William E. Fiscus Senior Electrical Designer

Last recent employment – Iron Mountain Management – Washington State

Senior Electrical Designer – Worked at Enercon Services in Naperville, Ill. 6/04/18 to 7/13/18

Worked as a substation instrumentation designer on ComED substations Sayer and Evergreen Park.

Semi-Retired Presently

Worked from home as an independent contractor doing E&I work for various firms while assisting with an extremely ill son.

AMECFosterWheeler-Atlanta, Georgia 10/01/2015 to 03/18/2016

Senior Electrical Designer - Responsible for design and drafting for 34.5 KV polelines from solar field to substation including all materials needed for installation of steel and wood poles for two projects.

VALERO REFINERY-MCKEE: - DUMAS, TE\AS 12/01/2014 TO 9/30/2015

Senior Electrical Designer - Responsible for designing, drafting and preparing drawings using AutoCAD. Used Microsoft Excel for Connected Load applications. Prepared Single Line Schematics and Heat Trace Drawings along with any associated detail drawings. Provided walk- downs and eyes on for many electrical projects.

Willbros- New Orleans, Louisiana 09/2013 to 07/2014

Lead I&E Designer - Responsible for designing, drafting and preparing drawings using AutoCAD and specifying instruments needed for various projects using Microsoft Excel for Chevron Oronite, Conoco-Phillips, Phillips-66, and IMTT. This included both electrical and instrumentation for all projects with eyes on inspections and walk clowns of the projects at above locations. Involved in the electrical/instrumentation checking of projects as well. Ryan Christopher

STSI- Tcsscndcrlo-Kerley Services- Carlsbad, New Mexico 01/2013 to 06/21/2013

Senior Electrical Designer - Main responsibilities were drawing revisions on plant drawings, heat tracing. cable tray layouts, motor schematics, single lines, motor schematics, lighting and grounding at Barrack, Hanford, and Wynne plants.

STSI- C& I Engineering- Louisville, Kentucky 07/2012 to 12/2012

Senior Electrical Designer - Projects included several parts of marathon refineries mostly Robinson & Cattlesburg. Responsibilities include working on substation replacements such as circuit breakers, motor control centers, & switchgear, 12kv, 69kv, 2400kv. Also worked on the feeders for the different size motors, 240vac to 1200vac. That includes adjusting relays and DCS. In addition, I've done some grounding layouts. AutoCAD

Southern Synergy, Inc. – Decatur, Al. 11/2002 to 01/2012

Senior Electrical Designer – Responsibilties included walkdowns of industrial plants such as BP Chemicals, Vollara Refineries, 3M, Daiken America and others.

Bechtel Corporation – Athens, Al. 03/2002 to 11/2002

Senior Electrical Designer - ·Responsibilities included development of Design Change Authorizations. Design change packages. changes to drawings.

State Engineering Co., Inc. – Decatur, Al. 1997 to 2002

Electrical/Instrumentation Designer - Responsibilities included field verification, design, drawing preparation. as built follow-up of electrical instrumentation and controls for several petrochemical plants.

Proctor & Gamble, Jackson, TN 1994 to 1996

Senior Electrical Designer - Responsibilities included design and supervision of installation of instrumentation and controls for production, packaging and conveying system.

Bechtel Power Corporation- Browns Ferry Nuclear Plant- Athens, AL 1991 to 1994

Senior Electrical Designer - Responsibilities included preparation and checking of Design Change Notices (DCN's), Field Design Change Notices (FDCN's), etc.

Schneider Engineers, Inc.- AEP Corp. & Columbus & Southern Power Co. Columbus, OH 1988 to 1991

Electrical Designer - Responsibilities included design, overhead line material requirements. and tracking, preparation and checking of all phases of instrument & electrical drawings.

Rapid Design Service, Kellogg Corp. Battle Creek, MI 1987 to 1988

Electrical Designer - Responsibilities included design, preparation and checking of physical electrical drawings, fire protection systems and installation supervision associated with construction of a new product production line.

Bechtel Power Corp., Ann Arbor, Ml 1981 to 1985

Electrical Designer - Responsible for design, preparation and checking of physical electrical drawing associated with fossil and nuclear power plants and their substations. Additional responsibilities included physical walk downs of equipment and raceways at client facilities. Also assigned to Midland Nuclear Power Plant as a Field Engineer responsible for review or FCN's. FDCN's, DCN's and FCR's.