Resume

Sign in

Power Plant Engineering

Location:
Riyadh, Riyadh, Saudi Arabia
Posted:
July 28, 2019

Contact this candidate

Resume:

Mr. DIVAKAR C. KOLSE (** YEARS OF EXPERIENCE IN POWER PLANTS)

Cv for : Manager_ Instrumentation and Control ( Project Management ).

Date of Birth: 20th Oct 1964.

Address: Subeka – Khobar Street –Al-Khobar-31952 . Kingdome of Saudi Arab.

Contact Number: 009**-*********

Email Id : ac9w5y@r.postjobfree.com

GCC Experience: 17 years & Total Experience in power Generation Plants: 27 years.

OBJECTIVE:

For challenging position in a reputed organization I am looking for Manager position – Instrumentation and control / DCS systems; where I could utilize my knowledge & rich power plant project Management experience, ideas for personal and organizational benefits.

Strengths

Positive Attitude: Ready to work for any challenging job related to Instrumentation and control /DCS for Several Turbine like GE GAS Turbine Frame 6E, Frame 7F, Siemens SGT6-2000E, KWU steam turbine of 210 MW, Thermal power plants ( 4* 210 MW ) open cycle and GE combine cycle power plants,Desalination plants for company benefits & personal knowledge/skills.

27 years of rich experience in Power Generation Open and Combine cycle power plants,Desalination plants in Instrumentation and control/DCS /PLC /SCADA systems. My Job DESIGN, ENGINEERING, INSTALTAION & COMISSIONING DESIGN REVIEW DOCUMENTS OF ESD /PLC SYSTEMS FOR OPEN CYCLE AND COMBINE CYCLE POWER PLANTS - STEAM TURBINES – GAS TURBINES- HRSG PACKAGES- BOP PLANTS-DESALINATION PLANTS, GAS AND COAL FIRED BOILER.

Detail Experience stated as below

1.

Years

Position

Company Name & Location

July 1989 to 2001

Junior Enngineer

Maharashtra Power Generation Company Khaperkheda –Nagpur INDIA.

Plant Capacity :

4 * 210 MW Steam Turbine-KPKD Plants & 3 * 120 MW GAS TURBINE & BOP plants at Uran Gas Power plants. DCS: ABB.

Nature of Job : Junior Engineer ( I&C systems / DCS – Design and Engineering Review-Installation and commissioning .( Total : 9 + 3 = 12 years .)

ABB DCS SYSTEM : . ENGINEERING – DESIGN – DESIGN DOCUMENTS REVIEW & COMISSIONING OF ABB PRO-CONTROL P14, ABB ADVENT CONTROL DCS, and ABB TURBOTROL 6. WS POSE DCS SYSTEMS. FOR 5*210 MW (STEAM TURBINE AND GAS & COAL FIRED BOILERS) POWER PLANTS.

DCS PACKAGE : DESIGN AND ENGINEERING FOR HARDWARE INCLUDING REQUIREMENTS OF I/O MODULES, PROCESSORS, CONTROLLERS, WORK STATION, SERVERS, HISTORIANS, DIAGNOSTIC STATION INCLUDING CONFIGURATION, SOFTWARE INSTALATION AND PROGRAMMING IN PROCESSORS AND CONTROLLERS TUNNING REQUIRED FOR 4* 210 MW SET SETAM TURBINES, GAS & COAL FIRED BOILERS.

BOILERS ( PROCESS CONTROLLERS ).

DESIGN & ENGINEERING, DESIGN AND ENGINEERING DOCUMENTS REVIEW, INSTALATION AND COMISSIONG FOR BOILER AND TURBINE CONTROLLERS LIKE DRUM LEVEL, FURNACE PRESSURE, AIR FLOW CONTROL, HP BY PAAS PRESSURE AND TEMPERATURE CONTROL, LP BYPASS PRESSURE AND TEMPERATURE CONTROLS, APRDS PRESSURE & TEMPERATURE CONTROL, HOTWELL LEVEL CONTROLS, SUPERHEAT AND REHEAT SPRAY CONTROLLERS, BTPC CONTROLLERS, MILL TEMP CONTROLS, MILL TO PA FLOW CONTROLS, LP/HP HEATERS CONTROLS.UNIT DEMAND CONTROLS, CO-ORDINATED CONTROLS ( CMC CONTROLS ), BOILER MASTER CONTROLS ETC.

