DOMINIC JONAS G. TANCUECO
Address : *** ******* *, ********** ****
Mobile Number : +639*********
Email Address : *.*************@*****.***
SKILLS SUMMARY
Strong interpersonal and organizational skills with a keen ability to multitask a variety of challenges and responsibilities. A team player and can easily adapt to different working environment.
WORKING EXPERIENCE
Autocad Operator
PHPC Ltd. Co. Inc.
6788 Bldg. Ayala Ave. Makati City
April 2019 - Present
Responsibilities
-Preparing As-built for client (MEPFs)
-Do site visit for the progress of the drawings and forsite inspection
Design Engineer
Electrical Equipment System Integration (EESi)
Road 20 General Ave. Project.8 Quezon City
October 2018 - April 2019
Responsibilities
-Preparing proposal design that will send to the client about electrical instruments
-Coordinate with the respective estimate team fro the instrument list
-Do some site inspection before preparing the proposal drawing
-Meeting with client and engineering team about the preparation of design for the project
-CoordInate with the operation team for implementing the design
QA/QC Inspector / Autocad Operator
Electrical Equipment System Integration (EESi)
Road 20 General Ave. Project.8 Quezon City
July 2017 – October 2018
Responsibilities:
- Coordinate with the panel assembly team for the availability of all client approved drawings
prior to implementation and stamp the documents appropriately either for construction use of for FAT use
- Coordinate with the respective project team members for material preparation and tallying of panel major and system hardware items
- Inspect and evaluate the material specifications and quantity after installation based on the Bill of Materials of the approved documents; generate a record list of item’s serial number for
future reference
- Raise concerns to respective engineers for material tally & specifications discrepancy
- Inspect proper component installation, labelling and tagging based on the approved layout and
wiring diagrams
- Observe the performance of wiring continuity check before power-up of panels
- Participate in the system check and evaluation of the functionality of all devices installed during
power-up
- Conduct regular inspection during and after assembly/installation activities and generate a
record (punch-listing) of all observable defects either in the quantity of items, pending works,
functionality of devices, and the overall appearance of the installation
- Check the availability of all test record documents prior to delivery
- Evaluate site installations and field wiring terminations based on the approved drawings
- Generate and submit punch point list based on inspection, and
- Conduct re-inspection after punch points have been resolved by the responsible project
engineers
- Same duties may also be required for instrumentation installations
- Prepare As-built and propose drawings for the client.
Projects held:
-Maynilad Ermita Pumping Station- July 2017 – Present
-Maynilad Arroceros Development Plan Phase 2- July 2017 - Present
-Manila Water North & South Pasig Sewage Project- July 2017- Present
-Maynilad Primary Valve- July 2017- Present
-Maynilad Aguinaldo Reservoir & Pumping Station- July 2017- Present
-PMFTC Marikina- July 2017- Present
-Maynilad Binuksuk Water Reservoir- July 2017 – Present
-Maynilad La mesa Project ( North A, North ABC, North C annex)- July 2017 - Present
Autocad Operator
Electrical Equipment System Integration (EESi)
Road 20 General Ave. Project.8 Quezon City
July 2016 – July 2017
Performing 2D/3D, Isometric and sketch-up drawing for as-built and proposal drawings.
Project held:
-Avida Primetaft- July 2016 – January 2017
-Maynilad Ermita Pumping Station- January 2017 – July 2017
-Maynilad Algeciras Pumping Station- January 2017 – July 2017
-Maynilad Arroceros Development Plan Phase 2- January 2017 – July 2017
-Manila Water FTI Septage Treatment Plant- January 2017 – July 2017
-Manolo Fortich Hydro Electric Power Plant- May 2017 – June 2017
-Maynilad FTI Water Treatment
Junior Maintenance Technician
Lloyd Laboratories,
#10 FBIC Tikay, Malolos Bulacan
October 2015 - April 2016
I’ve been a Maintenance technician for Electrical Engineering Department.
Responsible for fabrication of material such as stainless cover for machines and electrical works to maintain the machine performance.
Troubleshooting
Electrical wiring
Welding
Technician (Completing 450 hours of OJT)
Racal Motorcycle Corp., Balubaran Valenzuela City
November 2014 - February 2015
Assembles electric bikes and E-tricycles
Support and troubleshoots accordingly to client concerns.
CNC Operator (Completing 450 hours of On the job training)
Rosco Machine Shop & MFG., Corp., Bagbaguin Valenzuela City
June 2013 - August 2013
EDUCATIONAL BACKROUND
Advance Training: Autocad (2D & 3D)
MicroCADD Institute
May 2016 (GWA: 1.50)
College Bachelor in Industrial Technology
Major in Mechatronics Technology
Bulacan State University
City of Malolos, Bulacan
S.Y.: 2011-2015
Secondary Assembly Woman Felicita G. Bernardino Memorial Trade School
Lias, Marilao, Bulacan
S.Y.: 2006-2010
Primary Coloong Elementary School
Coloong, Valenzuela City
S.Y.: 2001-2006
TECHNICAL SKILLS
AutoCAD 2015 - 2017
Microsoft Excel
Microsoft word
Electrical
Quality assurance and Quality Control
Sketch up 2016 – 2018
Reading wiring diagram
REFERENCE
Availabe upon request.