, P&ID's, and
Field Instructions when needed.
Some project types included Substation expansion, low and medium voltage
drawings, added motor starters, analyzers, panels, upgrade to wireless or
radar transmitters, and expansion of the electrical system and related
panels.
Drafted elevation drawings, single lines, motor schematics; plan drawings
included loop drawings, details, junction box, lighting panel, and conduit and
cable schedules for several Chemical Plant and Oil & Gas Projects.
Organize, scan, and index drawings and documents from plant in INTools.
Follow-up and red lines from in-house and outside vendor projects.
Required the use of Auto CAD r2006, Raster design, Microstation and Microsoft
office programs.
ISC Industrial Specialties Contractors 2008 to 2010
Sr. Electrical Estimator/ I & E Tech/Project Manager
Supervised and Trained Electricians, Performed Circuit Layouts, Switchgear
Installations, Trenching, and Slab rough-in for large Commercial projects for
Schools, Prisons, and Large Retail Outlets, Oil Field Pump Stations and
Industrial projects. Performed industrial service work for large and small
facilities and Pipeline projects with tasks consisting of installing conduit
to 4"), cable terminations and megging(up to 1000mcm), motor starters(MCC),
VFDs, and Cable Tray installations.
Conducted installation/calibration of pressure transmitters, transducers, flow
meters, ultrasonic sensors, proportional-integral-derivative (PID)
controllers, and recording(gauging), instruments.
Performed installation, diagnostics and repair on Programmable Logic
Controllers (PLC), Variable Frequency Drives (VFD), Motor Operated
Valves(MOV), Generators(GENSET), Ethernet and DataComm systems, and AC and DC
motors.
Installed Communication systems, UPS Back-up for PLC's, performed point to
point and tested SCADA systems.
Alcoa International Port Lavaca, Texas 2004 to 2008
High voltage Electrician, I & E Technician
Performed PM on all plant electrical systems.
Performed such production plant duties as PLC programming with Allen Bradley
500 and 5000 Logix controllers, commissioning equipment, relaying logic,
trouble shooting, and VFD troubleshooting.
Trained operators on new operations and equipment, coordinated equipment
installations, purchases, maintenance, and repair with other departments and
vendors, and conducted field service technical support.
Daily tasks included maintaining 25kv substation, main 480v substation, MCC's.
Installed and maintained lighting, grounding, power, building, cable tray,
underground, instruments.
Lone Star Electrical Contractors Jun 1999 thru Oct 2004
Magellan/Holt Cat Heavy Industry/Copano/Meridian/Kinder Morgan
Owner/Partner
Supervise projects for Mid-size electrical contracting business.
Estimate, and Manage all Projects for the company and supervise office
personnel.
Plan, organize, schedule, and coordinate operations.
Train electricians with latest version of NEC and NFPE 70E.
Accountability for Profit and Loss of company was my responsibility.
Required the use of Auto CAD and Microsoft office programs be used daily.
Maintained AP, AR, Payroll and Inventory using Quickbooks.
Zachry Construction Company Apr 1994 thru Aug 1999
JEA Jacksonville Electric Authority Jacksonville, Florida
Electrical General Foreman/Journeyman Electrician/Instrument Tech
Maintain schedule and continuity between clients and contractor crews during
new construction, start-ups, and shutdowns.
Interview electricians for maintenance and construction positions.
Initiate schedule, safety, and work flow for 5 electrical crews.
As foreman I initiated drawing changes for easier access and cost savings with
approval of supervisors and client.
Write procedures for racking in/out medium and low voltage breakers for
electricians and operations personnel.
Electrician responsible for PM, emergency work orders, and general plant
maintenance.
Instrument Tech responsible for Allen Bradley and Foxboro PLC's, rebuild
MOV's, install tubing, and various Level Switches, Temperature and Pressure
Transmitters, and Flow meters.
