*** ****** ****** • Hanson, MA ***** • 781-***-**** •
************@*******.***
CHRISTOPHER COSTELLO
EDUCATION
Wentworth Institute of Technology, Boston, MA
Associates in Applied Science, Construction Technology, May 1996
Bachelor of Science, Construction Management, August 1998
Wentworth Institute of Technology, Boston, MA
College of Professional and Continuing Education
Certificate, Heavy and Highway Construction, May 2011
Northeastern University, Boston, MA
Coursework towards Master of Science, Civil Engineering with Concentration in
Construction Management (2012 - Present)
PROFESSIONAL EXPERIENCE
National Grid, Waltham, MA (2012 – Present)
Field Construction Coordinator/Supervisor (Gas Construction NE – Providence, RI)
Responsible for the coordination, scheduling and oversight of gas construction projects
in RI assigned to outside contractors to ensure all work is performed in accordance
with National Grid standards and procedures. My responsibilities include project
design/constructability review, SOP preparation, provision of materials, technical
direction, safety, quality and environmental assurance, increase and monitor
contractor productivity, review and approve invoices, problem resolution, manage
change control and review and closure of all project documentation. Worked with
owner agencies to plan projects.
Schiavone Construction Co. LLC, New York, NY (2009 – 2010)
Tunnel Superintendent – Swing Shift (East Side Access, Project CM009/019 – New York,
NY)
Managed the planning and execution for multiple swing shift work crews and
construction activities including TBM mining, drill-and-blast excavation, pre-
excavation support spilling, shot-creting, re-medial re-cribbing at ring steel
locations and roadheader excavation. Responsibilities included coordinating
with general superintendent, project engineers and field engineers,
resolving field issues and conflicts, coordinating material delivery, track
shift production and cost, monitor work to ensure it complied with contract
documents and MTA quality standards, submit shift reports and
implemented company safety policy. Established effective team
relationships with MTA representatives, union members and subcontractors.
Performed additional assignments as assigned by supervisors.
Shank/Balfour Beatty, Boston, MA (2007 – 2009)
Project Engineer (North Dorchester Bay CSO Storage Tunnel - Boston, MA)
Provided field supervision and engineering support to the Project Manager and
Superintendents during TBM tunneling operations for the construction a 10,900-ft
1
446 Spring Street • Hanson, MA 02341 • 781-***-**** •
************@*******.***
CHRISTOPHER COSTELLO
segmental lined (17-ft finished diameter) CSO storage tunnel. Reviewed contract
documents for material requirements, quantity take-off's and pricing, assisted with bid
packages and material procurement. Generated a list of required submissions and
tracked all submittals and RFI’s. Worked with suppliers as required facilitating the
handling and expediting the delivery of all materials. Identified and coordinated
pricing for change orders, tracked all T&M work, reviewed subcontractor and supplier
invoices and completed payment requisitions. Tracked daily quantities from field
operations, prepared monthly progress payments to MWRA and assisted in schedule
maintenance and updates. Followed awarded subcontracts as assigned.
PROFESSIONAL EXPERIENCE (CONT.)
Granite Construction Company, Watsonville, CA (2006 – 2007)
Office Engineer (I-205 LTR Extension Project - Portland, OR)
Prepared accurate estimates for the design-build of 6.5 miles of rail alignment to
TriMet's light rail network. Reviewed contract documents to determine scope of work
and material requirements. Performed complete quantity take-off’s, developed price
work based on production rates and subcontractor input. Researched for
constructability methods, initiated RFI's, contacted subcontractors and suppliers for
quotes, assisted in preparation of bid packages and performed additional assignments
as needed.
Field Engineer (Market Street Elevated Transit Construction - Philadelphia, PA)
Provided field supervision and engineering support for the construction of 3,600 LF of
elevated precast concrete guideway. Prepared material take-off’s, tracked operation
costs and quantities, generated RFI’s and resolved concrete construction issues in
support of on-going field work.
Tutor-Saliba Corp., Sylmar, CA (2001 – 2003)
Project Engineer (Richmond-San Rafael Bridge Seismic Retrofit Project – Richmond, CA)
Provided engineering support to field operations for all structural steel related construction
activities for the seismic retrofit of a 4.5-mile long cantilever bridge. Prepared material
take-off's, engineering calculations and technical drafting, gathered and prepare data
for submittals to Caltrans representatives. Generated RFI’s, change orders and as-
built data. Provided field support and supervised subcontractor operations.
Modern Continental Construction Company, Cambridge, MA (2000 – 2001)
Project Engineer (Terminal “E” International Gateway Project, Logan International
Airport – Boston, MA)
Provided field supervision and coordination for the installation of concrete piles, utility
relocations, and the excavation/disposal of contaminated soil. Managed submittal
review and approval process, generated RFI's and updated project documents as
required. Managed all equipment on project. Monitored subcontractors and vendors
as required, verified quantities and reviewed and approved invoices.
Kiewit Construction Company, Medway, MA (2003 – 2005, 1998 – 2000)
Office Engineer (Delta Terminal “A” Redevelopment Project, Logan International Airport
– Boston, MA)
2
446 Spring Street • Hanson, MA 02341 • 781-***-**** •
************@*******.***
CHRISTOPHER COSTELLO
Provided project controls, subcontract/material management, and schedule
coordination for electrical construction operations. Performed quantity take-off’s,
generated change orders, expedited material on the job, prepared cost estimates,
analyzes production and cost statistics and tracked installed quantities. Managed
submittal review and approval, generated RFI’s and created as-built drawings. Verified
vendor invoices and completed payment requisitions.
Entry-Level Engineer (Mainline Bridge over Charles River, CA/T Project C19D2 – Boston,
MA)
Provided field supervision for the construction of drilled shafts, coordinated with the
superintendent scheduling field operations. Prepared daily reports, material take-off’s,
tracked operation costs and quantities. Preformed essential project management
tasks; schedule updates, transmit and track design and technical submittals and RFI’s.
Monitored awarded subcontracts as assigned; estimated extra work items, credits and
material procurement.
TRAINING AND CERTIFICATIONS
ACI Certified Field Testing Technician – Grade I OSHA 10 Hour Construction Safety
& Health
Metro-North Railroad – Track Safety Trained NYCTA – Track Safety Trained
3