BOILER PROTECTIONS FOR OIL & GAS FIRED / COAL FIRED BOILERS: DESIGN DOCUMENTATION REVIEW AND IMPLEMENTATION OF PROTECTIONS SUCH AS LOSS OF ALL FUELS, LOSS OF DC VOLTAGE, LOSS OF FLAME FAILURE, LOSS OF SCANNER AIR FANS, BOTH ID FANS TRIP, AIR FLOW LESS THAN 30%, FURNACE PRESSURE VERY HIGH, FURNACE PRESSURE VERY LOW, DRUM LEVEL VERY LOW, DRUM LEVEL VERY HIGH,

TURBINE CONTROLLERS

DESIGN AND ENGINEERING DOCUMENTS REVIEW AND COMISSIONING FOR LOAD CONTROL, SPEED CONTROL, PRESSURE CONTROL, ATRS, ATT, TURBINE PROTECTIONS FOR STEAM TURBINES.

TURBINE SUPERVISORY EQUIPMENTS FOR STEAM TURBINE.

DESIGN & ENGINEERING, DESIGN DOCUMENTS REVIEW, INSTALATION AND COMISSIONG FOR TURBOVISORY INSTRUMENTS SUCH AS HP TURBINE EXPANSION SENSOR, IP TURBINE EXPANSION SENSORS, LPTE SENSORS, AXIAL SHIFT SENSORS, BEARING / SHAFT VIBRATION SENSORS, HALL PROBE SPEED SENSORS, BRWON SPEED SENSORS FOR STEAM AND GAS TURBINES.

TGVAS/ST VAS : DESIGN AND ENGINEERING. DESIGN DOCUMENTS REVIEW - INSTALATION AND COMISSIONG OF BENTLY NEWDA 3500, USA FOR VIBRATION MONITORING SYSTM FOR STEAM TURBINE, BOILER FEED WATER PUMPS, CONDENSER EXTRACTION PUMPS, ID FANS & FD FANS.

ROLE : LEAD I&C DESIGN ENGINEER. ( 3 YEARS ).

( COMBINE CYCLE POWER PLANT 250 MW STEAM TURBINE & 3* 128 MW OF GAS TURBINE. )

ABB DCS & CONTROL SYSTEMS : . ENGINEERING – DESIGN, DESIGN AND ENGINEERING DOCUMENTS REVIEW & COMISSIONING OF ABB PRO-CONTROL P14 & ADVENT DCS SYSTEMS FOR 3 * 120 MW GAS TURBINE & STEAM TURBINE ( 250 MW ) COMBINE CYCLE POWER PLANTS..

DCS PACKAGE : DESIGN AND ENGINEERING FOR I&C AND DCS SYSTEMS - INSTALLATION AND COMMISSIONING OF HARDWARE INCLUDING I/O MODULES, PROCESSORS, CONTROLLERS, WORK STATION, SERVERS, HISTORIANS REQUIRED FOR 3* 120 MW GAS TURBINE & 250 MW SET -SETAM TURBINES

HRSG PACKAGE : DESIGN & ENGINEERING, DESIGN AND ENGINEERING DOCUMENTS REVIEW - INSTALATION, COMISSIONING, .DATA BASE CONFIGURATION, MMI CONFIGURATION, CONTROLLER TUNNING LIKE DRUM LEVEL CONTROLS HP/LP/IP DRUM LEVELS, HOTWELL LEVEL CONTROL, SH/RH temp controls, HP/LP HEATERS CONTROLS, COMISSIONING OF C&I INSTRUMENTS AND THERE CALIBRATIONS.

GAS TURBINES:, DESIGN & ENGINEERING,, DESIGN AND ENGINEERING DOCUMENTS REVIEW, INSTALLATION, COMISSIONING OF ABB TURBOTROL TURBINE CONTROL SYSTEMS FOR 3* 120 MW ( GAS TURBINE ) SETS.

