Post Job Free

Resume

Sign in

Electrical Engineer Project

Location:
Pozorrubio, Pangasinan, Philippines
Salary:
20K plus
Posted:
August 03, 2019

Contact this candidate

Resume:

POSITION DESIRED: STAFF ENGINEER

PERSONAL DATA

NAME : VICTOR P. GUANZON

ADDRESS : *** ******** **. ****** ****

CONTACT NUMBERS : 099*-***-**** & 422 4128

DATE OF BIRTH : JULY 29, 1964

PROF. LICENSE : REGISTERED ELECTRICAL ENGINEER

EMAIL ADDRESS : ac9y27@r.postjobfree.com

SALARY DESIRED : P20, 000.00+

PROFESSIONAL EXPERIENCES

NAME OF COMPANY : GRICK ENTERPRISES & ELECTRICAL SERVICES

NAME OF PROJECT : The RESIDENCESS at Brent (Baguio)

POSITION : SITE ELECTRICAL ENGINEER

DATE : SEPTEMBER 2016- Present

-Manage the electrical works for seven (7) medium rise high condominium buildings

NAME OF COMPANY : FLUOR MIDEAST LTD.

NAME OF PROJECT : SHAH GAS DEVELOPMENT PROJECT

POSITION : SENIOR E & I CONST. SUPERVISOR (PMC)

DATE : APRIL 2011-NOVEMBER 30, 2011

-Inspection of various EPC contractors’ E & I works such as cathodic protection tank farm facilities, EHV substation, MV substations, underground conduits, duct banks etc.

-Inspection of various EPC contractors camp sites for electrical installations to conform company’s requirements

-Inspections of various contractor’s materials and equipment deliveries to check if they conform to our requirements

-Attend PMC and EPC contractors meeting

-Undertake daily safety walkdown with different EPC contractors and subcontractors

-Evaluate EPC contractors for progress of works

NAME OF COMPANY : FLUOR ARABIA LTD.

NAME OF PROJECT : SAUDI KAYAN U & O PROJECT

POSITION : E & I CONSTRUCTION ENGINEER

DATE : OCTOBER 13, 2009-MAY 15, 2010

Duties and responsibilities:

-Systems owner for various instrument subsystems as part of the Loop Check and CommissioningTeam for the sea water intake, effluent treatment plant, ground/elevated flare, third party metering, compressors, boilers, boiler feed water, incinerators and Port facilities.

-Responsible for checking instruments in the field for these systems if they are completely installed by doing P & ID check.

-Responsible for ensuring that loop folders for these instruments have QVDs, chasing contractors to complete them and ensuring that punch lists are corrected immediately.

-Responsible for failed loops to make sure that fixing teams are working them immediately to correct the problem.

-Responsible for post loop check punch lists clear out.

-Involved in the functional check of instrument loops.

NAME OF COMPANY : FLUOR ARABIA LTD.

NAME OF PROJECT : SPC TASNEE PPX PROJECT

POSITION : E & I CONSTRUCTION ENGINEER

DATE : AUGUST 5, 2008-OCTOBER 12, 2009

Duties and responsibilities:

-Responsible for the E & I construction of new PPX Substation that include installations of Transformers, HV switchgears, LV switchgears, MCCs, Batteries/battery chargers and UPS systems, and all auxiliary panels for the entire substation works, substation cabling, grounding, glanding and termination.

-Responsible for the installations of electrical and instruments at Polymerization, Extrusion, GRU, Logistics and Treater areas such as heat tracing, cathodic protection, RCUs, instrument JBs, transmitters, valves, thermowells, MAMA systems, loop checking, instrument hook-ups etc.

-Quality control inspections for the E & I for the whole PPX project.

-Review contractor’s progress, RFAs, and resolve engineering site issues.

-Coordinate with vendor reps.

-Attend coordination, progress and vendor’s meetings.

-Make internal MTOs.

-Make electrical turn-over packages.

-Testing and precommissioning.

NAME OF COMPANY : SEPAM KUWAIT

SECONDED TO : FLUOR KUWAIT

NAME OF PROJECT : KUWAIT OLEFINS II PROJECT

POSITION : SENIOR E & I CONSTRUCTION ENGINEER

DATE : JANUARY 15, 2007-APRIL 30, 2008

Duties and responsibilities:

-Responsible for the E & I construction of SCT Substation that include installations of Transformers, HV switchgears, LV switchgears, MCCs, Battery and UPS systems, and all auxiliary panels for the entire substation works, substation cabling, grounding, glanding and termination.

-Responsible for cooling tower/chemical dosing/pump station/make-up filter/analyzer house field lighting and power outlets, cable tray, conduits, cable pulling, lightning protection and grounding systems, and instrumentation works all as per Dow standards.

-Done the MTO and material order for all the above-systems.

