Post Job Free
Sign in

Engineer Manager

Location:
San Ramon, CA
Salary:
90000
Posted:
May 16, 2019

Contact this candidate

Resume:

HANY EZZAT BOULOS, GUIRGIS

Planning Manager & Projects Control Engineer

1

I have a total of more than 28 years’ experience and excel at many of the fields in construction. Confident, hard-working, independent and trustworthy, I work with international and local companies, consultants and contractors as: Technical office manager & quality control, Senior Planning Eng., cost control, Procurement Engineer, subcontract agreement and site supervion Engineer

Mobile Telephone : +1-925-***-****

E-mail : ac9d8z@r.postjobfree.com

– ac9d8z@r.postjobfree.com

Years from Graduation : 28 Years

Experience and professional

1. ARMED FORCES OFFICER’S CLUB & HOTEL

From: Aug 18 to Jan 19

Planning Manager

Project Name: Refurbishment and Re-Development Of

Armed Forces Officer’s Club & Hotel at Abu Dhabi, UAE Project Description:

Refurbishment and Re-development of Armed Forces

Officer's Club & Hotel in the following areas:

• Catering Facility • Banq, Hall & Laundry

• Sport Hub & Beach • Villas

• Beach Club & Pool • F&B / Retail Village

• Renovation Works

Responsibilities included:

• Preparing and maintaining the Baseline Construction Schedule by reading the Contract drawings,

Specifications, BOQ, and other Contractual

requirements using the Primavera Software 16.

• Assigning resource “Manpower, Qty” and Cash flow.

• Update the Baseline schedule in weekly basis ensuring effective planning and monitoring of Site activities and progress; responsibility for implementing corrective actions to arrest slippage.

• Recognizing and developing reports for management in weekly & monthly basis.

• Preparing and maintaining look-ahead schedule and resource requirements.

• Evaluating the Extension Of Time claim if any

• Supporting the various construction strategies by the corrective action and mitigation for any delay.

• Attending progress meetings for monitoring the progress of works and the productivity rate.

EDUCATION:

BSc., Bachelor of Engineering;

Fine Arts (Architecture)

Helwan University - 1990

Mini Master of Business

Administration (Mini MBA)

Warnborough College - 2013

PMP Preparation Course at Cambridge

in UAE 2014

PSP training in Planning Scheduling

Profissional at Cambridge, UAE 2010

GEOGRAPHICAL EXPERIENCE:

UAE, Egypt and KSA

Armed Forces Officer’s Club & Hotel at

Abu Dhabi

HANY EZZAT BOULOS, GUIRGIS

Planning Manager & Projects Control Engineer

2

2. Hill International (Middle East) Ltd.

From: Feb 14 to July 18

Senior Planning Engineer

Project Name: ADNOC Civil Projects Division - Abu Dhabi, UAE.

Projects Description: Various projects, Residentials, Schools, and administration buildings

Responsibilities included:

• Reviewing the Baseline Schedule with fully resource loading and productivity rate.

• Analyzing Extension Of Time using the Time Impact Analysis.

• Recognizing and developing reports for management in weekly & monthly basis.

Other Project: Emaar – Dubai Creek Harbour at Dubai, UAE

Responsibilities included:

• Program Management Overview.

• Follow up the projects in the construction stage.

• Review and assist for developing reporting for

management in weekly & monthly basis.

• Assist and advice PM. & CM. by evaluating Extension Of Time claim.

3. Dorsch Holding GmbH – Dorsch Consult, Abu Dhabi From: Jun 10 to Feb 14

Senior Planning Engineer

Project: AL-Ghadeer Development Project: Mixed-use; low rise residential development 75 Hectare; Along Al-Fayah Road at the end of the Emirates Road at the Abu Dhabi - Dubai border, conveniently midway between the new

Khalifa Port & Free Zone in Abu Dhabi and Dubai World Central Airport at Jebel Ali. Total built up area is 277,741.62 square meters / 2,989,610.79 square feet; predominantly residential for accommodation of around 5000 residents. Phase I: Residential, 2 Clubhouses, Retail, Parks, Recreation Facilities, School & 2 Mosques.

Construction Cost ~ 1.4 Billion AED

Client: “Sorouh” Previous and currently “ALDAR”

Responsibilities included:

• Review the Baseline Schedule.

• Review the Claim studying and EOT if any.

• Assist and advice PM. & CM. by daily, weekly and monthly report.

• Assist to develop various construction strategies by the corrective action for any delay.

ADNOC New Headquarter

Dubai Creek Harbour

AL-Ghadeer Development Project

HANY EZZAT BOULOS, GUIRGIS

Planning Manager & Projects Control Engineer

3

4. MUSHRIF NATIONAL CONSTRUCTION (L.L.C.)

May 09 to May 10

Senior Planning Engineer

Project:

Ruwais Housing Complex Expansion Phase III –, for Abu Dhabi National Oil Company (ADNOC) Package 6 at western area. Construction of 12 Residential Buildings (G+5 Story) in addition to Services Blocks “Substations”, Chiller Yards, related Soft and Hard Landscape and Infrastructure works. Construction Cost ~ 400 Million AED

Client: Abu Dhabi National Oil Company (ADNOC)

Responsibilities included:

• Prepare the Baseline Schedule using P6.

• Resource, cost loading assigning.

• evaluation of EOT for the Claim using TIA technique.

