R.THINAGARAN T.M.G Nagar, Vittalapuram Road
Tindivanam 604001, Villupuram Dist.,
Tamil Nadu, India.
E-mail: ************@*****.***
Mobile: +91 - 887*******
Objective
To obtain a leadership in the Engineering Industry.
Educational Qualification:
1. Diploma in Mechanical Engineering. - April 1996
2. CADD - Nov. 2001 (Mechanical CADD - CADD Centre)
Training:
The central Workshop of Cholan Road Ways Corporation Ltd., Kumbakonam.
Project Work:
Assemble for three-wheeler Body building.
Work Experience:
1) Name of the Employer:
Metco Roof Private Limited
R.S. No. 123/3 THIRUVANDAR KOVIL VILLAGE,
PUDUCHERRY - 605 102.
Profile:
Pre Engineered Buildings
Designation:
Quality Engineer
Period:
November 2011 - Till Date
Nature of Work:
* To ensure RISIPI (Receiving, Inspection, Storage, Issuing, Packing and
Inventory taking) are followed with proper guidelines to improve the
overall efficiency and effectiveness of the warehouse.
* Complying the setup process.
* To maintain and monitor each and every stage.
* Conduction of UT and DPT Test where required.
* To follow the TQM and 5S Procedures.
* Preparation of ISO Documentation.
2) Name of the Employer:
Axis Align India Ltd.,
No.100, Ambattur Industrial Estate,
Chennai - 15
Profile:
Special Purpose Machine Manufacturing.
Designation:
Production Engineer
Period:
August 2008 - October 2011
Nature of Work:
* Handling all type of CNC & Conventional machines.
* Troubleshooting and analyze machine failure mechanism.
* Programming Setting & Develop.
* Assist supervisor in planning production schedule and ensure target is
met.
* Make The Fixture.
* Doing setting for regular components getting FOI clearance from
quality department.
* Operating the machine achieving the daily production to the cycle time
* Tools Arrangement.
* Prepare Production Engineering Change Notice History.
3) Name of the Employer:
Hup Soon Cheong Services Pte Ltd.,
Singapore,
Profile:
Logistics Operations.
Designation:
Supervisor / Maintenance Officer
Period:
Oct 2007 to June 2008.
Nature of Work:
* To ensure RISIPI( Receiving, Inspection, Storage, Issuing, Packing and
Inventory taking) are followed with proper guidelines to improve the
overall efficiency and effectiveness of the warehouse
* Maintenance of Warehouse Equipment/Tools and documentation materials.
* Allocate the work for Store Keepers.
* Perform double sided tape measurements for new products.
* Verification of Daily Materials Issues
* Inventory Control and Stock Maintenance
4) Name of the Employer:
ENDELA Trading & Manufacturing Pte Ltd,
Singapore,
Profile:
Manufacturer of Fasteners.
Designation:
Technical Engineer.
Period:
June 2007 to Sep 2007.
Nature of Work:
* Planning the production schedule based on customer requirements
* Generate process instructions.
* Perform double sided tape measurements for new products.
* Verification of Daily Materials Issues
* Inventory Control and Stock Maintenance
* Purchase of Warehouse Equipment/Tools and documentation materials.
5) Name of the Employer:
MGM - Ajit Transport,
Earth Equipment Division,
Chennai. Tamil Nadu, India.
Profile:
Maintenance for Wheel End Loader
Designation:
Engineer - Maintenance.
Period:
June 2001to Apr 2007
Nature of Work:
* Repair and Maintenance.
* Generate process instructions.
* Perform double sided tape measurements for new products.
* Preventive maintenances to rotating and pneumatic machines.
* To carry out preventive maintenances of conveyers.
6) Name of the Employer:
Mahindra & Mahindra, Hindustan Motors,
Udaya industries,
No. 263, MMA Salai,
Pondy - 5.
Profile:
Manufacturing of Tongs and Killen rollers.
Designation:
Engineer Production and Quality Control.
Period:
April 1999 to May 2001
Nature of Work:
* Handling all type of CNC & Conventional machines.
* Troubleshooting and analyze machine failure mechanism.
* Programming Setting & Develop
* Assist supervisor in planning production schedule and ensure target is
met.
* Make The Fixture.
* Doing setting for regular components getting FOI clearance from
quality department
* Operating the machine achieving the daily production to the cycle time
* Tools Arrangement.
* Prepare Production Engineering Change Notice History.
* Making Pre Planning To Reduce
* Percentage of Rejection
* Increase the Production
* Conversant With VMC
7) Name of the Employer:
Auto Lec Industrial Ltd.,
(G-Z) Industrial Estate, Ambattur,
Chennai - 600 058.
Profile:
Water Pump and Intake Main fold OE.
Designation:
Supervisor (Production) Cum Shift In charge
Period:
June 1996 to Feb 1999.
Nature of Work:
* Handling all type of CNC & Conventional machines.
* To carry out preventive maintenances of conveyers.
* Generate process instructions
* Installation and commissioning of industrial machines.
Personal Details:
Date of Birth : 01st May 1975
Father's Name : D. Ramadoss
Languages known : English and Tamil
Passport No. : K 3276202
Date of issue : 14.05.2012
Date of expiry : 13.05.2022
Place of issue : CHENNAI -INDIA
Place : Tindivanam
Date : (THINAGARAN. R)