ABRIDGEMENT

A focused professional with 22 years of functional experience in Production, Manufacturing, Installation, Erection, Quality and target achieving, coordination with Inspection clearing in the field of oil and gas and MEP construction, Thermal power plant manufacturing company.

Worked in Total piping installation, Structural supports, Beams, columns erecting

Coordinating with rigging team. Tie in with live pipes in oil and gas Refinery.

Riser shaft piping, Heat Exchangers, Chilled water plant room piping, Fire plant room piping, Dry and Wet raiser shaft piping, PRV Station, Firefighting system, sprinkler system, Gaseous suppression system for Electrical substation, HVAC System,Water balancing, Air balancing, Plumbing,Sanitary and Drainage system, RO plant, ETP plant, waste water treatment plant installation including SS,FRP,CPVC Piping. Dosing system package. Generators, Compressor erecting, fuel oil piping, High pressure pumps vertical and horizontal, PD pumps, Pneumatic pump installing, Hydro and Pneumatic testing. Welding standards and welding techniques follow up in MEP construction.

Pressure and non-pressure parts manufacturing for Power plant

Expertise in ramping up projects, competent cross-functional skills with emphasis on multi discipline coordination in project management. Hold the distinction of executing numerous projects of diversified nature across the career span. Multi-tasking professional, adept at work in high pressure environment with strict deadline and multiple deliverables. Respond well under pressure with a proven ability to liaise in a confident and articulate manner at all levels In depth knowledge of project technical inspection, contracts documents, scope of work, attending minutes of meetings, Procurement methodology, QA/QC test follow up and documentations. Excellent relationship management with the ability to network with the project members, Consultant, contractor, Inspector with consummate ease.

Well versed with Preparation of Procedures, Method statement, JSA, Inspection & Test Plan, Weld Plan, PQR & WQT. Familiar with ASME, API, ANSI, AWS, BS, RINA and other internationally utilized Codes and Standards.

EDUCATIONAL:

Qualification : Bachelor of Technology B.Tech

Rajasthan Vidyapeeth University.

Rajastan.

Qualification : Diploma in Mechanical Engineering DME

Institution : Kalaivanar N.S.Krishnan polytechnic.

Nagercoil.

Year of passing : April, 1997.

COMPUTER SKILLS : Higher Diploma in Software Engineering (HDSE).Aptech – Nagercoil.

PERSONAL PROFILES:

Nationality : INDIAN

Religion : Christian.

Marital status : Married.

Passport details : P8428423 Issued in India (valid till 29 mar 2027)

Language known : Tamil, English, Hindi and Malayalam.

Permanent Address : Plot-18, 5th Street,

Arasu colony, Edamalaipattipudur,

Tiruchirappalli – 620012, Tamil Nadu, INDIA.

Phone No: +91-989*******.

EXPERIENCE CHRONOLOGY

Name of Employer : QATAR KENTZ W.L.L.

Period : FEB 2015 – APRIL 2019.

Designation : SITE MECHANICAL SUPERVISOR.

PROJECT : ZERO LIQUID DISCHARGE PROJECT (ZLD)

PROJECT : WASTE WATER RECYLING

REDUCTION PROJECT. (WRRP)

MAIN CONTRACTOR : QATAR GAS SITE @ RAS LAFFAN INDUSTRIAL CITY

CLIENT : QATAR GAS

MY ROLL :

Installation of Gaseous suppression system NOVEC 1230, FM200 for Electrical substation with related piping and Nozzle assembly.

Installation of AHU and accessories for HVAC system in substation.

Installation of ACCU 40T*8 Air cooled condensing units, related copper piping for refrigeration system.

SS piping for RO system and media filters.

Rigging and Installation of structural beams and supports for Drums and piping.

Hydro and Pneumatic test for piping.

Installation of FRP pipes for transferring waste oily water for process.

Installation of CS pipes for oily water.

Installation of DI pipes for underground waste water system.

Monitor in-process welding activities, calibration status of weld machine, and storage of consumable and record weld audit reports.

