Mohamed Elsharief
Driving license EGYPT 002*********** QATAR 009********** ***.*********@*****.***
OPERATION MANAGER/SR.PROJECT MANAGER
Professional Experience Summary:
Civil Engineer with a 29-year record of success overseeing all phases of multimillion-dollar construction, infrastructure, superfund and environmental projects for government and private-sector clients. Experience includes managing crews of more than 2000 workers in different construction projects. Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions.
Key Skills
— Housing & Retail Projects
— Infrastructure Projects, including but not limited to Urban Roads and Rural roads/Drainage
— Industrial Projects
— Site Safety/OSHA Compliance
— QA/QC/Field Engineering
— Change Order Management
— steel structure projects
— Budgeting & Cost Controls
— Bidding/Estimating/Proposals
— Crew Supervision
Employer Summary & Project Highlights
ITCC–Sr. Project Manager, July 2017 to August 2018
1- Twin Towers At Parle Budgets: QR 750 Million
Al Bandary Engineering –Sr. Project Manager, March 2016 to June 2017
2-Commercial 5 Tower at Lusail Area Budgets: QR 560 Million
3-Mix 11 Tower at Lusail Area Budgets: QR 750 Million
4-Fox Hill Tower Building (17 Bldgs.) at Lusail Area Budgets: QR 680 Million
5-H.B.J. Tower in Al Kharej at Lusail Area Budgets: QR 230 Million
1Commercial 5 Tower Project is consisting of the following:-
3 Basements and 25 Floors
2Mix 11 Tower is consisting of the following:-
2 Basement and 36 Floors
3Fox Hill 17 Buildings is consisting of the following:-
Each Building 1 Basement and 5 Floors
4H.B.J. Tower at Al Kharej Area is consisting of the following:-
2 Basement and 20 Floors
ARABTEC CONSTRUCTION W.L.L. (QATAR) –project Manager, April 2009 to February 2016
1Twin Towers Project Budgets: QR 680 Million
2World Trade Center Project Budgets: QR 550 Million
3AL WAAB CITY PROJECT Budgets: QR 5 Billion
1 Twin Towers Project is consisting of the following:-
1.1 3 basements and 2 Tower 48 stories each :
The 1st Tower is Hotel Tower and the 2nd is Office Tower
1.2 Podium Consists of Three Floors
2World Trade Center Project is consisting of the following:-
2.1 4 basements and 50 stories Tower
2.2 Podium
2.3 Sphere 6 stories
Most of the project is a composite section (steel structure + concrete)
3Al Waab City Development in Doha covers an area of 1.25 million square meters. It is a mixed use development with residential, commercial, Recreational and office spaces.
MAMCO GENERAL CONTRACTORS (QATAR) – Project Manager, Nov 2007 to March 2009
Multiple Projects Budgets: QR 150M to QR 200M
Construction of Civil works for integrated district cooling plant in the Pearl Qatar (industrial construction).
Construction of 16 building at Al Khor area with total area 6,400m with 3floor and ground floor precast concrete (Turn Key).
Nasser El Farag Contracting (SAUDI ARABIA) – Projects Manager, May 2006 to October 2007
Infrastructure Projects Budgets: SR 375M to SR 400M
Highway works with utilities – Owned by Riyadh and Al Qassim municipality:
The Roads located at many districts at Al Qassem like El Mozneb & El Gawara & Bouraida & Onaiza & Oyon El Gawa & Al Asyah; Width of the roads ranges from one lane 10m up to 31m two lanes with median island/two edge shoulders. Lengths = 180km, Cost = SR.80million; Authorities: The Municipality and Village Ministry; and
Rafha City Highway 150km, Coast = SR.120million; including small bridges; Authorities: Ministry of Transportation.
Drainage and Sewage System for many districts at Al Qassim.
El Khalily Contracting Company (EGYPT) – Projects Manager, May 2004 to April 2006
Infrastructure Projects Budgets: EGP 110M to EGP 150M
Sanitary & Sewage Projects - The first contract was consisting of 10 Villages at Baniswayef, and the another contract at Sharkia with 9 Villages.
