Post Job Free

Resume

Sign in

Budgeting, Inspections, Evaluations Mine Operations, Inspection

Location:
Bandung, West Java Province, Indonesia
Salary:
13000 USD
Posted:
June 17, 2019

Contact this candidate

Resume:

CV - TAUPIK HIDAYAT ST

MINER’S PROFESIONAL PLUS

A. CURRICULUM VITAE

1. PERSONAL INFORMATION

My Name : Taupik Hidayat,ST

Place date of birth : Jakarta, 10 April 1971

Passport ID : C3408376 (Valid Until 14 March 2024) Education : Graduate-S1, Mining Department & Technology ITB, Bandung-West Java Indonesia

Mobile Phone ;

+62-852-****-****

+62-896-****-**** (WA)

Emergency Call- +62-813****-**** (Prof Zulfiadi)

Alt-Call +62-812-****-**** (Cousin Anissa)

E-mail : ac9mky@r.postjobfree.com

ac9mky@r.postjobfree.com

Skype : live:jalarimanggeung

THE VALUE OF THE WEAKNESSES AND STRENGTH :

Weaknesses in a task that often sit on the table, the monotony and the discussion is too long. Have the strength in a varied and Integrated work who need Supervision, Control and Analysis with care with Safety and Environment according to company policies. It can also do the work of lobbying in the solve a problem existing limitation accordingly.

HOBBIES :

Go on an Adventure while my study and seek a better life on luck and learning new things related to Technologies and their use in the mining practice.

2. EXECUTIVE SUMMARY

I am a graduate of ITB Bandung, above seventeen years experience in the mining operations in Indonesia. More experienced in minerals and coal operation. Knowledge of the potential mine hazards contained therein and inspection to reduce accident. Give just my assessment of the work and provide the solution in an attempt to minimize the risk to achieve zero fatal accident and well operations mentions with mine regulations.Effective Mine Operations is must go show, lowest cost, revenue able, environment and safely. In the my spirit of professionalism, honesty, hard work, and a strong discipline was the Foundation for the realization of all of the above conditions. The desire and willingness to continually adapt and learn to build on the success and success in career on the dynamics of the company. I will give my best contribution for company in the future. Interested in companies that have a strong mission and vision for progress and prosperity with good operating in the Mining and Gas Project .

3. TECHNICAL SKILLS

Theory and Practical: Earth Moving, Blasting, Hauling, SHE, Processing and Waste Management, U/g Activity, Barging, Shipping

Knowledge : Exploration, Ssampling/bore log, Surface hazard, U/g hazard, blasting, mine environment, Konservation, Goverment and Mine Regulations. Statistical Tools : Pareto Analysis, Fishbone Diagram, Mapping, Benhmarking Management Methodologies : HSE Risk Analysis, L2RA, SWOT Analysis.Survey Software : Windows Applications, Spreed sheet, Fortran 77 4. WORK EXPERIENCE

1. Golden Pricindo Indah Project,

as General Manager Operations/deputy KTT

Period April 2018 – now

2. Mine West Java ESDM Project,

as Consultant Mine Expert

Period August 2017-Dec 2017

3. Technical Advisor in Mine Project, PT.Hisyam in Kutai Coal Project Period July 2014-Dec 2016

4. PT.Putra Mekongga Sejahtera

Mine Operations, site Pomalaa South East Sulawesi

Period Sept 2012– Jan 2014

5. PT.Gane Permai Sentosa, Obi Island

as Man Production/Deputy Site Manager, site Obi

Period Dec 2010 – May 2011

6. PT.Megah Karya

as Project Manager, Period Okt 2009 – Sept 2010

7. PT.Java Velosi Mandiri, BP West Java Project

as Sr.P/L and Riser Engineer in Asset integrity

Period Sept 2007 – Sept 2009

8. Gas Transmition Project, PT. PGAS

as PGAS/PGN Repheresentative Period April 2002 – July 2007 9. PT.DLS, Adaro Project

as Safety Officer in Site Tanjung-Warukin, South Kalimantan Period Feb 2000 – Feb 2002

5. PROJECT ACHIEVEMENT

● Completed of document “RKAB” mention with

government regulation on GPI Project.

● Completion of the Optimization product target exceeds the mine plan production in Kutai Project

● The target exceeds the production of Ni in the set, so that the incoming ship from the plan of 10 ships per year with a capacity of 110 thousand MT to 16

ships annually with the same capacity in Mekongga Project.

● Maintaining a balance between the production of mines with production plans are adjusted so that the loss of revenue

at Exportable Fine Ore/EFO can be resolved in GPS

Project.

● Zero accident achievement in Dept Productions so that the production reached the optimum results as expected.

6. TRAINING

June 2018,POM PPSDMGeoMinerba, Bandung

April 2018,POP PPSDMGeoMinerba, Bandung

Nov 2000, “Awareness Environment” Biosfer, Dahai, Adaro Feb 2000, HSE Training PPTM, Tekmira Bandung

B. SAMPLE OF ACTIVITY

C. RELEVANT OF

CERTIFICATED



Contact this candidate