APURBA SINHA
Mobile: 078******** E-Mail:*************@*****.***
SEEKING AN APPROPRIATE POST AS A STRUCTURAL DESIGN ENGINEER IN AN ESTEEMED FIRM
SYNOPSIS
A professional valuable experience with of 9 years gained in Design of Major Bridges, Minor Bridges, ROB, CUP, PUP, VUP, BOX Culverts, Pipe Culverts, Portal Frames, BBS, BOQ. Abutment, Pier, Column, Footing, Return Wall, Wing Wall, Retaining Wall & Superstructures.
Respect for project deadlines, high quality outcomes, integrity in work and full commitment to welfare of current organisation are some of my basic qualities which make me an unique asset.
AREAS OF EXPERTISE
CURRENT JOB RESPONSIBILITIES:-
Company: - TPF ENGINEERING PVT LTD. (APRIL 2019 – till date)
Current Projects & Executed Projects:
Title: DELHI-SAHARANPUR PREBID
Duration: April 2019 – Till present
Description: As an AGM Design –in-charge I have a team of Engineers and draughtsman I am also involved in delivering the scheduled tasks and deliverables in time by coordinating with the team and making GADs and design calculations by doing value engineering for EPC contractor (TATA PROJECTS LTD)
Company: - RELIANCE INFRASTRUCTURE LTD. (SEPT 2018 – April 2019)
Current Projects & Executed Projects:
Title: Mumbai Metro Line-04 PACKAGE-08
Duration: Oct 2018 – April 2019
Description: As an Engineer –in-charge I coordinate with the project manager and Engineer/Technical Manager and primarily involved in delivering the scheduled tasks in the form of designs and calculations and go through the technical calculations submitted by consultants. And involve myself in technical discussions with site team GC and consultant to resolve any design or site related issue. I am also responsible for getting the design approval from GC and MMRDA by resolving their technical and site related issues by giving them an appropriate solution and getting a smooth work done. And produce the approved drawing to site for execution and commencement of the construction procedure.
Title: Nagpur-Mumbai Super-communication express way PACKAGE-07 & 15
Duration: Sept 2018 – Dec 2018
Description: As a design Manager I coordinate with the project manager and Engineer/Technical Manager and be primarily involved in delivering the scheduled tasks in the form of designs and calculations. As a member of bridge team i am responsible for review of the work of Engineers and CAD technicians in team and maintain the quality of the deliverables . Overseeing and troubleshooting the work of bridge design, mentoring the engineers and providing the inputs to HOD for systematic deliveries and also conducting meetings with the client and authority engineer for approvals.
PREVIOUS JOB RESPONSIBILITIES:-
Company: - RAMBOLL INDIA Pvt. Ltd. (Mar 2015 – sept 2018)
Current Projects & Executed Projects:
Title: AFCONS – Agra-Lucknow
Duration: Mar 2015 – Till jan 2016
Description: During the project I was responsible for reviewing of structural drawings and designs which included (box culverts, VUP CUP) as per IRC-112(2011).
Title: ERA – Motichur Viaduct
Duration: Mar 2015 – Till date
Description: During the project I was responsible for design of Via duct span of 35m PSC girder as superstructure with open foundation as the substructure.
Title: Numaligarh-Jorahat
Duration: Aug 2015 –Feb 2016
Description: In this project I was leading it as a project manager and was responsible for design and also getting the design approved from Proof consultant simultaneously managing our contractor also . I had design various structures which included PSC girders as superstructure with open foundation, Pile foundation and well foundation as the substructure for Minor bridges and major bridges. Design of VUP’s and box culverts.
Title: Jaipur-Ringroad
Duration: Feb 2016-Dec 2016
Description: In this project I was leading it as a project manager and was responsible for design and also getting the design approved from Proof consultant simultaneously managing our contractor also . I had design various structures which included PSC girders as superstructure with open foundation, Pile foundation and well foundation as the substructure for ROB’s Minor bridges and major bridges. Design of VUP’s, portals, Steel Structures and box culverts.
Title: Angul-Sambalpur
Duration: Feb 2017-Till date
Description: In this project I am leading it as a design engineer being responsible for design and also getting the design approved from Proof consultant simultaneously managing our contractor also. I shall be designing various structures which includes (PSC girders,RCC girders, Solid Slab) as superstructure with foundation (open foundation, Pile foundation) as the substructure for ROB’s Minor bridges and major bridges. Design of VUP’s, portals, Steel Structures and box culverts.
Title: MTHL- Mumbai Transport Harbour link
Duration: April 2018-Till date
Description: In this project I am leading it as a design engineer being responsible for design and also getting the design approved from Proof consultant simultaneously managing our contractor also.
Company: - SHRIKHANDE Consultants Pvt. Ltd. NAVI MUMBAI (Sep 2014 – Feb 2015)
Current Projects & Executed Projects:
Title: KOCHI Bridge & CIDCO (Project)
Duration: Sep 2014 – Till date
Description: During the project I was responsible for design of structures which included PSC I girder (major
bridges) for superstructure with Pile foundation for substructure as per IRC-112(2011).
Company: - SOWiL Ltd. NAVI MUMBAI (Sep 2011 – Aug 2014)
Executed Projects:
Title: PUNE SATARA (MSRDC) (Maharashtra Govt.)
Duration: Sep 2011 – Feb 2012
Description: During the project I was responsible to design structures at ch. (725.000 – 769.000) which included box
culverts (straight/skew), Psc I girder (major bridges), minor bridges (boxes, portal); Pipe Culverts, VUP,
CUP, PUP with its hydrological data.