Hassan Hadi Establishment (SAUDI ARABIA) – Projects Manager, Feb 2002 to April 2004
Infrastructure projects Budgets: SR 230M to SR 250M
Highway works with all utilities like (electric and sewage, water supply), small bridges, which in mostly regional of Gizan (S.R.175Million).
A lot of districts at Gizan like Wadi Gizand & Santah & Abo Aresh & Damad & Marine base Ahadel Masorha roads & repair for cement factory at Gizan.
Internal roads with different width and length about 60km, Authorities: Municipality and Village Ministry
Abo Aresh Highway road: length 35km, Coast = SR25million; Authorities: Ministry of Transportation
Hospital project at Abo Arish (Gizan) (150 beds) including several medical zones (55 Million S.Riyal),
Al Wafa Construction (EGYPT) – General Manager, 1994 to Jan 2002
Multiple Projects Budgets: EGP 500M to EGP 550M
Construction of the extension of the water supply and sewerage system of the free zone of Nasser City including replacement/maintenance of the existing portions of the system,
Construction of two underground R.C Water Tanks (4000m3 capacity for each), Construction of sports club; and repairing of 4000m3 underground water tank; all for the Nuclear Energy Organization.
Construction of boundary walls (1.5km long) for the Archeological Higher Council.
Construction of road networks either urban or agricultural “concrete paved roads” networks. For GASCO Petroleum Company. Package of service roads for gas rooms and desert and farmland at various places some are non paved and some with concrete paved length about 17km, Coast = Seven (07) million pound
Construction of infrastructure works for Steel Tanash factory along with Tanash District.
Renovation of Mirret King Temple at El-Tahrir museum.
Renovation of Egyptian American Bank – Abdul Khalek Tharwat Branch,
Contraction of multistory apartment building (turn key),
Construction of 15 Villas, (350m2 each) turn-key.
Construction of office building over 15m diameter pneumatic caisson for Alexandria Petroleum Company.
Construction of CFA piles for multistory office building for GASCO Petroleum Company
1991 – 1994 National Electrical Co. (Libya) – Engineering Manager
Civil works for desalination & electrical power station of south Benghazi
Supervision civil work for district power station
Design & supervision of administrative building for the electrical company (Eastern Area) from Benghazi to Toprock
Design & Supervision accommodation building for labors and steel structure and R.C. stores
1990 – 1991 United Consultants (Libya) – Supervisor Engineer
Design & supervision of water supply system and sewage roads for chocolate factory at Benghazi.
Supervision noodles (spaghetti) factory in Benghazi (turn key) with Daewoo international contractor( 45 million LD)
Design 7 Supervision for main ceremonies building at Al Galaa park.
Design and supervision water supply system and sewage and roads for three residential neighborhood.
Design & supervision of multi storey buildings and a lot of villas.
1988 – 1990 Bilfinger & Berger (Libya) – Site Engineer (infrastructure project)
Construction of a highway with all necessary crossing structures including bridges, roundabouts including the corresponding infrastructure works (sewage and drainage)
Benghazi – Libya & Sousa (Libya) Al Oruba bridge 23million Libyan Dinar (Bilfinger + Berger Company)
Highways of length of 150km, two lane highway of 11.5m width of each + median island + two shoulders; Authorities: Municipality and Transportation Ministry
1987 – 1988 Libyan National Construction (Libya) –Site Engineer (infrastructure project)
Infrastructure works for Al Hadaek District.
Education & Certifications
Basic Level: Auto CAD 2009 & Primavera 6 (enter price)
Green Building and LEED Fundamental on line course August 2010,
PMP course June 2010.
10 Million hours without lost time injury (LTI) Award in Al Waab City Project 2010
MSC course, IN SOIL MECHANICS & FOUNDATION, CAIRO UNIVERSITY 1995
UNIVERSITY OF, GARYOUNIS (LYBIA) — BSc. in Civil Engineering, 1987
Personal Data
Birth Date : 30th January 1963
Marital Status : Married – one child
Nationality :Egyptian