Post Job Free

Resume

Sign in

Resourceful, detail-oriented, dynamic professional with broad range of

Location:
Laredo, TX
Posted:
November 26, 2013

Contact this candidate

Resume:

FRANCISCO JAVIER SANCHEZ, JR. Home: 956-***-****

Route 4 Box 261-D Mobile: 512-***-****

Laredo, Texas 78041 Email: aca9xs@r.postjobfree.com

PROFESSIONAL PROFILE

Resourceful, detail-oriented, dynamic professional with broad range of experience in fast-paced business engineering environments. Highly skilled in developing and implementing solutions to support key strategic business objectives. Strong leader and motivator who excels in teaching, training and empowering employees. Demonstrated strengths in P & L management, efficiency improvement, and profit optimization. Proven track record of success in creative and effective dealing with diverse personnel in multiple locations. Flexible, adaptable, results driven and committed to quality process and product with an opportunity for advancement.

PROFESSIONAL SKILLS

Test Engineering Product Engineering Test Systems & Equipment

- Product Test Correlation - New Product Introduction - Credence STS3500, Teradyne: J325, J941, J953, A500/A540,

- Test Program Development - Customer Relationship Management A575/A585, & Catalyst VLSI mixed-signal test platforms

- Test Program Maintenance - Product Transfers - Delta Flex, Siemens, MACH20 Handlers

Programming Languages Computer Software Operating Systems

- C, C++, Pascal - MS Office Suite, Word, Project, Excel, Power Point, & Outlook, STORMS - UNIX,LD-Pro

- HTML - SAP, SQL, SAS, Adobe Reader/Writer, Lotus Notes, AutoCAD, JERI, CIAC - Windows NT, 2000, XP, 7

Automotive Quality Data Management Automotive Product Qualifications

- Material Review Board - Early Life Failure Rate - Latch Up: Machine Model & Human Body Model

- Return Material Authorization - Electrostatic Discharge - Failure Mode & Effect Analysis

Process Quality Data Management Instruments Awards of Recognition

- Lean Manufacturing, Six Sigma, SPC, & TPM - HP Logic Analyzer, Multimeter, Wave Generator - Motorola: BRAVO, EPIC Team

- Process Average Testing & Statistical Bin Limits - Tektronix Oscilloscope, Trimble 6000 GPS - FORD & Mot.: EPIC2K Individual

Certification(s): EIT #42263, DMS(Non_DSP) Client Soft Skills (Dell customer course).

EMPLOYMENT HISTORY

AEP, Inc., Laredo, TX Mar13-Aug13

Customer Design Engineer IV

Utilized the LD-Pro software in designing cost effective solutions for residential as well as commercial customers that require electrical connections

within the STORMS Management software. Applied tariffs for electric delivery service within the JERI software used to calculate the CIAC by taking

into account overhead and/or underground services using single or three phase construction as well as applying customer discounts to customer(s) that

resided within the Eagle Ford shale region . Used the Trimble 6000 series GPS system to stake a design at a customer’s location before the design went

to construction. Worked as a team with ROW agent by providing legal exhibits that accompanied legal documents before filing these papers in court in

the county that the customer resided in.

UC Synergetic, Inc., Laredo, TX May12-Mar13

Distribution Designer 1 - Contractor

Work with STORMS Management software in combination with LD-Pro software in designing cost effective solutions for residential and commercial customers that require electrical connections. Utilized the JERI software used to calculate the customer’s CIAC total bill which applied the AEP public utility tariffs for electric delivery service(s). Used the Trimble 6000 series GPS system when staking a project before construction. Worked with AEP’s ROW agent designing an exhibit along with legal documentation that pertain to the customer’s easement.

BE&SCO, San Antonio, TX Oct10-Sept11

Service Technician

Built & assembled the electrical components for the different tortilla press model machine(s) which demonstrated track record of achieving goals in a team environment. Assisted customer(s) & service repair technician(s) in answering their technical questions on BES&CO’s tortilla press machine(s) over the telephone. Job function included troubleshooting & repairing machine(s) that were brought in by customers that needed to be repaired back to working conditions.

• Initiated ECN changes to work orders that were incorrect in order to improve operational efficiencies.

• Implemented the correct High POT test(s) to the various machine(s) in order to be granted ECL approval.

• Worked closely with engineering by implementing process changes on different machine models while maintaining weekly manufacturing goals.

FRANCISCO JAVIER SANCHEZ, JR. PAGE 2

Global Resources, Ltd. & Peak Systems, Inc. Laredo, TX Nov.09-Oct10

Computer Service Technician

Work on job assignments in the South Texas area troubleshooting PC related problems on computers that are customers of Global Resources & Peak Systems. Worked with site POC on any IT work that was assigned.