-Done planning and progress monitoring

-Pre-commissioning, testing and turn-over of the system

-Responsible for technical evaluation of candidates for placements of SEPAM projects worldwide in the Philippines recruitment drive.

NAME OF COMPANY : QMMC

NAME OF PROJECT : 33 STOREY GOLDEN TOWER PROJECT

POSITION : SENIOR ELECTRICAL ENGINEER

DATE : NOVEMBER 20, 2005-NOVEMBER 5, 2006

Duties and responsibilities:

-Responsible for the production of working shop drawings for the installations of transformers, power generator, BMS, central battery systems, grounding systems, lightning protection, lighting, small power, telephone, intercom, home automation, bus bar risers, medium voltage distribution boards, Fire alarm systems, CCTV, computer systems, cable tray, lighting control systems etc.

-Attend daily coordination and weekly management meetings.

-Do calculation of voltage drops of each cable.

NAME OF COMPANY : QMMC

NAME OF PROJECT : KHALIFA SPORTS CITY-QATAR

POSITION : SENIOR ELECTRICAL ENGINEER

DATE : JANUARY 14, 2005-NOVEMBER 20, 2005

Duties and responsibilities:

-Make progress report for the installation of Lighting, Power, CCTV, Audio/Video, BMS, Telephone and Computer for LAN, Door access, Fire alarm systems, Grounding systems and Lightning protection system, Cable tray, VESDA systems etc.

-Make mechanical and electrical variation works, studying the impact of each variation, quantity take off for materials, quantity surveying and costing.

-Do the shop drawing cable list, calculation of voltage drops of each cable to identify variation due to voltage drop and resizing of cables to allow voltage drop in accordance to regulations.

-Do the shop drawing cable tray take off, resizing of cable tray due to cable variations.

-Do the O & M Manuals of Transformers, MV panels, BMS, CCTV, Fire Alarm systems, Lightning Protection Systems, Lighting Control Systems, PA systems, AHU's, Fire fighting systems, Plumbing systems, Pumps, Air curtains and other mechanical systems.

-Estimate various M & E industrial, high rise, commercial, school and other projects at main office.

NAME OF COMPANY : MAZCO SEPAM

NAME OF PROJECT : JUPC COOLING TOWER PROJECT

POSITION : ELECTRICAL ENGINEER

DATE : APRIL 1, 2004-DECEMBER 3, 2004

Duties and responsibilities:

-Make electrical and instrument installation drawings for power, lighting, fire and gas, cable tray route, grounding etc. for JUPC heat exchanger and cooling tower areas.

-Quantity survey of instrument and electrical installation including quantity take off for materials, and costing.

-Request for RFIs for instrument and electrical installations.

-Request for materials as per the specifications.

NAME OF COMPANY : MAZCO SEPAM

NAME OF PROJECT : SWC WET WELLS PROJECT

POSITION : PROJECT ENGINEER

DATE : MAY 1, 2003-MARCH 31, 2004

Duties and responsibilities:

-Manage the installation and cabling of SCADA systems, Water quality measurement systems, battery back-up systems, power equipments, lighting, power, grounding, cable tray etc. for four (4) outstations and flow meter chambers for the SWC wet wells project.

-Make shop drawings in AutoCAD.

-Make Primavera schedule and progress monitoring.

-Attend daily and weekly meetings

-Make AutoCAD as-built drawings

-Do the O & M manuals for the above systems installed.

NAME OF COMPANY : MAZCO SEPAM

NAME OF PROJECT : PETROKEMYA PKPE PROJECT

POSITION : FIELD ELECTRICAL ENGINEER

DATE : MARCH 7, 2003-APRIL 30, 2003

Duties and responsibilities:

-Make work package for the electrical installations of Finishing area, Silo area and Bagging area of the PKPE project

-Material take off of material requirements for each work packages.

-Quantity surveying of the accomplished electrical installation jobs.

NAME OF COMPANY : MANILA KYOWA INC./ASCO JV

NAME OF PROJECT : NEW CNS/ATM OF THE PHILIPPINES

POSITION : ELECTRICAL DESIGN ENGINEER

DATE : OCTOBER 16, 2002-MARCH 4, 2003

Duties and responsibilities:

-Detail design for the lighting, power, telephone, fire alarm, paging systems, CCTV etc. for the sprawling New CNS/ATM center building incl. substation, and distribution equipments.

NAME OF COMPANY : MANILA KYOWA/SUMITUMO JV

NAME OF PROJECT : NATIONWIDE NAVIGATION PROJECT

POSITION : DESIGN/PROJECT ENGINEER

DATE : SEPTEMBER 25, 2001-OCTOBER 15, 2002

Duties and responsibilities:

-Detail design of the electrical installation works for the various air navigation facilities, like DVOR/DME equipment building, Building type control towers etc. for twenty seven (27) international and national airports in the Philippines.

-Manage the installation of electrical works for Nationwide Navigation Project for Laoag International, Cauayan national and Baguio national airports.

