Post Job Free
Sign in

Engineer Project

Location:
Medford, MA
Posted:
November 18, 2013

Contact this candidate

Resume:

*** ****** ****** • Hanson, MA *****781-***-****

************@*******.***

CHRISTOPHER COSTELLO

EDUCATION

Wentworth Institute of Technology, Boston, MA

Associates in Applied Science, Construction Technology, May 1996

Bachelor of Science, Construction Management, August 1998

Wentworth Institute of Technology, Boston, MA

College of Professional and Continuing Education

Certificate, Heavy and Highway Construction, May 2011

Northeastern University, Boston, MA

Coursework towards Master of Science, Civil Engineering with Concentration in

Construction Management (2012 - Present)

PROFESSIONAL EXPERIENCE

National Grid, Waltham, MA (2012 – Present)

Field Construction Coordinator/Supervisor (Gas Construction NE – Providence, RI)

Responsible for the coordination, scheduling and oversight of gas construction projects

in RI assigned to outside contractors to ensure all work is performed in accordance

with National Grid standards and procedures. My responsibilities include project

design/constructability review, SOP preparation, provision of materials, technical

direction, safety, quality and environmental assurance, increase and monitor

contractor productivity, review and approve invoices, problem resolution, manage

change control and review and closure of all project documentation. Worked with

owner agencies to plan projects.

Schiavone Construction Co. LLC, New York, NY (2009 – 2010)

Tunnel Superintendent – Swing Shift (East Side Access, Project CM009/019 – New York,

NY)

Managed the planning and execution for multiple swing shift work crews and

construction activities including TBM mining, drill-and-blast excavation, pre-

excavation support spilling, shot-creting, re-medial re-cribbing at ring steel

locations and roadheader excavation. Responsibilities included coordinating

with general superintendent, project engineers and field engineers,

resolving field issues and conflicts, coordinating material delivery, track

shift production and cost, monitor work to ensure it complied with contract

documents and MTA quality standards, submit shift reports and

implemented company safety policy. Established effective team

relationships with MTA representatives, union members and subcontractors.

Performed additional assignments as assigned by supervisors.

Shank/Balfour Beatty, Boston, MA (2007 – 2009)

Project Engineer (North Dorchester Bay CSO Storage Tunnel - Boston, MA)

Provided field supervision and engineering support to the Project Manager and

Superintendents during TBM tunneling operations for the construction a 10,900-ft

1

446 Spring Street • Hanson, MA 02341 • 781-***-****

************@*******.***

CHRISTOPHER COSTELLO

segmental lined (17-ft finished diameter) CSO storage tunnel. Reviewed contract

documents for material requirements, quantity take-off's and pricing, assisted with bid

packages and material procurement. Generated a list of required submissions and

tracked all submittals and RFI’s. Worked with suppliers as required facilitating the

handling and expediting the delivery of all materials. Identified and coordinated

pricing for change orders, tracked all T&M work, reviewed subcontractor and supplier

invoices and completed payment requisitions. Tracked daily quantities from field

operations, prepared monthly progress payments to MWRA and assisted in schedule

maintenance and updates. Followed awarded subcontracts as assigned.

PROFESSIONAL EXPERIENCE (CONT.)

Granite Construction Company, Watsonville, CA (2006 – 2007)

Office Engineer (I-205 LTR Extension Project - Portland, OR)

Prepared accurate estimates for the design-build of 6.5 miles of rail alignment to

TriMet's light rail network. Reviewed contract documents to determine scope of work

and material requirements. Performed complete quantity take-off’s, developed price

work based on production rates and subcontractor input. Researched for

constructability methods, initiated RFI's, contacted subcontractors and suppliers for

quotes, assisted in preparation of bid packages and performed additional assignments

as needed.

Field Engineer (Market Street Elevated Transit Construction - Philadelphia, PA)

Provided field supervision and engineering support for the construction of 3,600 LF of

elevated precast concrete guideway. Prepared material take-off’s, tracked operation

costs and quantities, generated RFI’s and resolved concrete construction issues in

support of on-going field work.

Tutor-Saliba Corp., Sylmar, CA (2001 – 2003)

Project Engineer (Richmond-San Rafael Bridge Seismic Retrofit Project – Richmond, CA)

Provided engineering support to field operations for all structural steel related construction

activities for the seismic retrofit of a 4.5-mile long cantilever bridge. Prepared material

take-off's, engineering calculations and technical drafting, gathered and prepare data

for submittals to Caltrans representatives. Generated RFI’s, change orders and as-

built data. Provided field support and supervised subcontractor operations.

Modern Continental Construction Company, Cambridge, MA (2000 – 2001)

Project Engineer (Terminal “E” International Gateway Project, Logan International

Airport – Boston, MA)

Provided field supervision and coordination for the installation of concrete piles, utility

relocations, and the excavation/disposal of contaminated soil. Managed submittal

review and approval process, generated RFI's and updated project documents as

required. Managed all equipment on project. Monitored subcontractors and vendors

as required, verified quantities and reviewed and approved invoices.

Kiewit Construction Company, Medway, MA (2003 – 2005, 1998 – 2000)

Office Engineer (Delta Terminal “A” Redevelopment Project, Logan International Airport

– Boston, MA)

2

446 Spring Street • Hanson, MA 02341 • 781-***-****

************@*******.***

CHRISTOPHER COSTELLO

Provided project controls, subcontract/material management, and schedule

coordination for electrical construction operations. Performed quantity take-off’s,

generated change orders, expedited material on the job, prepared cost estimates,

analyzes production and cost statistics and tracked installed quantities. Managed

submittal review and approval, generated RFI’s and created as-built drawings. Verified

vendor invoices and completed payment requisitions.

Entry-Level Engineer (Mainline Bridge over Charles River, CA/T Project C19D2 – Boston,

MA)

Provided field supervision for the construction of drilled shafts, coordinated with the

superintendent scheduling field operations. Prepared daily reports, material take-off’s,

tracked operation costs and quantities. Preformed essential project management

tasks; schedule updates, transmit and track design and technical submittals and RFI’s.

Monitored awarded subcontracts as assigned; estimated extra work items, credits and

material procurement.

TRAINING AND CERTIFICATIONS

ACI Certified Field Testing Technician – Grade I OSHA 10 Hour Construction Safety

& Health

Metro-North Railroad – Track Safety Trained NYCTA – Track Safety Trained

3



Contact this candidate