SIVA SAI KUMAR KOMMINENI
E-Mail: ****.************@*****.***,
Mobile: +91-901*******,
Address: S/o:K Koteswara Rao, D.No:4-6-5(24/4), Karavadi donka,4th Lane, Kammapalem,
Ongole, Prakasam Dt, AP. Pin : 523001.
Objective : Engineer level assignments in Plant Management, Operations &
Maintenance in Power and Chemical plants.
Career Conspectus
Engineer Electrical with 7 years of rich experience in Plant Management, Operations & Maintenance,
Process Enhancement, Erection & commissioning and Team Management.
Proficient in handling site operations and accountable for quality service & timely completion
Of the projects.
An effective communicator with excellent relationship management skills and strong analytical,
Leadership, decision making, problem solving & organizational abilities.
Employment Scan & Company Profile:
Since November – 2013 working as Junior Engineer Electrical in THE ANDHRA SUGARS LTD
(CHEMICAL & FERTILIZERS DIVISION), KOVVUR & SAGGONDA with 32.5MW captive power
Plant [Coal based CFBC 135TPH Boiler-TKII make and 33MW Steam Turbine-SNM make] the
Mmanufacturer of Caustic soda lye, Caustic soda flake, 33% Hydrochloric acid, Chlorine, Hydrogen Gas,
Sodium Hypo Chloride and Liquid hydrogen by electrolyzes of brine (salt) solution and Poly Aluminum
Chloride, 98% Sulphuric Acid.
November – 2011to November-2013 working as Graduate Trainee Engineer (Electrical) in
THE ANDHRA SUGARS LTD (SUGAR UNIT-I), TANUKU with 8.9MW Co-Generation Power
Plant.
May-2011 to November-2011 Graduate Trainee Engineer (Electrical) in M/s VIJAY NIRMALA
COMPANY Pvt. Ltd., VIZAG. (Trained as Electrical Supervisor in Infrastructure
Development Projects)
Duties and Responsibilities
Operation and maintenance 132/33KV, 132/11KV sub-stations.
Operation and maintenance HT/LT sub-stations.
Operation and maintenance of Power and distribution transformers CGL, BBL, NGEF and PETE make.
Operation and maintenance of 132KV SF6 breakers, 33KV VCB’S, 11KV VCB’S, ACB’S and MCCB’S of SIEMENS and L&T make.
Generator control, protection, metering and synchronization control schematics design and modification.
HT< breakers, PCC, MCC Starters and PLC panels control scheme drawings design and modification.
Preventive maintenance of PCC and MCC panels.
Preventive maintenance of DOL, S/D and ATS.
Preventive maintenance of retardant UPS and DC battery chargers.
Preventive maintenance of HT< motors.
DCS interfaced control wiring cable laying and termination.
DCS and Plant Process interlock control wiring termination of electrical equipment.
Erection, commissioning and pre commissioning of expansion of plant.
Projects
Project description: 32.5MW Thermal Power Plant
Key responsibilities: Engineering, erection and commissioning of below:
11/132KV Sub-Station with 45MVA Generator Transformer.
41.5MVA Generator with brushless excitation- TDPS
11KV HV Switchgear panel- L&T.
415V PCC and MCC panels- L&T Switchgear.
12pluse and 6plude VFD’S- ABB.
2 X 2.5MVA and 500KVA 11KV/415V distribution transformers- PETE.
2 x 1.3MVA 11KV/2 X 415 convertor transformers for 12pluse VFD’S- PETE.
2 x 45KVA retardant AC Distribution UPS and 110V, 150A DC Battery charger.
5 x 40KVA, 111KV 400mA rectifier transformer for ESP- THERMEX.
Software skills
Operating MS-Word, Excel and Power Point.
Scholastics
B.Tech in Electrical and Electronics Engineering (2007-2010)
From RAO & NAIDU ENGINEERING College (affiliated to JNTU, Kakinada),
Ongole, Prakasam Dt. (A.P).
DIPLOMA in Electrical and Electronics Engineering (2003-2006)
Bapatla Polytechnic College, Bapatla, Guntur District, A.P,
From State Board of Technical Education and Training, A.P.
SSC (Matriculation) 2003 from Board of Secondary Education AP
Personal Dossier
Date of Birth : 10th August, 1988
Languages known : Telugu, English and Hindi.
DATE : 08-03-2019
PLACE: Kovvur
(SIVA SAI KUMAR KOMMINENI)