Witness, verification of visual inspection surface appearance, weld profile, welds reinforcement and soundness.

Establish program to evaluate performance of post weld heat treatment.

Ensure control plan and its associated welding drawings are implemented & used effectively.

Witness UT, PAUT, MT, PT, and ACFM. Carry out RT film interpretation. Endorse the reports & contribute to continuous improvement of non-destructive testing activities.

PROJECT : SIDRA MEDICAL AND RESEARCH CENTER.

EDUCATION CITY, QATAR.

MAIN CONTRACTOR : CCC & MID MAC JV.

CLIENT : KEO INTERNATIONAL.

Description : MEP CONTRACTOR in Construction of MULTI SPECIALITY HOSPITAL AND RESEARCH CENTRE.

My Duties and Responsibilities :

Installation of main 16 inches Reinsulated UNDERGROUND CHILL WATER piping from cooling tower to service area.

Primary and Secondary piping system for Heat Exchangers.

Mechanical, Piping, Erection, Installation of DIA 12 INCHS CHILL WATER AND HOT WATER (shaft) Pipes including Welding of structural installation supports.

Installation of Ductile Iron Piping for underground Fire piping system.

Piping done for main Fire pump room Covering 12 zones with dependent PRV STATION connecting with Siemens main control system and sprinkler system.

Installation of High Pressure Pumps and related Piping in Main CHILLED WATER PUMP ROOM.

Installation of HEAT EXCHANGERS, COMPRESSORS, LAUNDRY SERVICES.

Erection of R .O Plant and SS, HDPE, UPVC PIPING.

Fuel oil piping system for Diesel Generators co-coordinating with CAT Suppliers for Commissioning and running Generators.

Plumbing work for Sanitary and Domestic.

Installation of VC piping for underground drainage system.

Installation of copper piping for Medical Gas supplies (co2, O2).

Installation of DHWS/R, DCWS, CCWS SERVICE PIPINGS.

Pneumatic test done for all the Installed pipes as per the client request.

Erection and commissioning of Generators, Oil tanks Fuel line Piping.

Installation of Air Handling Units (AHU) and related valve packages and piping. Insulation of HVAC ducts and accessories. Leak testing and Air balancing as spec. requirement.

Installation of Fan Coil Units (FCU) and related valve packages and piping.

Flushing, Water balancing of total piping services.

Material Quantity survey as per schismatic Drawing.

.

Year : 2013 – 2015. Experience: 2 years

Title : SITE SR.MECHANICAL SUPERVISOR

Company : MERCURY MENA W.L.L.

Site @ FOUR SEASON HOTEL, BAHRAIN BAY.

KINGDOM OF BAHRAIN.

CLIENT : COWI INTERNATIONAL

MAIN CONTRACTOR : SIX CONSTRUCT.

Description : MEP CONTRACTOR in Construction of Hi-fi Seven Star Hotel.

My Roll part :

Mechanical, Piping, Erection, Installation of DIA 16 INCHS CHILL WATER AND HOT WATER (shaft) Pipes including Welding of structural installation supports.

Installation of Ductile Iron Piping for underground Fire piping system.

Piping done for main Fire pump room and sprinkler system.

Installation of High Pressure Pumps and related Piping in Main PUMP ROOM.

Installation of HEAT EXCHANGERS, COMPRESSORS, LAUNDRY SERVICES.

Erection of R O Plant and SS, HDPE, UPVC PIPING.

Plumbing work for Sanitary and Domestic.

Erection and commissioning of Generators, Oil tanks Fuel line Piping.

Installation of Air Handling Units (AHU) and related valve packages and piping.

Installation of Fan Coil Units (FCU) and related valve packages and piping.

Flushing, Water balancing of total piping services.

Year : 2008 – 2013.

Experience : 5 years

Title : MECHANICAL ENGINEER E2.

Company : M/S. CAPRO ENGINEERING CONTRACTORS.

Site @ CETHAR LTD.

UNIT- II.Trichy-621316.