GAS TURBINE CONTROLS : DESIGN AND ENGINEERING- DOCUMENST REVIEW & COMISSIONING FOR LOAD CONTROL, SPEED CONTROL & THERE PROTECTIONS & TROUBLESHOOTING ETC

DATA BASE CONFIGURATION, PROGRAMMING, SYSTEM ADMINISTRATION, MMI CONFIGURATION, CONTROLLER TUNNING OF GAS TURBINE PACKAGES INCLUDING DLN COMBUSTION CONTROL, TVAS & TURBINE SUPERVOISORY INSTRUMENTS & BOP PLANT EQUIPMENT LIKE FUEL GAS REDUCING STATION, FUEL GAS COMPRESSORS, COOLING WATER SYSTEMS, DM WATER SYSTEMS, H2 PLANT, NITROGEN PLANT, CO2 PLANTS.

TURBINE SUPERVISORY EQUIPMENTS FOR GAS TURBINE.

DESIGN REVIEW, INSTALATION AND COMISSIONG FOR TURBOVISORY INSTRUMENTS SUCH AS HP TURBINE EXPANSION SENSOR, LPTE SENSORS, AXIAL SHIFT SENSORS, BEARING / SHAFT VIBRATION SENSORS, HALL PROBE SPEED SENSORS, BRWON SPEED SENSORS, TURBINE OVER SPEED SETTING AND CONFIGURATION OF TURBINE SUPERVISORY INSTRUMENTS IN BENTLY NEWDA AND VIBROMETER SYSTEMS.

TGVAS/ST VAS : INSTALATION AND COMISSIONING OF BENTLY NEWDA 3500, VIBROMETER VM 600 FOR VIBRATION MONITORING SYSTM FOR STEAM TURBINE, GAS TURBINES., BOILER FEED WATER PUMPS, CONDENSER EXTRACTION PUMPS, ID FANS & FD FANS.

GENERATOR CONDITIONING ONLINE MONITORING SYSTEM : DESIGN DOCUMENST REVIEW AND COMISSIONING OF PD CHECK, GCM, Gas monitoring systems and there controls

BALANCE OF PLANTS : [ ALLEN BRDELY PLC & SIEMENS S-7 SYSTEMS ) DESIGN & ENGINEERING DOCUMENTS REVIEW, INSTALLATION AND COMMISSIONING OF I&C PACKAGES FOR FUEL GAS COMPRESSORS, FUEL GAS REDUCING STATION, WATER BATH HEATERS,FILTERS AND SCRUBBERS, COMMISSION OF TMR ESD SYSTEMS ( GE MARK VIE ) .

2.

Years

Position

Company Name & Location

Nov 2001 to 2007

Sr. Instrumentation Engineer

Saline Water Conversion Corporation, Kingdome of Saudi Arab.

Power Plant Capacity: 5* 150MW, 10 DESALINATION UNITS-COMBINE CYCLE POWER PLANTS - SIEMENS DCS -TXP SYSTEMS

DESIGN, ENGINEERING, DESIGN DOCUMENTS REVIEW, INSTALATION,COMMISSIONING, MAINTENANACE, PROCUREMENTS, MAKING TENDER DOCUMENTS, QUOTATION EVALAUTION, SYSTEM ADMINISTRATION, MMI CONFIGURATION, CONTROLLER TUNNING LIKE BOILER AND TURBINE CONTROLS IN POWER & DESALINATIO0N PLANTS IN TELEPERM –XP DCS SYSTEM INCLUDING TROUBLE SHOOTING.

STAEM TURBINE IS CONTROLLED BY SYMADYN CONTROLLER .

DESIGN DOCUMENST REVIEW, HAVING KNOWLEDGE OF TROUBLESHOOTING, EDITION, MODIFICATIONS, SOFTWARE UPLOADING, DOWNLOADING, FACT FINDINGS IN SYMADYN SIEMENS TURBINE CONTROLLER.

TENDER DOCUMENTS & QUOTATION EVALUATION- COMMISSIONING ACTVITIES .