EDUCATION
OQ Certified Oil Field and Pipeline, Sinton, Texas, 2013
NCCER Certified, Industrial Electrician I,II,III,IV, Victoria, Texas,
2010-2011
National Fire Protection Agency 70E Training, Dow, Seadrift 2011
OSHA 10 and OSHA 30 certified, Houston, Texas 2010
AutoCAD 11 thru 2008. DOS, Windows, Word, Excel, Access, Cad Overlay, Raster
Cad Microstation SE, and J Board Drafting, X-Ref, Paper Space/Model Space,
Rasta and IRASB PDS 3D Modeling, OrthoGen, Smart Plant Review.
First Aid, CPR, HAZMAT Training, Port Lavaca, 2009
Modicon PLC Programming, The City of Dallas, Dallas, Texas 2005
Introduction to I&C, National Technology Transfer, Inc., Dallas, Texas 2005
Microsoft A+, Microsoft Network+, National Electrical Code Training, and
Conflict Management Training, 2004-2006
Estimating and Management Training, Mike Holt Enterprises, Inc; Dallas, Texas,
2005
Electrical Journeyman License, State of Texas, 2004-Present
Certification in Specialized Technology, Maintenance Electricity &
Construction Technology, 1998-2002
High School Diploma, Orange Park High School, Orange Park, Florida, 1987
RECENT COMPLETED PROJECTS
Dow Seadrift HP-2 Modernization Project Phase 1 and 11
Dow Seadrift LP-1 Modernization Project Phase 1 and 11
Dow Seadrift Flare Replacement
Dow Seadrift HP-2 Control Room Remodel
Dow Seadrift HP-2 Hot Product Control Room Upgrade
Dow Seadrift HP-2 Hot Product Loading Dock Upgrade
Dow Seadrift Lab Roof Replacement
Kinder Morgan Three Rivers Crude Storage Facility
Kinder Morgan Three Rivers Lact Unit Installation
Kinder Morgan Three Rivers CDP Commissioning and Start-Up
Copano/Regency Refinery Upgrade
Copano CDP Three Rivers
Copano CDP Skidmore
Copano CDP Portside
Copano CDP Beeville
Energy Transfer Corp.(ETC) Kenedy Lact Unit Installation
ETC Pump Station Installation
ETC CDP East Kenedy, Texas
ETC CDP West Kenedy
ETC CDP Kenedy Main
ETC CDP Kenedy North
Plains Catulla Flare Upgrade
Plains Caterina Pump Station Upgrade
Plains Caterina Generator Installation
Plains 300 HP Motor Replacement Kingsville
Magellan Chorpus Christie Crude Storage Facility Installation(Underground)
Magellan Chorpus Christie Crude Storage Facility Installation(MCC
Installation)
Magellan Chorpus Christie Crude Storage Facility Installation(PLC
Installation)
Magellan Chorpus Christie Crude Storage Facility
Installation(Communications/UPS)
Magellan Chorpus Christie Crude Storage Facility Installation(Start-Up)
Magellan Cartman Pump Station Installation(Underground)
Magellan Cartman Pump Station Installation(MCC Installation)
Magellan Cartman Pump Station Installation(PLC Installation)
Magellan Cartman Pump Station Installation(Communications/UPS)
Magellan Cartman Pump Station Installation(Start-Up)
Magellan Barnhart Pump Station Installation(Underground)
Magellan Barnhart Pump Station Installation(MCC Installation)
Magellan Barnhart Pump Station Installation(PLC Installation)
Magellan Barnhart Pump Station Installation(Communications/UPS)
Magellan Barnhart Pump Station Installation(Start-Up)
Trifigura Lact Unit
Trifigura MCC and PLC Installation
REFERENCES
Lance Gibson
Meridian Building Group-Rockwall, Tx
President
Richie Logan
Cornerstone School - Allen, Tx
Owner
Doug Tise
Alcoa World Alumina-Point Comfort, Tx
Production Manager
Chris Faidley
Patriot Trucking Systems-Louise, Tx
Manager