Curriculum Vitae
Position applied civil site supervisors
Career Summary
• 19 years GCC experience on Buildings (including high rise tower), Reservoir and pumping stations bridges, Cricket Stadium Villa Projects both Civil and Finishing works. Experience on Civil works such as earthmoving, blinding concrete works, rebar work, shuttering and concreting works and Fishing works such as block works, plastering render works, tiling and painting works cladding (roofing)works backfilling exvation With Good Communication skill both English and Hindi and Arabic language. Can work with a least supervision. Summary of Experience:19 year GCC
A. Company: Habtoor Leighton Contracting W.L.L. - Qatar Project: Duhail and Umm Qarn Reservoir Project
Owner/Client: Qatar General Electric and Water Corporation (KAHRAMAA) Consultant: KEO Consultant
Project Value: 800 Million Qatari Riyal
Duration: May 2010 to Sep 2013
Position Held: Site Supervisor
B. Project: People Movers System (PMS)
Owner/Client: Qatar foundation
Consultant: parson
Project Value: 600 Million Qatari Riyal
Duration: Sep 2013 to Sep 2015
Position Held: civil Site Supervisor
C. Project: Mega Reservoir
Owner/Client: Qatar General Electric and Water Corporation (KHARAMMA) Consultant: Hyder
Project Value: 605 US Million
Duration: Sep 2015 to 10 July 2019
Name: Jawed Akhtar
Mob: 009**********
Email: ********@*****.***
********@*****.***
********@*******.***
Position Applied: Superintendent (Civil)
Position Held: Sr Site Supervisor civil
Duties and responsibility:
Supervise/Execute construction of reservoir and valve chambers. Make sure that rebar Installation conforms to the design and specification standard. Coordinate with the Project Superintendent to ensure that project accomplishment is on time as per Schedule Coordinate with the QA/QC to ensure that prior to de-shuttering works Strength of concrete complies the specification. Make sure that letter of undertaking for Scaffolding has been signed prior to casting of concrete for the roof slab. Prepare daily Report for manpower and equipment utilization.
B. Company: ALDAR Laing O’Rourke Abu Dhabi UAE
Project: B+G+15 Floor bldg. (Al Bandar) Al Raha Beach Development Consultant: Keo Consultant
Project Value: 800 Million
Duration: April 2007 to April 2010
Position Hold: General. Foreman (Civil)
Duties and responsibility:
Supervise Execute Civil works and finishing works for buildings. Do the finishing work
(Block works, plaster render, tiling works).Coordinate with the Site Engineer to ensure that the project in on time as per schedule. Arrange manpower allocation for every activity and give instruction to the site foreman. Make sure that the work done is as per drawing and specification. Coordinate with QA/QC any inspection for every activity done on site. Prepare daily report for manpower and equipment utilization and submit to the Site Engineer.
C Company: Al Habtoor Engineering Enterprises Co. LLC UAE Project 1 B+G+51 Floor at Sheikh Zayed road, Business Bay 11 Tower Consultant: Dar Consultant
Project Value: 965 Million
Duration: 2005 to 2007
Project 2 B+G+M+45 Floor Jumaira Beach Residency (JBR-4) 8 Towers Consultant: Arif Bin Toak
Project Value: 785 Million
Duration: 2003 to 2005
Project 3 Sheikh Zayed Cricket Stadium (Abu Dhabi) Duration: 2002 to 2003
Project Value: 860 Million
Project 4 G+2 Floor (200 Villa Project), Abu Dhabi Project Value: 745 Million
Duration 2000 to 2001
Position Hold: Steel fixer Foreman
Duration: 2000 to March 2007
Duties and responsibility
. Follow the Structure work.
. Follow the Inspection for the Structure work (Column, Shear wall, Retaining wall, Staircases, Slab, Steel and make Sure the extra Top and Bottom steel bars is fixed Properly with Consultant and Project Engineer
. Labors and Equipment distribution according to requirement for all the villa building And submit report for it Project Engineer.
. Make sure availably of material, machines and labors for the project. Studies Project drawings and specifications and other documents from the planning of Works view.
Check the bar bending schedule and make sure all steel is correct.
. Coordinate with MEP, Subcontractors and other foreman.
. Submit the actual site progress report to planning Engineer to prepare monthly and Weekly report for the meeting
. Do the needful to avoid unnecessary overtime for labors.
. Follow all type of steel work and involve in many activities at site. Personal Details:
Date of Birth : 07 July 1972
Qualification : Secondary (Metric)
Nationality : Indian
Marital Status : Married
Passport Details:
Passport No : T8259377
Date of Expiry : 24/05/2029
Qatar DL. : 21/08/2022
Jawed Akhtar Mobile No. 77027217