Ronaldo T. Busa
*th floor Golden Gulf Bldg. Al Bara Bin Malik St. Al Mansoura, Doha, Qatar Mobile Nos.: +974-****-**** Email: ***********@*****.***, Skype: ******.******@*****.*** Passport #: EC8261918
Objective:
To obtain any position related to the field of communication networks with learning and having adequate responsibilities to implement the skills being acquired.
Professional Summary:
Installation Supervisor at Doha Metro Rail Project assigned in green line The White Palace Station Supervised the installation of PAS, ECS, CCTV, ASC SYSTEM, AFC, PIS, PES, TDC System, PAX Telephone, LAN NETWORK, FO NETWORKS/(Intra Network). I Completed 110 KM length 48 core Fiber Optic backbone Network in 40 stations of Qatar Petroleum in Dukhan, Both handle and supervised manpower for project implementation. Generate site reports and red lines on revised plans. Migration from old line to a new line, and installation of telecommunication equipment regularly updates our clients’ project groups on project status, extend assistance in expediting surveys of priority sites and interfaces with other subcontractors. Has successfully led a number of projects.
Work Experiences: (“12 Years” Experience in Telecom Industry)
Company
Thales Middle East / Anotech Energy
Location
Doha - Qatar
Designation
Installation Supervisor
Period
Feb. 17, 2018 – March 31, 2019
Projects
Green line METRO PHASE 1 SYSTEMS, ROLLING STOCK AND TRACKWORK
Contract Number: RTC /075/2013 Station: THE WHITE PALACE STATION
Responsibilities:
Supervised the installation of all the following systems PUBLIC ADDRESS, EMERGENCY CALL POINT, CCTV, ACCESS CONTROL SYSTEM, AUTOMATED FARE COLLECTOR, PUBLIC ENTERTAINMENT SYSTEM, PUBLIC INFORMATION SYSTEM, TIME DISTRIBUTION AND CLOCK SYSTEM, PRIVATE AUTOMATIC EXCHANGE, LAN NETWORK, FIBER OPTIC NETWORKS/(Intra Network) and device installation, cable pulling and termination,
Closely monitor the subcontractor teams during installation activities in the station.
Interface to other suppliers and coordinate during installation activities (Civil, MEP).
Monitor and update the Installation tracker for the daily progress report. Reporting daily to Installation Manager.
Preparing report for weekly progress report to Installation Manager and Delivery Manager.
Ensure the availability of materials or devices (Material Take off Preparation) that required on site in order not to delay the installation team.
Work closely with the consultant supervision, Contractors Vendors and suppliers in resolution of site related problems and to ensure that identified deficiencies are repaired and update as to actual site conditions.
Coordinates with all concerned groups to expeditiously resolve problems that are encountered in the site during equipment delivery.
Ensure that all client service requirements are treated with urgency and responded accordingly the soonest possible time.
Company
Medgulf Construction W.L.L
Location
Doha - Qatar
Designation
Telecom Engineer
Period
Sept. 27, 2015 - Sept. 30, 2017
Projects
QATAR Petroleum EPIC of Potable Water Supply to UMMBAB, JALEHA, and KHATIYA NORTH Dukhan (Fiber Optic Backbone Network OSP/ISP)
Responsibilities:
Reviewing approved for construction drawing prior to the project Implementation.
Survey OSP routes as per approved drawing monitor civil activity for FOC trench preparation
Both handle Supervision and execution, Fiber optic cable pulling 110 KM in 40 stations of QP.
Installation of 42U rittal Telecom Cabinet and Fiber Optic Patch Panel in every station.
Supervised contractor testing of dB losses/OTDR traces for end to end testing.
Patching of patch chord to establish connectivity/Integration of 4 new buildings CCTV from the existing QP networks.
Generates Daily Progress Report and Weekly Progress Report to be send to Project Manager.
Company
Massivecomm Inc.
Location
Philippines
Designation
Telecom Engineer
Period
June 2013 - Sept. 24, 2015
Projects
ELV System (CCTV/IP Camera, IP Phone, WLAN, PABX, Structured Cable Installation)
Responsibilities:
Strong TCP/IP networking skills on LAN IP addressing, configuring router and switch.
Installation, configuration testing of IP camera, IP Phones, Implement Structured Cable laying and termination.
Overlook the project installation and making sure that it meets the technical design.
Coordinate and review all project documentations which include delivery notes, maintenance and operation manual and requirements, testing and commissioning procedures and inspections.
Company
Intex Telecom System
Location
Philippines
Designation
Telecom Engineer
Period
March 2006 - June 2013
Projects
In Building Solution Project for Sun Cellular/DMPI DSLAM, Next Generation Network and MSAN Project for Philippine Long Distance Telecommunication
Responsibilities:
Perform occular inspection, installation of Pico cell antenna, signal walk test, Rectification and acceptance.
Provide complete Engineering Documentation Technical Site Survey Report (CME, RF, TRM).
Installation, Commissioning and Integration of UTStarcom Access Gateways, NOKIA D500. IPDSLAM and Huawei MSAN Equipment.
Simulation and integration of environmental alarms of Outdoor Cabinets & ACBEL/DELTA rectifier alarms.
Conduct Commissioning (VLAN Configuration, IP Address Configuration, Subnetting) Integration, Troubleshooting and Acceptance of Access Gateway for PLDT project – Next Generation Network (NGN).
Qatar Petroleum (PTW Training)
Duties and Responsibilities, Understanding on Different types of permit, Permit to work Systems (Work Site Supervisor level 1 completed) Dec. 12, 2015 – Dec. 23, 2017.
Huawei Technologies Philippines, Inc.
EHS (Environment, Health and Safety) Installation, Commissioning, Integration, Troubleshooting, Acceptance MSAN Equipment (Indoor/ Outdoor) UA5000 Cabinet (Sept. 22 – 30, 2009).
Telecom Training Institute Philippines
Hardware and maintenance servicing, Software and hardware maintenance, (Sept. 20, 2004).
Academic Background:
CCNA (Cisco Certified Network Associate)
Modular Cisco 1-4, Routing Switching understanding on LAN, WAN, 7 layers OSI Model Subnetting, VLANs and Inter-VLAN, OSPF, RIP, EIGRP DHCP, HSRP, RSTP, ACLs, NAT, Port Forwarding Skills Configured Cisco Routers 2911, 1841 and Switches cisco catalyst 2960 series, and 2800 series Mapua Institute of Technology Makati City Philippines, January 2015.
Tertiary Level
Bachelor of Science in Telecommunication Technology
University of Makati J.P Rizal Extension West Rembo, Makati City Philippines 2002 – 2006.
Character References:
Available upon request
I hereby certify that the above information is true and correct.
Ronaldo T. Busa
Training Attended:
Applicant