Tender Documents for C&I /DCS : Making Tender documents for power plant instrument and control systems& DCS system for Gas fired Boilers and Steam turbines- for 5* 150 MW sets and 10 desalination plants .

Design, engineering documents review as per process and Control requirement, P&ID evaluation and correcting as per tender documents & review of logic diagrams and later on implementations.

Bid Evaluation for C&I / DCS/PLC : Direct involvements in evaluation of Bid package for instrumentation and control/DCS system in Power and desalination plants (SWCC Plants). Evaluation of bid packages done for 150 MW & 10 Desalination Units. Based on financial minimum and compliance with technical specification contract awarded.

COMISSIONING MEETING: Attending the daily commissioning meeting with various disciplines in order to dissolve the commissioning issues and expedite the commissioning activities for TXP SIEMENS DCS systems

Day to Day involvement in cold/ dry loop checks & hot loop checks for GT and Boiler controls in TXP SIEMENS DCS SYSTEMS.

Permissives, interlocks and protections checks for TG & Boiler – desalination units and putting machine up TO 100 % Load.

Attended the comments resolution meetings with vendors during design stage in order to dissolve the technical issues in compliance with technical specifications for TXP SIEMENS DCIS systems.

.DESALINATION PLANTS : 10 UNITS : TENDER DOCUMENTS, QUOTATION EVALUATION, DESIGN DOCUMENST REVIEW AND LATER ON INSTALATION AND COMISSIONING OF INSTRUMENTATION AND CONTROL/ DCS systems for DESALINATION PLANTS FOR TXP DCS SYSTEM.

VIBRATION MONITORING- PROTECTION AND ANALYSIS SYSTEMS FOR DESALINATIO PLANTS :

MAKING TENDER DOCUMENTATAION, BID EVALUATION, DESIGN DOCUMENST REVIEW - INSTALATION AND COMISSIONING VIBROMETER VM 600 & ENTEK IRD ROCKWELL AUTOMATION USA FOR VIBRATION MONITORING SYSTM FOR DESALINATION PLANT INCLUDING COOLING WATER PUMPS, SEA WATER PUMPS, BLOW DOWN PUMPS, DISTILATE WATER PUMPS, AUXILIARY COOLING WATYER PUMPS, BOILER FEED WATER PUMPS, CONDENSER EXTRACTION PUMPS, ID FANS & FD FANS.

3.

Years

Position

Company Name & Location

May 2010 to 2013(Continew )

Generation Engineering specialist/Manager .

Suadi Electricity Company, Dammam SEC Hq. Kingdome of Saudi Arab.

Capacity: 15* 128 MW GAS TURBINE, 5* 250 MW STEAM TURBINES, 4* 128 MW GAS TURBINE AND DESALINATION PLANTS.

Position : Power Plant Specialist.(-INSTRUMENTATION AND CONTROL/DCS )-

JOB INVOLVES MAKING TENDER DOCUMENTS, BID EVALUATION, DESIGN, ENGINEERING REVIEW DOCUMENTS AND AFTER THAT INSTALATION AND COMISSIONING OF INSTRUMENTATION AND CONTROL /DCS /ESD /PLC SYSTEMS FOR OPEN CYCLE AND COMBINE CYCLE POWER PLANTS - STEAM TURBINES – GAS TURBINES- HRSG PACKAGES- BOP PLANTS-DESALINATION PLANTS

TENDER DOCUMENTS FOR C&I /DCS : DIRECTLY INVOLVED IN PREPARATION OF TECHNICAL SPECIFICATION FOR INSTRUMENTATION AND CONTROL SYSTEM /DCS FOR 15* 128 MW SETS GAS TURBINE, 5* 250 MW SETS STEAM TURBINE & BALANCE OF PLANTS LIKE FUEL GAS COMPRESSORS, FUEL GAS SYSTEMS INCLUDING FUEL GAS REDUCING STATION, WATER BATH HEATERS, OIL BATH HEATERS,SCRUBBERS AND FILTERS AND TMR ESD SYSTEMS AND DESALINATION PLANTS.

