Post Job Free
Sign in

Electrical Engineer Project Manager

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Posted:
October 31, 2013

Contact this candidate

Resume:

RESUME

MUHAMMAD SAGHEER ANWAR

MOBILE NO: - +971-********* /558183459

EMAIL ID: - ****.********@*****.***

Proposed ELECTRICAL ENGINEER

PERSONAL DETAILS:

NATIONALITY : PAKISTAN

DATE OF BIRTH : April 10, 1986

LANGUAGE : English, Urdu, Punjabi, Hindi,

VISA SATUTS : Work Permit

MARITAL STATUS : Single

P rofessional Career History:

Bachelor of Science in Telecommunication

Professional Qualification :

(Honors), 4-year professional

degree specialized in Electronics &

Telecommunication.

Passing Year

2011

D iploma of Associate Engineer,(DAE)

Academic

3-year diploma in computer Technology.

Qualification

2005

Passing Year

COMPUTER SKILLS : Conversant in Microsoft Office Applications, Auto

CAD, Mat lab, C++

TOTAL EXPERIENCE : 4 Years 2 months

GCC EXPERIENCE : 2 Years 2 months

SUMMARY OF CAPABILITIES:

Page 1 of 5

Having professional experience in MEP engineering and worked with the domain project which

gave me an in depth understanding for handling various domain areas in MEP Engineering. I

have ensured that the project gets implemented as per specification in stipulated time with

quality. I can handle high pressure environments with ease and open mind and also a good team

player. I have efficient communication skill to present my points precisely to listeners.

FUNCTIONAL DOMAIN:

Dedicated to the primary project objectives of project management i.e. timely completion

with emphasis on quality and safety.

Co-ordination with all sub-contractors for their scope of works

Interacting with consultants for material, shop drawing and document approvals

To review the materials against the project specifications and to obtain approval from the

client/consultants.

To co-ordinate with infrastructure contractors and identify the functional requirements.

To liaise with government authorities and to ensure that the mandatory requirements are

met by the project

To prepare method statements for works in order to meet project specification

requirement and to ensure that the same is implemented at site while execution.

Preparation of executive summary report about the project.

ADDITIONAL SKILLS:

Extra low voltage(Fire Alarm, Public Address system, B-LAN, Security System)

Design

WORK EXPERIANCE:

1. M/s THERMO LLC

(Electrical Engineer from OCT 2011 – To till Date)

Project Description:

(From OCT 2011 – till date worked as Site Electrical

Engineer)

1. PROJECT: Shah Gas Development Project Non Processing Building (ABU

DHABI)

Project Value: AED 280 Million

Client Name: ALHOSN GAS

Consultant Name: M/s CH2MHILL VICO ENGINEERING

Main Contractor: ASCON

Responsibilities:

Coordinated with designer and give feed back as per according to the specification.

Ensuring that inspection request are implemented.

Ensuring that all test reports are verified to meet the contract requirement.

Ensuring that all materials delivered to site are inspected and conform to specified

requirements.

Maintain work quality

Follow inspection with Client and get approval at site.

Order material and receive

Execution of works with approved drawings and MS as per specification.

Continuous supervision of Works to obtain Maximum Productivity

Achieving Targets given by the project manager.

Efficient Usage of materials, tools and equipments available

Pre planning of the consequent activities which is to be performed on next day

Fulfill Requirement of safety in works proceeding

Ensuring that inspection request are implemented.

Ensuring that all test reports are verified to meet the contract requirement.

Ensuring that all materials delivered to site are inspected and conform to specified

requirements.

Updated knowledge of industry material specifications and quality codes and

standard.

Coordinated with planning department to get feedback for Progress.

Prepare weekly & Monthly Materials Report to ensure that all works accomplished

complies with the specification requirements and update the minimum test

requirements reflected in the status of test.

Maintained and reviewed all engineering documents in accordance to global

procedures.

Resolved all problems and recommended tests to prevent problems in future.

Ensured that all materials were maintained in accordance to quality requirement of

organization.

Evaluated engineering drawings and ensured that correct materials were used in

activities.

Maintain tracking sheet

Team work

1. M/s HUWAII Technology, Lahore, Pakistan

(Electrical Engineer from JAN 2011 to JUN 2011)

Responsibilities:

Execution of works with approved drawings

Effective Coordination with the Sub contractors

Continuous supervision of Works to obtain Maximum Productivity

Achieving Targets given by the project manager

Efficient Usage of materials, tools and equipments available

Pre planning of the consequent activities which is to be performed on next day

Maintaining quality in the works involved

Requirement of safety in works proceeding

Page 3 of 5

3. M/s GURANT ENGINEER LAHORE PAKISTAN

(QC Electrical Engineer from JUN 2005 - TO DEC 2006)

Responsibilities:

Maintaining various Quality Control Records like SIR and MVR Log..

Inspecting the Site Activities and coordinating with Project Engineer and Project

Manager to attain the satisfactory Productivity.

Governing the various sites as well as laboratory tests to maintain the strict

Quality Control.

Contract Specifications and documents.

Maintaining Quality by the requirements of Local Authorities in a project

Give direct guidance to the Construction manager with regard to daily in-house

inspection.

Ensuring that inspection request are implemented.

Ensuring that all test reports are verified to meet the contract requirement.

Ensuring that all materials delivered to site are inspected and conform to specified

requirements.

Issue and administer NCR & CAR as necessary including follow up.

Maintain all quality records in a retrievable manner.

In-house inspection of all the construction activities on site.

Review the entire request for witnessing for all sub-contractors

P ROFESSIONAL SKILLS:

Good Analytical and Problem Solving Skills

Good Desktop Manager

Good Team Player

Comfortable in a Fast-Paced, Result Oriented Environment

Self Motivated and Well Organized

Good Communication Skills

EXTRA CURRICULAR ACTIVIT I ES AND INTERESTS:

Cricket

Chess

Serve people

REFERENCES:

References will be furnished upon request

Page 5 of 5



Contact this candidate