CURRICULUM VITAE
MUHAMMAD SHER KHAN
EMAIL: ********@*****.***
Mobile: 009***********
EMAIL: *********@****.***
Objective:
Experience:
To Work On Prestigious Civil Engineering Project, Utilizing State Of The Art And Computer Based Project Management Techniques To Its Timely And Successful Completion with use of Latest Digital Survey Instruments Like Total Station, Lasers And GPS etc .
Survey Instruments Utilized during 14 years experience.
Utilized 21 different Digital Survey Instruments Experience.
Organization
PROGER ENGINEERING & MANAGEMENT.
Organization Type
CONSULTANT
Designation
Surveyor
Location
SAUDI ARABIA
Type of Experience
Full Time
Tenure
09 JUNE, 2014 TO till Date
Description
ORGANIZATION
Responsibilities:
A: Establishing primary horizontal and vertical control points including reference ties for re-establishing the points in the field.
B: Reporting discrepancies or technical problems.
C: Maintaining equipment in proper condition and perform frequent calibration checks.
D: Interpreting scale drawings.
E: Monitoring and arranging surveying instruments for calibration and ensure all surveying activities are performed effectively, both topography and geodetic.
F: Creating chaining notes and line sketches.
G: Responsible for field survey data.
E: Keeping up to date with relevant technologies within the Surveying field, Total Station. Leica, Mica etc.
Organization
AL KHAFJI JOINT OPERATIONS PROJECT.
UNITED TURKISH CONSTRUCTION
Organization Type
Construction
Designation
Surveyor
Location
SAUDI ARABIA
Type of Experience
Full Time
Tenure
05 NOVEMBER, 2011 to till 15 JAN 2014
Description
ORGANIZATION
CONSULTING
SCEC
ORGANIZATION
CLINT
Responsibilities:
A: Stake Out The Center Line For Different Activities
B: Calculations Of Levels According To Design And Preparing.
G Of Reaches (Fillings, Sub Grade, Water Bound Macadam)
C: Calculation Of Quantities &Making Running Bills
D: Supervision &Management Of Site
E: Control All Survey Activities According To Design and Specifications
F: Making Cross Section On Auto Cad and calculating of cut/fill Quantity.
G: Dealing With Sub – Contractors And Consultants
E: Calculations for all setting out and earthworks for construction
F: Setting Out for Conveyors and Slabs, including foundations, pedestals and holding down bolts.
G: Alignment and leveling for installation of Ball and Sag Mills
H: Aligning Steel work for conveyors and milling plant structure.
J: Keeping of records for survey and QA purposes. Positioning Systems: GPS, DGPS, RTK, Electromagnetic And Conventional Systems (Linear and Angular Measuring Equipment and EDM systems)
Bathymetric Systems: Analog, Digital echo-sounding systems and Multibeam sounders.
Sonar Systems: Analog and digital Side Scan Sonar systems.
Current Meters and Profilers, Motion Sensors and Velocity meters.
Total Station and Level.
Position Processors: Leica’s - Differential Post Processing System- SKI, SKI-Pro, and Geo office using both broadcast and precise ephemeris with RINEX, Datum and Map, Network Adjustment options and COGO, Trimble and Sercel data processing software.
Organization
NAMKWANG INTERNATIONAL E & C
Organization Type
Construction
Designation
Survey Engineer
Location
ANGOLA LNG PROJECT UNDER THE BECHTEL
Type of Experience
Full Time
Tenure
March 26th,2009 to 17Jun 2011
Description
ORGANIZATION
CONSULTING
CLINT
Major contribution as a key player in the strategic business operation planning, organizational structural development, and corporation’s business execution tactics during the crucially significant startup phase
1: G.P.S (Global Positioning System) Leica Gps System 1200 with Real Time Device (Rtk) Accuracy 1cm, Magelian, Nav .Dnlx-10, Sport rake (Pocket Size)
2: Total Stations Leica Tc 1800, Tc 1103, Sokkia Set 2c, Set 4c, Set 5f, Set 6f, Topcon Gts 100, Gts 101, Gts 102
3: Lasers: Laser Llp -670, Laser Plan (Javelin-S Leica)
4: Digital Theodolites Topcon Dt 104, Dt100, Sokkia Dt5, Dt6
5: Trimble S3 total station
Responsibilities
A: To Establish Main Control Points With GPS 1200 System of Leica Using Rtk Survey Technique.
B: Stake Out R.O.W (Right Of Way) With GPS
C: To Stake Out Centre Line for Pipe Line by Total Station.