BID EVALUATION FOR C&I / DCS/PLC: DIRECT INVOLVEMENTS IN EVALUATION OF BID PACKAGE FOR INSTRUMENTATION AND CONTROL/DCS SYSTEM IN SAUDI ELECTRICITY COMPANY FOR 15* 128 MW SETS GAS TURBINE ( 7FA MACHINE ) 5* 250 MW SETS STEAM TURBINE- DESALANITION PLANTS & BALANCE OF PLANTS .

BASED ON FINANCIAL MINIMUM AND COMPLIANCE WITH TECHNICAL SPECIFICATION CONTRACT AWARDED

GE MARK VIe DCS SYSTEM : . ENGINEERING – DESIGN DOCUMENTS REVIEW & COMISSIONING OF MARK VI e DCS SYSTEMS FOR 15* 128 MW SETS GAS TURBINE & BALANCE OF PLANTS EQUIPMENTS.

DCS PACKAGE : ENGINEERING, DESIGN OF HARDWARE INCLUDING I/O MODULES, PROCESSORS, CONTROLLERS, WORK STATION, SERVERS, HISTORIANS, ENGINEERING STATION REQUIRED FOR 15* 128MW GT SETS AND 4* 128 MW SETS.

COMISSIONING ACTVITIES :ATTENDING THE DAILY COMMISSIONING MEETING WITH VARIOUS DISCIPLINES IN ORDER TO DISSOLVE THE COMMISSIONING ISSUES AND EXPEDITE THE COMMISSIONING ACTIVITIES FOR MARK VI e GE DCS SYSTEMS.

DAY TO INVOLVEMENT IN COLD/ DRY LOOP CHECKS & HOT LOOP CHECKS FOR GT Controls MARK VI E SYSTEMS including MARK VI e DCS system.

LEADING AND GIVING DIRECTION TO INSTRUMENTATION AND CONTROL TEAM AND ALSO OTHER DISCIPLINE TO EXPEDITE THE COMMISSIONING ACTVITEIS.

HRSG PACKAGE : DESIGN & ENGINEERING DOCUMENST REVIEW, FOR HRSG BOILERS PACKAGE FOR COMBINE CYCLE IN ORDER TO MEET COMPLETE REDUNDANCY FROM FIELD INSTRUMENTS TO I/O MODULES INCLUDING PROCESSORS AND UDH & PDH DATA HIGH WAY BUSES, TMR SYSTEMS FOR STEAM TURBINE CONTROL SYSTEMS AND DMR SYSTEMS FOR BOILER AND DESALAINATION PLANT CONTROL SYSTEMS FOR MARK VI E DCS systems.

ATTENDING THE COMMENTS RESOLUTION MEETING WITH VENDORS IN ORDER TO DISSOLVE THE TECHNICAL ISSUES IN COMPLIANCE WITH TECHNICAL SPECIFICATIONS FOR MARK VI E GE DCS SYSTEMS WHILE P&ID REVIEW AND LOGIC DIAGARMS DOCUMENTS REVIEW FOR OPEN AND COMBINE CYCLE PLANTS OF 5 * 250 MW SETS AND 15* 128 MW SETS INCLUDING DESALINATION PLANTS.

GAS TURBINES:: DESIGN & ENGINEERING DOCUMENST REVIEW, OF GE MARK VI e TURBINE CONTROL SYSTEMS FOR 15 * 128 MW ( GAS TURBINE ) SETS., 4* 128 MW sets AND 5* 250 MW SETS STEAM TURBINES. .

GAS TURBINE CONTROLS : LOAD CONTROL, SPEED CONTROL & THERE PROTECTIONS & TROUBLESHOOTING ETC

DATA BASE CONFIGURATION, PROGRAMMING, SYSTEM ADMINISTRATION, MMI CONFIGURATION, CONTROLLER TUNNING OF GAS TURBINE PACKAGES INCLUDING DLN COMBUSTION CONTROLS, TVAS & TURBINE SUPERVOISORY INSTRUMENTS & BOP PLANT EQUIPMENT LIKE FUEL GAS REDUCING STATION, FUEL GAS COMPRESSORS, COOLING WATER SYSTEMS, DM WATER SYSTEMS, H2 PLANT, NITROGEN PLANT, CO2 PLANTS.