Description : Production of Industrial Power Plants (350MW) pressure and non-pressure parts with a Team of 150 Artisans attracting an output of 500 To 550 Metric ton per month, in Production of Structural Columns and Anchor supports, Pressure vessels, Industrial Centrifugal fans, water wall panel piping, Ducting, silo, Carbon Steel &SS Piping Related with pressure vessels, Hydro testing up to 200 bar.

My Roll part :

Receiving Erection and construction Plan and Work Load Allotment from central planning department.

Preparation of Material Requisition Slip (MRS) for load allocation.

Preparation of vendor code to get the approval of Production Order (P O).

Preparation of work allotment sheet to the team of 20 artisans as per work load.

Giving safety instructions and safety measures to the trades’ men as the company norms.

Preparation of PERT CHART as per the job completion plan.

Erection Follow up as per PERT CHART.

Offering Quality Control (Q/C) with step by step procedure for their Quality Clearance.

Getting FINAL INSPECTION REPORT (I/R) copies from Quality Assurance (Q/A) Dept.

Year : 2003 – 2008 Experience: 5 years.

Title : MECHANICAL SUPERVISOR.

Company : Al-khalidia group,

MAGNUM ENTERPRISES.

Kingdom of Bahrain.

Site @ Formula 1, Midal cable, Alu-Wheel, University of Bahrain, Equestrian Horse Racing Club (EHRC),

Durath Al Bahrain.

Description : Installation of compressors GC 7, 8 & 21.

Fuel oil piping system for DISEL GENERATORS. Erection, commissioning, operation and maintenance of R.O. Plant, (Max. Capacity - 7,00,000 GPD, 2X1000 m3/day)

DM Plant, Softeners, all types of UPVC Fittings, Valves and Skid Fabricating. Servicing Knowledge of TORO Irrigation Equipment’s, Automobile locomotives, reciprocating compressors.

Year : 1997 – 2003

Experience : 6 years.

Title : JUNIOR SERVICE ENGINEER.

Company : ALWEYN PUMPS & SYSTEMS P LTD.

Coimbatore – 35.

Description : Erection and commissioning of Reverse Osmosis Plant, Sewage Treatment Plant, Effluent Treatment Plant. Erection and commissioning of Centrifugal pumps, Positive Displacement pumps, Multi Stage pumps (Vertical &Horizontal) and Manual Drafting.

Work History

Year

Position

Employer

Client

Project

Location

FEB 2015 TO TILL DATE

Site Mechanical

Engineer.

Qatar Kentz

Member of SNC LAVALIN GROUP

KEO INTERNATIONAL.

QATAR GAS

SIDRA MEDICAL AND RESEARCH CENTRE.

ZERO LIQUID DISCHARGE PROJECT.(ZLDP)

WASTE WATER REDUCTION & RECYCLE POJECT (WRRP).

QATAR

2013 to 2015

Sr Site Mechanical Supervisor.

Mercury mena w.l.l Bahrain.

COWI INTERNATIONAL

BAHRAIN.

FOUR SEASON HOTEL.HI-FI SEVEN STAR HOTEL.RAISE TOWER 200MTRS, 50 FLRS.

BAHRAIN BAY,

BAHRAIN.

20008 to 2013

Mechanical Engineer E2.

M/S Capro Engineering contractors.

CETHAR LIMITED TRICHY.

250MW, 400MW POWER PLANT PRESSURE AND NON PRESSURE PARTS.

UNIT -2, UNIT-7

TRICHY.

INDIA

2003 to 2008

Mechanical Supervisor.

Megnum Enterprises. Bahrain.

AL-KHALIDIA

GROUP.

MIDAL CABLE, ALBA, EHRC.

BAHRAIN

1997 to 2003

Junior Service Engineer.

Alweyn Pumps and Systems Pvt. Ltd.

ALWEYN PUMPS AND SYSTEMS PVT LTD.

HINDALCO, MRF, TNPL.

COIMBATORE.

INDIA.

Date :

Place : (RAJA JAYARAJ)



Contact this candidate