RANEL B. MIRAL

Mechanical Engineer

+639*********;+639********* ac9qf7@r.postjobfree.com 36 years old Cebu City, Philippines

EXPERIENCE :10 years

PREVIOUS : Mechanical Engineer @ Hyundai Heavy Industries

Doosan Heavy Industries, Samsung Engineering Ltd.

EDUCATION : University of Cebu, Philippines

Professional Degree, Mechanical Engineering

CAREER SUMMARY:

A mechanical engineer with almost ten years’ experience and expertise in installing mechanical equipment, mechanical plant procedures and having effective communication abilities, seeks to work as mechanical engineer to a leading engineering organization.

EXPERIENCE:

Feb. 2015 – Apr. 2017 Mechanical Engineer (Shuqaiq Steam Power Plant - 2880 Megawatts)

(2 year 2 months) Hyundai Heavy Industries Shuqaiq, Saudi

Overall in charge in Water Treatment Plant, Balance of Plant and will oversee supervise general mechanical construction activities.

Take charge of rigging and lifting activities, material jobsite receiving and protection, foundations, mounting plate grouting, piping and coupling alignment until commissioning.

Performs inspection in mechanical works in accordance with quality requirements, method of statements and contract documents including drawings and specifications.

Conduct inspections and examination of non-conformation report, site surveillance report issued by client/owner.

Performs all equipment inspections according to permitted drawing and packing list.

Participate during final inspection for erection completion certificate which is conducted by the owner/client.

Engage in commissioning work activities generally in steam blowing, lube oil flushing and circulating cooling water chemical cleaning.

Hands on in installation of blowing kit devices in high pressure valves, low pressure valves and other bypass line.

Jan. 2012 – May 2014 Mechanical Engineer (Rabigh Power Plant II – 2800 Megawatts)

(2 year 4 months) Doosan Heavy Industries Rabigh, Saudi Arabia

Performs inspection and supervision in installation of all mechanical rotating and static equipment’s generally in BOP area.

Performs inspection in mechanical works in accordance with quality requirements, method of statements and contract documents including drawings and specifications.

Conduct inspections and examination any non-conformation report, site surveillance report issued by client/owner.

Participates in meetings and assists the project in what relates to technical matters and relationships with clients/vendors and contractors.

Ensures, in liaison with the department head, the integration of feedback, statistics and lessons learn on the project (including site feedback) in the department knowledge management base.

Determine and check during coupling shaft final alignment specifically in piping tapping connections.

Monitor and conduct inspection for all non-conformation report, site observation report.

Dec. 2009 – Dec. 2011 Mechanical Engineer (United Steel Company)

(2 years) Samsung Engineering Ltd. Bahrain

Performs in developing the commissioning plans, schedules, project startup and other field works.

Control all non-conformation report, site observation report and punch list items formerly proceeding in commissioning works.

Prepared pre-commissioning and commissioning procedures, initial startup and operating manuals, check lists.

Preparing and timely submission of daily, and weekly, monthly progress as well as forecasting and scheduling for the entire works.

Handle responsibilities of controlling and maintaining commissioning documents as well as perform functionality verification.

Contributes towards, maintaining and implement both company and client HSE management system objectives and procedures.

Jan 2007 - May 2009 Site Engineer (Qatar Fertilizer Company (QAFCO-5)

(2 years 4 months) Future Pipe Industries Qatar

Technical advisor in installation and fabrication of GRP/GRE piping.

Provide engineering expertise as accumulated from other projects to all team members and serves as a guide on technical issues.

Ensures that all methods, procedures and coordination with other disciplines are rigorously applied.

Hold point during final visual joint inspection particularly in high pressure line.

Review and comment for hydro test package ahead of hydro testing.

Assists the Project Engineering Manager and the Project Engineers on technical coordination of interfaces and identification of potential deviations or discrepancies.

Working closely with operating personnel to improve safety and equipment reliability.

PROFESSION:

Mechanical Engineer

Licensed #: 0067888

Registration date: November 2006

SKILLS:

Familiar of the principles in API and ASME standards.

Basic AutoCAD 2D – drafting

Microsoft Office – word and excel

TRAINING:

Sikadur 52 Cracks Gravity Feed Applications for Machine Foundation Cracks Repair

Training date: September 30, 2010