TURBINE SUPERVISORY EQUIPMENTS FOR GAS TURBINE.DESIGN DOCUMENST REVIEW, INSTALATION AND COMISSIONG FOR TURBOVISORY INSTRUMENTS SUCH AS HP TURBINE EXPANSION SENSOR, LPTE SENSORS, AXIAL SHIFT SENSORS, BEARING / SHAFT VIBRATION SENSORS, CONFIGURATION OF TURBINE SUPERVISORY INSTRUMENTS IN BENTLY NEWDA SYSTEMS FOR 15*128 MW sets &4 * 128 MW sets..

GENERATOR CONDITIONING ONLINE MONITORING SYSTEM : DESIGN, DOCUMENST REVIEW AND COMISSIONING OF PD CHECK, GCM, Gas monitoring systems and there controls for 15* 128 MW sets and 4* 128 MW sets.

CONTROL ROOM, OPERATING CONSOLE ESIGN : THE CONTROL ROOM AND OPEARTING CONSOLE DESIGNED FOR 15* 127 MW SETS GAS TURBINE AND 5*250 MW STEAM TURBINE INCLUDING DESALINATION PLANTS FOR QURAYYA POWER PLANTS SAUDI ARAB. THE CONTROL ROOM WAS DIVIDED IN TO THREE PARTS ; SHIFT IN CHARGE ROOM, CONTROL ROOM FOR DESK OPERATORS AND ENGINEERING/ DIAGNOSTIC ROOM FOR I&C PERSONAL/ ENGINEERS.

THE CONTROL ROOM AND OPERATING CONSOLE DESIGNED FOR 4* 127 MW SETS GAS TURBINE FOR FARAS POWER PLANT IN KSA INCLUDING ENGINEERING STATION CONSOLE, SHIFT- IN CHARGE ROOM.

FOR QASSIM, WADI, ARAR POWER PLANT CONTROL ROOM AND OPERATING CONSOLE HAVE BEEN DESIGED AS PER THE REQUREMENTS.

# ADDITIONAL EXPERIENCE #

POWER PLANT OPERATION EXPERIENCE ( STEAM TURBINES ) :

Sound knowledge of operation and control of 210 MW sets and familiar with start up of units, handling emergencies in power plants, fact finding and independent operation of entire plants including Boiler & Turbine and related auxiliaries. Assistance to mechanical department for Design of Mechanical Equipments Like air compressor, Boiler feed water pumps, CEP, HP/LP Heaters, Condensers, dearators, HP/LP bypass system, governing system, turbine protection, start up interlocks for each auxiliaries like FD FANS, ID FANS etc, APRDS, HP BYPASS,LP bypass, Governing system Hydraulic and Electro-hydraulic governor systems.

POWER PLANT OPERATION EXPERIENCE ( GT/HRSG PACKAGES )

Sound knowledge of operation and control of 15 * 128 MW sets & 3 * 120 MW sets and familiar with start up of units, handling emergencies in Gas power plants, fact finding and independent operation of entire plants including HRSG & Turbine and related auxiliaries Like fuel gas compressors, fuel gas reducing station, water bath heaters, scrubbers and filters- auto control loops and logics and entire operation of fuel gas systems including Desalination plant, Desalination plant Auto controls systems and protections .

Assistance to mechanical department for Design of Mechanical Equipments Like Fuel gas reducing station, fuel gas compressors, Air compressors, Hydrogen plants requirements, DM water requirement and WT plant design, CO2 plant design, fire and alarm system, fire protection etc.

ABB MAKE : PLANT PERFORMANCE & OPTIMIZATION PACKAGE (GAS & STEAM TURBINES/ BOILER ).: Good knowledge of power plant efficiency package and how to optimize the plant at operating standards parameter s. calculation of HP. LP. IP turbine efficiency, heat rate, grosses heat rate, condenser cleanness factor, Boiler efficiency, Air heater efficiency etc. efficiency of ID/FD fans. HP/LP heaters including Gas Turbine efficiency package.



Contact this candidate