Post Job Free

Resume

Sign in

Project Manager Electrical

Location:
Marble Falls, TX
Posted:
November 04, 2013

Contact this candidate

Resume:

THOMAS S. EARLEY

** ******* **** ********, ***** 77905

acao84@r.postjobfree.com

361-***-****

OBJECTIVE

Dedicated, punctual, and diplomatic professional with over 25 years experience

as an Instrumentation, Electrical and Control (IE&C) Designer, Journeyman

Electrician, and Instrumentation and Electrical Technician, I&E Estimator,

Project Manager and small business owner, seeks a leadership position as an I

& E Electrical Technician or Designer, Estimator, Inspector, or Project

Manager in the power generation, utility, Oil & Gas or related industry.

SKILLS

Skills applied at such companies as Testengeer Engineering, ISC (Dow Seadrift

plant), Alcoa, KGS, Lone Star and Zachry include installation, repair,

maintenance and design of electronic instrumentation and related

electromechanical or electro-hydraulic apparatus; operational and

environmental testing of mechanical, structural, and electrical equipment;

Licensed Journeyman Electrician, member of the Instrumentation, Systems, and

Automation Society (ISA), has a Certification in Specialized Technology, and

is proficient in Excel and Word, Microsoft A+ and Network+, NEC Code, AutoCad,

MicroStation, and PLC Programming.

EXPERIENCE

Testengeer Engineering, Port Lavaca, Texas Jan 2010 to Oct 2013

Allen-Bradley PLC Programmer, HP-II Unit, Seadrift, Texas

Lead Electrical/Instrument Designer/I & E Desigener/Journeyman Electrician

Designed Electrical and Instrumentation projects producing engineering

packages which included: Project Scope Documents, All Instrument/Electrical

related drawings, Bill of Material, Instrument/Electrical Specs, P&ID's, and

Field Instructions when needed.

Some project types included Substation expansion, low and medium voltage

drawings, added motor starters, analyzers, panels, upgrade to wireless or

radar transmitters, and expansion of the electrical system and related

panels.

Drafted elevation drawings, single lines, motor schematics; plan drawings

included loop drawings, details, junction box, lighting panel, and conduit and

cable schedules for several Chemical Plant and Oil & Gas Projects.

Organize, scan, and index drawings and documents from plant in INTools.

Follow-up and red lines from in-house and outside vendor projects.

Required the use of Auto CAD r2006, Raster design, Microstation and Microsoft

office programs.

ISC Industrial Specialties Contractors 2008 to 2010

Sr. Electrical Estimator/ I & E Tech/Project Manager

Supervised and Trained Electricians, Performed Circuit Layouts, Switchgear

Installations, Trenching, and Slab rough-in for large Commercial projects for

Schools, Prisons, and Large Retail Outlets, Oil Field Pump Stations and

Industrial projects. Performed industrial service work for large and small

facilities and Pipeline projects with tasks consisting of installing conduit

to 4"), cable terminations and megging(up to 1000mcm), motor starters(MCC),

VFDs, and Cable Tray installations.

Conducted installation/calibration of pressure transmitters, transducers, flow

meters, ultrasonic sensors, proportional-integral-derivative (PID)

controllers, and recording(gauging), instruments.

Performed installation, diagnostics and repair on Programmable Logic

Controllers (PLC), Variable Frequency Drives (VFD), Motor Operated

Valves(MOV), Generators(GENSET), Ethernet and DataComm systems, and AC and DC

motors.

Installed Communication systems, UPS Back-up for PLC's, performed point to

point and tested SCADA systems.

Alcoa International Port Lavaca, Texas 2004 to 2008

High voltage Electrician, I & E Technician

Performed PM on all plant electrical systems.

Performed such production plant duties as PLC programming with Allen Bradley

500 and 5000 Logix controllers, commissioning equipment, relaying logic,

trouble shooting, and VFD troubleshooting.

Trained operators on new operations and equipment, coordinated equipment

installations, purchases, maintenance, and repair with other departments and

vendors, and conducted field service technical support.

Daily tasks included maintaining 25kv substation, main 480v substation, MCC's.

Installed and maintained lighting, grounding, power, building, cable tray,

underground, instruments.

Lone Star Electrical Contractors Jun 1999 thru Oct 2004

Magellan/Holt Cat Heavy Industry/Copano/Meridian/Kinder Morgan

Owner/Partner

Supervise projects for Mid-size electrical contracting business.

Estimate, and Manage all Projects for the company and supervise office

personnel.

Plan, organize, schedule, and coordinate operations.

Train electricians with latest version of NEC and NFPE 70E.

Accountability for Profit and Loss of company was my responsibility.

Required the use of Auto CAD and Microsoft office programs be used daily.

Maintained AP, AR, Payroll and Inventory using Quickbooks.