• Prepare and maintain daily, weekly and monthly report.

• Develop Manpower histogram, cash flow and S-Curve for monitoring the progress of works in Earned value analysis..

5. AL SHAFAR GENERAL CONTRACTING@ UAE

From: Jul 06 to May 09

Planning Manager

Projects:

1-Golden Mile Residences - Palm Jumeirah – Dubai,

10 Buildings (3 Basements+Ground+Mezzanine+6 Typical

+2 Penthouse) including external Landscaping work as well as service utilities.

Client: Nakheel Construction Cost ~ 1.4 Billion AED 2-British School-ALRAHA Garden (Yasmina school),

Al Raha Gardens KHALIFA A City: Built alongside 5.2 million square meters of natural beach front, the spectacular Al Raha Beach Development will provide a unique

unparalleled lifestyle through its world class residential, commercial, cultural, entertainment and public facilities, which will house up to 120,000 residents in this mega- billion-dirham development. Located on the beach side of the main highway leading into Abu Dhabi from Dubai, the development consists of eleven precincts, each with their own distinct personalities and appeal. Area 56.000,00 M2

& Buildup area 10.000,00 M2

Client: ALDAR Construction Cost ~ 120 Million AED

Responsibilities included:

Ruwais Housing Complex Expansion

Phase III

Golden Mile Residences - Palm Jumeirah

British School-ALRAHA Garden

(Yasmina school),

HANY EZZAT BOULOS, GUIRGIS

Planning Manager & Projects Control Engineer

4

• Tender studying and create a tentative program for the various projects at Head Office.

• Prepare strategy plan for the outline Project includes the Baseline Schedule.

• Resource management and assist for the Claim studying.

• Assist and advice PM. & CM. by daily, weekly and monthly report.

• Assist to develop various construction strategies by the corrective action for any delay.

6. Target Engineering @ UAE

From: Jun 05 to Jul 06

Senior Planning Engineer & Cost Control

In Marine, Jun to Nov 05 & in Oil Field; Dec 05 to Jul 06 Projects:

1. SAR Project, Sahil Accommodation Replacement, for ADMA- OPCO at Das Island; Project management ADNOC Construction Cost ~ 140 Million AED

2. 30 MGD SWRO at Power station, Jebel Ali for DEWA Dubai for Electrical and Water Authority; Project consists of Pump House “Intake Building” Around 290.00 M2 with total height around 16.50 M. “12 M. underground & 4.50 M Aboveground. ”Pipe line “Inlet Marine Works” Around 769 LM total length contains 112 L.M. Onshore & 657 LM. Offshore.

Management: Pal Technology – Consultant: Mouchel

Parkman Construction Cost ~ 26 Million AED.

Responsibilities included:

• Reporting to PM. as daily, weekly and monthly report.

• Assisted to develop various construction strategies. 7. Orascom Construction industries @ Cairo, Egypt

Dec. 1998 to Jun 05

Senior Planning Engineer & Cost Control

From Sep 02 to Jun 05

Projects:

1. MobiNil Refurbishment at Nile City Towers.

2. Greater Cairo Metro Line 2 to El Monib

Responsibilities included:

• Planning & cost control

• Quantity Surveying

• Prepare, the Invoices – Cost report – progress report 3. Golden Pyramids Plaza Project- City Stars – Egypt

CCIC & Orascom; From Dec 98 to Sep 02

(Consolidated Contractors International Company & OCI) Project: The project is a mixed development of 3 hotels (5

& 4 stars), furnished apartment buildings, 7 (seven) tower Sahil Accommodation Replacement,

for ADMA- OPCO at Das Island

Golden Pyramids Plaza Project-

City Stars – Egypt

HANY EZZAT BOULOS, GUIRGIS

Planning Manager & Projects Control Engineer

5

blocks of private apartments & commercial center

covering 400,000 m2.

Position: (Material & S/C Eng., "Procurement Department") Construction Cost ~ 1.1 Billion LE

Responsibilities included:

• Working in “Sub-contractor & Material Procurement” Department.

• Evaluation & recommendation for sub-contractor.

• Prepare the local & overseas purchase orders ordering goods from suppliers

8. Kvaerner Construction

Junior Architectural Engineer From Feb 98 to Dec 98 Project: Media City project: Mubarak TV. Studio Complex at 6 of October City.

Responsibilities included:

• Junior architectural engineer.

• Prepare the shop drawings.

9. Green for design & technical consulting

(Green Enterprises) From Jan 95 to Jan 98

(Consulting of Egyptian American Bank and Contractor) Technical Office Manager and Quality Controller

Responsibilities included:

• Technical Office Manager and Quality Controller.

• Prepare all bids for EAB branches.

• Coordinator with the sub-contractors for running jobs. 10. City First at Zamalek From Sep 94 to Jan 95

Travel Agency: Magdy Henein

Site Engineer supervisor

Project: City Sharm at Sharm El Sheikh

11. Mascot Design Bureau From May 92 to Sep 94

Design works & Site Engineer supervisor

Responsibilities included:

• Designing and prepar Shop drawings

• Work as a site supervisor for complete project

12. Youssef Decoration Establishment at Saudi Arabia From Jan 92 to Apr 92

Architectural Engineer

Responsibilities included:

• Worked as an Architectural making perspectives & internal design for gypsum boards ceiling & partitions.



Contact this candidate