Title: Muzzaffarpur – Hazipur (PATNA ROB)
Duration: Sep 2011 – March 2012
Description: This Project included design of ROB including staircases along with a column and sacrificial slab that rests
on a square footing.
Title: Ujjain - Satna
Duration: Oct 2011 – Nov 2011, Jan 2012 – Feb 2012
Description: This Project included Proof Checking of Drawings & Design of Solid Slab, Return wall, Box Culverts, Minor
Bridges, Major Bridges, Hydraulic Data, geotechnical report.
Title: (Jaipur-Jodhpur)
Duration: Feb 2012 - Present
Description: This Project included design of ROBs at Neem ka Thana (LC-76), Ringas (LC-108), Alwar (LC-116), Chomu
(LC-110) which included Superstructure Design RCC, PSC, Steel, & Substructure, BOQ, & Substructure
Design.
Title: (Ahmedabad - Vadodra)
Duration: Oct 2012 – Jan 2013
Description: This Project includes Preparation of GAD, BOQ, and detail design of 2 major bridges and 1 flyover with
Value engineering comprising PSC box girder as the superstructure and pile foundation as substructure.
Title: (Panvel-Indapur)
Duration: Nov 2012 – Feb 2013
Description: This Project includes Preparation of GAD, BOQ, and detail design of a major bridge comprising of PSC I
girder in the superstructure and pile foundation as the substructure.
Title: (DFCCIL) (CENTRAL RAILWAY)
Duration: Feb 2013 – Sept 2014
Description This Project includes Preparation of GAD, BOQ, and detail design of ROB comprising of PSC I girder and
Steel structure in the superstructure and pile foundation and open foundation in the substructure.
Title: Proof Checking
I was also responsible for Proof Checking of RE wall (Muzzaffarpur, Chapra-Kacheri, Hathua-Thawe),
Checking of the Bearing loads (Muzzafarpur, Begusarai, Ringus, Alawar).
Company: - Accrete Consulting Engineers Pvt Ltd. Gurgaon. (Aug 2010 – Aug 2011)
Projects Handled:
Title: Narkatpalli Adanki Structures
Duration: Aug 2010 – Feb 2011
Description: The Objective of this project was to design some pipe culverts (single pipe, double pipe, triple pipe, multiple
pipe), & Slab Culverts, (Single cell, double cell, multiple cell) (straight/skew), which also included its BOQ &
BBS.
Title: Shillong Bypass
Duration: March 2011 – May 2011
Description: The Objective of this project was to design a Prestressed T girder (Superstructure) for a major bridge,
which included drawing of a catchment area for the hydrology report and the soil Investigation data for
Geotech report and its BOQ.
Title: Rohtak Bawal Structures
Duration: March 2011 – Aug 2011
Description: The objective of this project was to design of new Minor Bridges (Boxes), Box Culverts (Straight/Skew),
(Single cell, Double Cell, Triple Cell). ROB & Major Bridges, VUP, PUP and Reconstruction and Repairing of
some existing structures including BBS.
ACADEMIC CREDENTIALS
B.Tech. (Civil Engineering) from National Institute of Technology, Kurukshetra in 2010. Secured 6.58/10 CGPA.
XII from Coast Guard Public School, Daman, (CBSE Board) in 2006. Secured 54.2%.
X from Institute Of Our Lady Of Fatima, Daman, (Gujarat Board) in 2004. Secured 75.56%.
SOFTWARE SKILLS
STAAD PRO, AUTOCAD, MIDAS,
C, C++, VISUAL BASIC
MICROSOFT WORD, MICROSOFT EXCEL, POWER POINT
ACADEMIC PROJECTS
During B.Tech:
Summer Internship of 6 weeks training Survey Camp at Dehradun (NIT Kurukshetra)
Summer Internship of 2 months training at Mazagaon Dock Ltd (One of the leading Shipping Company in India as well as Asia which is responsible for building War ships and Submarines) for the project of “Wet Basin Construction” which was handled by ITD Cementation India Ltd.
Analysis of a Multistoreyed Building Structure & calculation of Bearing Capacity of Soil to design a footing for the structure under the guidance of (Pr. Dr. Anupam Mittal Nit Kurukshetra)
Planning, Designing & Drawing of a 3 storied building in campus of NIT Kurukshetra under the guidance of (Pr. S.M. Gupta, Nit Kurukshetra)
NOTABLE ACCOMPLISHMENTS
Won Third Prize in Relay Race(women) & Obstacle race (400 mts) (Women) in 2007 (NIT Kurukshetra).
Won Third Prize in District level for Potrait making Competition in 2003.
Diploma in Bharatnatyam (4 years course).
Organising Member of Confluence (Cultural fest) for the session 2006 – 2010.
Organizing Member of Infrastructure (technical Society of Civil Engineers) for the session 2006 – 2010.
Executing Member of Anamika (Official Hindi Society) for the session 2006 – 2007.
Organizing Member of Fine Arts Club (Society) for the session of 2006 – 2010.
PERSONAL DOSSIER
Date of birth : 23rd Feb 1989
Father’s Name : Debabrata Sinha
Spouse Name : Debashish Pal
Mother’s Name : Itali Sinha
Marital Status : Married
No of Children : 1 (daughter)
Gender : Female
Languages Known : Hindi, English, Bengali, Gujarati, Oriya
Nationality : Indian
Permanent Address : Flat no 1401, Angre house, Mazgaon Dock ltd quarters, Dockyard road, Mumbai-
400010, Maharashtra.
DECLARATION
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars.
Place: Mumbai Apurba Sinha.