Zachry Construction Company Apr 1994 thru Aug 1999

JEA Jacksonville Electric Authority Jacksonville, Florida

Electrical General Foreman/Journeyman Electrician/Instrument Tech

Maintain schedule and continuity between clients and contractor crews during

new construction, start-ups, and shutdowns.

Interview electricians for maintenance and construction positions.

Initiate schedule, safety, and work flow for 5 electrical crews.

As foreman I initiated drawing changes for easier access and cost savings with

approval of supervisors and client.

Write procedures for racking in/out medium and low voltage breakers for

electricians and operations personnel.

Electrician responsible for PM, emergency work orders, and general plant

maintenance.

Instrument Tech responsible for Allen Bradley and Foxboro PLC's, rebuild

MOV's, install tubing, and various Level Switches, Temperature and Pressure

Transmitters, and Flow meters.

EDUCATION

OQ Certified Oil Field and Pipeline, Sinton, Texas, 2013

NCCER Certified, Industrial Electrician I,II,III,IV, Victoria, Texas,

2010-2011

National Fire Protection Agency 70E Training, Dow, Seadrift 2011

OSHA 10 and OSHA 30 certified, Houston, Texas 2010

AutoCAD 11 thru 2008. DOS, Windows, Word, Excel, Access, Cad Overlay, Raster

Cad Microstation SE, and J Board Drafting, X-Ref, Paper Space/Model Space,

Rasta and IRASB PDS 3D Modeling, OrthoGen, Smart Plant Review.

First Aid, CPR, HAZMAT Training, Port Lavaca, 2009

Modicon PLC Programming, The City of Dallas, Dallas, Texas 2005

Introduction to I&C, National Technology Transfer, Inc., Dallas, Texas 2005

Microsoft A+, Microsoft Network+, National Electrical Code Training, and

Conflict Management Training, 2004-2006

Estimating and Management Training, Mike Holt Enterprises, Inc; Dallas, Texas,

2005

Electrical Journeyman License, State of Texas, 2004-Present

Certification in Specialized Technology, Maintenance Electricity &

Construction Technology, 1998-2002

High School Diploma, Orange Park High School, Orange Park, Florida, 1987

RECENT COMPLETED PROJECTS

Dow Seadrift HP-2 Modernization Project Phase 1 and 11

Dow Seadrift LP-1 Modernization Project Phase 1 and 11

Dow Seadrift Flare Replacement

Dow Seadrift HP-2 Control Room Remodel

Dow Seadrift HP-2 Hot Product Control Room Upgrade

Dow Seadrift HP-2 Hot Product Loading Dock Upgrade

Dow Seadrift Lab Roof Replacement

Kinder Morgan Three Rivers Crude Storage Facility

Kinder Morgan Three Rivers Lact Unit Installation

Kinder Morgan Three Rivers CDP Commissioning and Start-Up

Copano/Regency Refinery Upgrade

Copano CDP Three Rivers

Copano CDP Skidmore

Copano CDP Portside

Copano CDP Beeville

Energy Transfer Corp.(ETC) Kenedy Lact Unit Installation

ETC Pump Station Installation

ETC CDP East Kenedy, Texas

ETC CDP West Kenedy

ETC CDP Kenedy Main

ETC CDP Kenedy North

Plains Catulla Flare Upgrade

Plains Caterina Pump Station Upgrade

Plains Caterina Generator Installation

Plains 300 HP Motor Replacement Kingsville

Magellan Chorpus Christie Crude Storage Facility Installation(Underground)

Magellan Chorpus Christie Crude Storage Facility Installation(MCC

Installation)

Magellan Chorpus Christie Crude Storage Facility Installation(PLC

Installation)

Magellan Chorpus Christie Crude Storage Facility

Installation(Communications/UPS)

Magellan Chorpus Christie Crude Storage Facility Installation(Start-Up)

Magellan Cartman Pump Station Installation(Underground)

Magellan Cartman Pump Station Installation(MCC Installation)

Magellan Cartman Pump Station Installation(PLC Installation)

Magellan Cartman Pump Station Installation(Communications/UPS)

Magellan Cartman Pump Station Installation(Start-Up)

Magellan Barnhart Pump Station Installation(Underground)

Magellan Barnhart Pump Station Installation(MCC Installation)

Magellan Barnhart Pump Station Installation(PLC Installation)

Magellan Barnhart Pump Station Installation(Communications/UPS)

Magellan Barnhart Pump Station Installation(Start-Up)

Trifigura Lact Unit

Trifigura MCC and PLC Installation

REFERENCES

Lance Gibson

Meridian Building Group-Rockwall, Tx

President

469-***-****

Richie Logan

Cornerstone School - Allen, Tx

Owner

469-***-****

Doug Tise

Alcoa World Alumina-Point Comfort, Tx

Production Manager

361-***-****

Chris Faidley

Patriot Trucking Systems-Louise, Tx

Manager

979-***-****



Contact this candidate