D: Calculating All Stake Out Data For R.O.W, Pipe Centre Line And For Haul Road
E: To Calculate Level According To Design Profile Of Haul Road
F: Making Travers For Primary Control Points
G: Laying Of Control Points Along Trench (By Traversing)
H: Receiving Of Trench From Sub Contractor According To Specification &Design.
I: To Handle All Matters Related With Survey
J: Supervise All Survey Activities & Fix Duties Of Survey Team
K: Making All Scope Drawings, Cross Sections And Cut / Fill Quantities Of Haul Road By Auto Cad.
H: Traverse adjustment and T.B.M,s Fixing.
M: Demarcation of plot corners.
N Marking of Gate levels and building corners for excavation.
O: Marking of building Layout for the column location
P: Making the drawings in Auto CAD by data collected from The field.
Q: Preparation of as built Drawings.
R: Performing every type of survey activities required for the
development of infrastructure, roads and drainage
Organization
National Construction LTD
Organization Type
Construction Engineering
Designation
As a Survey Site Inspector
Location
Ministry of Housing work mechanical Tanks
Type of Experience
Full Time
Tenure
01th jan, 2007 to 8th oct, 2008
Description
ORGANIZATION
CONSULTING
CLINT
Responsibilities
A: To Stake Out Centre Line For Pipe Line By Total Station,
B: Laying Of Control Points Along Trench (By Traversing)
C: Receiving Of Trench From Sub Contractor According To Specification &Design.
D: To Handle All Matters Related With Survey
E: Supervise All Survey Activities & Fix Duties of Survey Team
F: Lay out for all structure Like turnouts, Blow off, water camel points, etc.
Responsibilities:
A: Selection Of Route For Pipe Line (Rout Survey) By Global Positioning System (G.P.S)
B: Making Stationing And Reading Profile On Selected Route.
C: Making Plan Of Crossings And Draw Profile
D: All Other Survey Activities For Required For Design of Rout
E: Collecting All Topography Detail along the Selected Rout
Organization
Hussnain Cotex Limited (joint-Venture Ikan Eng. Services)
Organization Type
Construction
Designation
Surveyor
Location
Islamabad, Pakistan
Type of Experience
Full Time
Description
ORGANIZATION
CLINT
Responsibilities:
A: Stake Out The Center Line For Different Activities
B: Calculations Of Levels According To Design And Preparing.
G Of Reaches (Fillings, Sub Grade, Water Bound Macadam)
C: Calculation Of Quantities &Making Running Bills
D: Supervision &Management Of Site
E: Control All Survey Activities According To Design and Specifications
F : Making Cross Section On Auto Cad and calculating of cut/fill Quantity.
G: Dealing With Sub – Contractors And Consultants
Organization
Technical Associate Pakistan Pvt. Ltd (Pakistan)
Organization Type
Consultant
Designation
Sit Surveyor
Location
RESIDENCIAL COMPLEX IN SHEIKH ZAID PALACE
RAHIME YAR KHAN PUNJAB (PAKISTAN)
Type of Experience
Full Time
Description
ORGANIZATION
Client: SHEIKH ZAID BIN SULTAN AL NYAN (LATE PRESIDENT OF U.A.E &RULER OF ABU DUBI)
Responsibilities:
A: Supervise The Site, Manage All Activities Of Site, Arrange Manpower Required for Site
B: Supervise All Finishing Activities (Marble, Tiles, Plaster, Paint And Polishing Of Marble Etc.
C: Control The Site And Arrange All Required Material.
D: Dealing With Sub Contractor and Consultants.
E: Layout of building and control level of foundation.
F: Control All Survey Activities According To Design and Specifications G: Preparation of filling reaches and grading for Sub grade, sub base and base
H: Stake out all curve and straight lines
I: Control elevation according to design and making traversing for control points.
computer
Skills
Skill Name
Level
Last Used
Internet Usage
Good
Currently Working
Auto cad land survey networking instilling programs and other related work of offices and accounts.
Good
Currently Working
Personal information:-
Date of Birth: 09-11-1975
Material Status: Married
Nationality: Pakistani
Religion:
Additional Knowledge: I Also Do Data Load Down Load in Memory Card (Pcmcia) By Computer through Omny Drive And Also upload
and down load Survey data in GPS 1200 (for stake out and design, also work as a documents controller
Education:
1 years, Diploma in civil Surveying PMDC SURVEY INSTITUTE
1995
Metric Punjab board
1999
FA Punjab board
2000
COMPUTER DIPLOMA Punjab board
Languages:
URDU, English, Punjabi,, Arabic.
To play a leading role in the civil construction sectors, particularly in oil plaint, Highways, Additional Carriageways, Motorways, Bridges, Development of Housing Schemes airport building, making a major contribution towards the development vision, mission, strategies and manpower control Ensuring the continuous business growth inline the company mission.