Post Job Free
Sign in

Manager Project

Location:
Chino Hills, CA
Salary:
$135k
Posted:
June 05, 2019

Contact this candidate

Resume:

ANTON BERCICH

***** ***** ****

Chino Hills, CA

Phone: 714-***-****

Email: ************@*****.***

OBJECTIVE: Senior Construction Manager

SUMMARY OF QUALICATIONS

** **** ***** ********** ** the Construction industry. 6 Months Project Manager Martin Bros/Marcowall, 2 Years Construction Project Manager Foothill Regional Medical Center/LA Hospital at Bellflower, 6 Years President of Bercich Construction, Inc., 3 Years Senior Project Manager, 9 Years Project Manager/Estimator, 5 Years Union Superintendent, 2 Years Union Foreman, 1 Year Union Journeyman, and 1 Year Union Apprentice.

Team Player and Team Builder, Detailed-oriented, hands-on Professional, Self Motivated, experienced in Ground-up Construction, Tenant Improvement, Design/Build Projects, Retail, Hospitals, CEA and Clean Rooms, DOD and Government Projects. Extensive background planning and managing multiple projects and coordination with cross-functional teams, Customers, Architects, Engineers, and Sub-Contractors. Exceptional organizational skills with emphasis on completing projects safely, on time and under budget.

Able to build and lead Teams, along with building relationships with Clients, Architects/Engineers and Subcontractors.

SKILLS SUMMARY

Estimate and establish budgets and contract price

Negotiate cost-effective subcontract and material purchases Set-up and implement job procedures and techniques to assure timely buyout Shop drawing approval and material delivery

Keeping the Project on schedule

Developing and maintaining a good relationship with the Owner, Architect and Subcontractors Working with the Subcontractors to develop safety plans and to implement safety procedures Maintain timely and accurate reporting to management Organize regular meetings for management and subcontractors Write and Review contract conditions and Scope of Work. Ensure compliance with all contract terms

Supervise documentation of all significant project events, e.g. Accidents, Delays, RFIs and Change Orders

Direct pre-construction services and activities

Negotiate, prepare and issue subcontract bid packages Maintain quality control (integrity and excellence of completed project- complete the project with a strong finish)

Support estimating staff

Complete all job closeout procedures

Conduct warranty follow-up

Proficient in MS Word, Excel, Project and Primavera (Suretrak), PROCORE LEED Trained

AIA Contract Certified

SWPPP Certified

REVELANT EXPERIENCE

California

Lucas Museum of Narrative Arts – L.A., CA $42 Million Dollars Foothill Regional Medical Center Tustin, CA - Removed Fan Coil Units #, # & #4 and Replaced them with HVAC /DX Units with Humidifiers and VFDs Tustin, CA $2.2 Million Dollars On Time and below Budget.

Los Angeles Community Hospital at Bellflower – Modify the Kitchen Air Condition Units $685,000 On Time and Budget.

Foothill Regional Medical Center Tustin, CA – ED Verification Room (Trauma Room #6) $388,000 On Time and Budget.

Foothill Regional Medical Center Tustin, CA - Cooling Tower Replacement/Temp. Chiller $81,000 On Time and Budget.

Foothill Regional Medical Center Tustin, CA – OR #3 & #4 $174,000 On Time and below Budget. Foothill Regional Medical Center Tustin, CA - X-Ray Room – Tustin, CA $850,000.00+ On Time Foothill Regional Medical Center Tustin, CA - Steris Machine – Tustin, CA $150,000+ On Time and below Budget

Foothill Regional Medical Center Tustin, CA - OR #1 & #2 Light Replacement – Tustin, CA

$157,000.00+ Ahead of Schedule below Budget

5 Story Mixed-use Type 3 Building. Los Angeles $9+ Million. (Cambridge Homes) Orchard Supply and Hardware TI Building Mission Viejo, CA $4+ Million. TRW Manhattan Beach, CA 6 story TI completed on time and under budget. Contract $6.5+ Million. Raytheon El Segundo, CA SBRIS 10K Clean room completed on time and under budget. Contract $1.8+ Million, Relocate Laser Labs completed on time and on budget. Contract $3.2+ Million Cedar Sinai Medical LA, CA Center Various TI Projects UCI Medical Center Irvine, CA Cancer Wing 3.5+ Million completed on time and under budget. Japan Telecom LA, CA Install a Data Room (Entire Floor) completed on time and on budget. Contract

$722 Thousand.

Boeing El Segundo, CA Replace AHUs’ completed on time and under budget. Contract $352+ Thousand. S-24/25 Refurbish Area completed on time and under budget. Contract $675+ Thousand. Rockwell Newport Beach, CA 510 E 2

nd

and 4

th

Floors Renovation (TI) completed on time and under budget. Contract $4.5+ Million.

Pacific Sky Supply Van Nuys, CA 2

nd

Floor Upgrade Support and Construct Tunnel completed on time and under budget. $276+ Thousand.

Utah and Idaho

Utah Power Credit Union SLC, UT (Construction Manager) New 2 Story Building $4.3 Million Utah Fertility Clinic Pleasant Grove, UT New 2 Story Building 10,500 Sq.Ft. (Design/Build) completed on time and under budget. $2.3 Million

Fellowship Bible Church Lindon, UT New 2 Story Building 10,700 Sq.Ft. completed on time and under budget $1.3 Million

Techna Glass Pleasant Grove, UT New CMU Building 3,200 Sq.Ft. completed on time and under budget. $303 Thousand

Techna Glass Tooele, UT Tenant Improvement 3,400 Sq.Ft. completed on time and budget. $232 Thousand

Checker/Shucks/Kragen Auto Stores (2) Meridian Idaho, St. George, Hurricane, Washington, Syracuse, Heber Utah. Stores ranged from $650 to $770 Thousand for each store. On time and on or under budget ATK Bacchus West Magna, UT “K” Wing TI $2.1 Million on time and budget. Schiff Nutrition SLC, UT Install 30 foot S.S. Mixing machine on time. T&M (Design–Build). Walgreens Idaho Falls, ID $2.3 Million on time.

Franklin Templeton Investments SLC, UT 5 Story TI, Complete demo and new build-out. $3.75 Million on time and under budget.

ATK Aerospace Mezzanine Magna, UT 5,000 Sq.Ft. Mezzanine with offices built-out in existing building. Design-Build $762 Thousand. On time.

BARD Access Systems SLC, UT 180,000 Sq.Ft. Office, CEA Room and Lab build-out. $2.2 Million on time and under budget.

U of U CAMT SLC, UT MRI Machine Shielded Room and Office Build-out. $780 Thousand. On time and under budget.

WORK HISTORY

Pacific National Group, Inc., Irwindale, CA 1990 to 2005 A $125 million General Contractor company since 1954. Ranked No.11 in So. Cal in 2001 by the Los Angeles Business Journal.

Big D Construction, Inc. Salt Lake City, UT 2005 to 2008 A $780+ million General Contractor company since 1967. Ranked No.3 in the State of Utah. Bercich Construction, Inc. Lehi, UT 2009 to 2015

General Contractor

Cambridge Homes Murrieta, CA 2015 to 2016

General Contractor

Alta Hospitals Tustin and Bellflower, CA 2017 to 2018 Martin Bros. / Marco Wall 2019 to Present

Sub Contractor

EDUCATION

Carpenters School Local 1506

Fullerton Community College

Sonora High School



Contact this candidate