NAME OF COMPANY : MANILA KYOWA (JAPAN) INC. /PCI JV

NAME OF PROJECT : VARIOUS DESIGN PROJECTS

POSITION : ELECTRICAL DESIGN ENGINEER

DATE : JULY 10, 2000-SEPTEMBER 20, 2001

Duties and responsibilities:

-Detail design for the electrical and installation works such as lighting, power, BMS, telephone, PA, fire alarm, CCTV, PABX, transmission and distribution equipments for ASAHI, MITSUMI and ENOMOTO manufacturing plants.

-Assist in the detail design for the electrical works of the Pampanga River Delta Flood Control project.

-Assist in the basic and detail design for electrical and mechanical works of Tacloban International and Bacolod International airports in JV with PCI.

NAME OF COMPANY : R.A. NOLIDO CONSTRUCTION CORP.

NAME OF PROJECT : VARIOUS LOCAL PROJECTS

POSITION : FIELD ELECTRICAL ENGINEER

DATE : FEBRUARY 20, 1999-JULY 15, 2000

Duties and responsibilities:

-Detail design for the electrical and installation works such as lighting, power, BMS, telephone, PA, fire alarm, CCTV, PABX, transmission and distribution equipments for various commercial and residential projects

-Supervise the electrical works of PHHA and Montessori schools and various commercial and residential projects.

-Assist in the design of Tuguegarao Park and Leisure Hotel

-Supervise the electrical works of Bataan Metro mall.

NAME OF COMPANY : CONSTRUCTIVE BUILDERS INC.

NAME OF PROJECT : VARIOUS LOCAL PROJECTS

POSITION : FIELD ELECTRICAL ENGINEER

DATE : SEPTEMBER 1, 1996-FEBRUARY 15, 1999

Duties and responsibilities:

-Manage the electrical installation jobs for LTO main office building, fourteen (14) medium rise government residential buildings, UP School Computer main building, LRA govt. building.

- Manage the electrical installation works of Fiesta Mall including anti shoplifting devices, CCTV camera, Paging systems, POS systems, lighting, power, door access, power distribution equipments etc.

NAME OF COMPANY : ROMAGO INC.

NAME OF PROJECT : VARIOUS LOCAL PROJECTS

POSITION : ESTIMATOR/ELECTRICAL ENGINEER

DATE : FEBRUARY 16, 1996-JULY 30, 1996

Duties and responsibilities:

-Manage the electrical installation jobs for 24 story EL Tower building.

-Estimated various high rise buildings, commercial and manufacturing plants using ACCUBID software.

NAME OF COMPANY : SCS INDUSTRIAL CORP.

NAME OF PROJECT : VARIOUS LOCAL PROJECTS

POSITION : FIELD ELECTRICAL ENGINEER

DATE : JUNE 15, 1994-FEBRUARY 1, 1996

Duties and responsibilities:

-Manage the electrical installation jobs for NOAH’S Paper Mills plant including the 40 MVA substations including metering and protection, MCCs, MV Panels, DCS, Transformers, Conveyors systems, Motor terminations and testing, Fire Alarm, PA systems, Motor Drive systems, lighting and small power etc.

NAME OF COMPANY : SAUDI ARABIAN KENTZ LTD.

NAME OF PROJECT : BERRI GAS PLANT PROJECT

POSITION : ELECTRICAL TECHNICIAN/QC INSPECTOR

DATE : JANUARY 05, 1993-MARCH 30, 1994

Duties and responsibilities:

-Responsible for the electrical installation jobs like R.O. plant instrument mounting, boiler plant instrument and electrical mounting, control room control cabling and termination, cable tray and piping, cabling for equipments, transformers, control panels etc. for Berri Gas Rehabilitation plant project of Saudi Aramco.

-Lately in the project, assigned as QC inspector and responsible for quality control installation inspections for electrical and instrument piping, cable tray laying, wiring and terminations of Berri Gas Plant Rehabilitation Project.

NAME OF COMPANY : SOLID CONSTRUCTION INC.

NAME OF PROJECT : VARIOUS LOCAL PROJECTS

POSITION : TIMEKEEPER/ELEC. SUPERVISOR

DATE : OCTOBER 16, 1988-DECEMBER 30, 1991

Duties and responsibilities:

-Responsible for the manpower monitoring including equipment and material orders monitoring and checking.

-Responsible for monitoring electrical subcontractor installation and checking.

-Supervise the electrical works of RCBC and METROBANK branches.

EDUCATIONAL BACKGROUND

B.S. in Electrical Engineering : Technological Institute of the Phils.

Degree earned : BS in Electrical Engineering

Year Attended : 1983-1988

SEMINARS ATTENDED

Industrial Electrician : Meralco Foundation Phils.

Primavera P3e (Project Management) : NTC, Damman, KSA

Primavera P3 (Project Management) : Crescent Technologies Phils.