• Worked on troubleshooting PC related problems which consisted of replacing motherboard, CPU heat sink fan, USB PC card, erasing hard drive, on Dell & HP computer(s) that belong to JP Morgan Chase bank.

• Work closely with Chase Help Desk contact(s) in order to resolve the computer problem(s) in an efficient and timely manner.

• Replaced & installed Dell register systems as well as magnetic credit card swipe, and pen recognition systems for the retail industry.

• Work with customer(s) IT personnel working with by connecting PCs over their network, retrieving IP addresses, installing network

printer(s), TCP/IP, DHCP, DNS servers, as well as upgrading CISCO switch router gear(s) connected to T1 line.

Crane Engineering Corp., Laredo, TX Jun06-Jan09

Engineering in Training

Working as a team member supporting various civil engineering functions by developing and designing water, sewer, street, drainage as well as pollution prevention solutions in AutoCAD & Autodesk Land Development for both private and public clients. Support commercial & residential clients by working with city & county governments as well as TxDOT state agency by complying with ordinances for platting property that is both cost effective & equitable to parties involved. Estimated quantities for basis of estimates necessary to complete the project before a bid schedule is send out to contractors. Familiarized with TECQ rules & regulations.

• Work with contractors to resolve problems that arise in the construction phase of the project due to unforeseen circumstances.

• Research & interpret new city ordinances with cost effective solutions in order to be granted final plat status.

United Independent School District, Laredo, TX Aug04-May06

Teacher

Taught 12th grade level research & design course to students at the United Engineering & Technology Magnet at United High School. Sponsor for the Ultimate Robotics Club. Robotics team participated in BEST & FIRST Robotics competitions. Certified in Technology Education (Grades 6-12) with the State Board for Educator of Texas. Exposed students to different various engineering disciplines.

• Course consisted of research & design projects using sound engineering problem solving methods to objectively & quantitatively solve various open-ended problems. Formal technical papers were prepared according to industry standards & the students presented their projects to representatives of the engineering community during a formal presentation.

LTX Corp., Richardson, TX May02-Nov02

Field Application Engineer

Field application engineer which supported the Texas Instruments DTF test floor. Completed training for ATPG COMTEST course.

• Worked with initial development team on implementing a 2.5G-3G mixed signal test chip on LTX Fusion test system. Worked to develop stable characterization test techniques in enVision software.

MOTOROLA INC. Semiconductor Product Sector (SPS), Austin, TX 1989-2002

Senior Product Engineer 1999-2002

Technical support engineer for the FORD EPIC Powertrain family of devices manufactured by Motorola SPS. Lead weekly meetings with wafer fab and final test site teams to understand and resolve wafer fab issues for low yields, non-conforming material, & customer returns. Wrote the EPIC2K test program on the A585 test platform.

• Isolated & resolved test containment issues, which prevented customer losing of Q1 quality status with FORD Motor Co..

• Coordinated & performed automotive industry qualification testing (ELFR, ESD, & Latch Up) in order to validate wafer fab and assembly process changes, resulting in improved internal yields as well as fewer customer warranty returns.

• Performed test correlation for transfer of products to overseas test sites in order to ensure high level of functionality in a production environment. Assisted failure analysis be verifying & translating test vector patterns.

• Implemented test containment patterns that resolved customer TNI issues as well as test time reduction program changes.

• Cross functional team member that worked with customer (s), quality assurance, manufacturing as well as offshore facilities driving six sigma principles towards 0 ppm initiatives.

Product Test Engineer/Equipment Test Engineer/Technical Supervisor 1989-1999

Key technical support engineer for consolidating test factories within Motorola SPS worldwide. Assisted in transferring product and test equipment to offshore test sites by resolving their technical issues. Manufacturing support engineer responsible for ASIC devices tested with multiple tester(s): Credence STS3500, J325, J941, J953, A500/A540, A575/A585, & Catalyst VLSI test platforms. Responsible for product yield improvements by debugging hardware & software problems across multiple tester platforms. One of two team members that supervised between 60 and 65 production operator(s) which met weekly & monthly production goals for the Motorola Ed Bluestein Blvd. facility.

FRANCISCO JAVIER SANCHEZ, JR. PAGE 3

• Lead weekly meetings with offshore test sites that addressed technical issues which allowed minimal impact on customer(s).

• Wrote and qualified parallel dual site test program from single site on certain ASIC devices.

• Implemented program improvements on non-conforming product using process average testing & statistical bin limits.

• Performed statistical analysis for gage studies on test equipment which collected & analyzed test data.

• Key team member that upgraded the hardware on A570/A580 testers worldwide within SPS.

• Team member that introduced a statistical based process “StatGate” to FORD AICE product family.

EDUCATION

Bachelor of Science in Electrical Engineering May 1989, Texas A&M University, College Station, Texas



Contact this candidate