HANY EZZAT BOULOS, GUIRGIS
Planning Manager & Projects Control Engineer
1
I have a total of more than 28 years’ experience and excel at many of the fields in construction. Confident, hard-working, independent and trustworthy, I work with international and local companies, consultants and contractors as: Technical office manager & quality control, Senior Planning Eng., cost control, Procurement Engineer, subcontract agreement and site supervion Engineer
Mobile Telephone : +1-925-***-****
E-mail : ****.*******@*****.***
– ********@*****.***
Years from Graduation : 28 Years
Experience and professional
1. ARMED FORCES OFFICER’S CLUB & HOTEL
From: Aug 18 to Jan 19
Planning Manager
Project Name: Refurbishment and Re-Development Of
Armed Forces Officer’s Club & Hotel at Abu Dhabi, UAE Project Description:
Refurbishment and Re-development of Armed Forces
Officer's Club & Hotel in the following areas:
• Catering Facility • Banq, Hall & Laundry
• Sport Hub & Beach • Villas
• Beach Club & Pool • F&B / Retail Village
• Renovation Works
Responsibilities included:
• Preparing and maintaining the Baseline Construction Schedule by reading the Contract drawings,
Specifications, BOQ, and other Contractual
requirements using the Primavera Software 16.
• Assigning resource “Manpower, Qty” and Cash flow.
• Update the Baseline schedule in weekly basis ensuring effective planning and monitoring of Site activities and progress; responsibility for implementing corrective actions to arrest slippage.
• Recognizing and developing reports for management in weekly & monthly basis.
• Preparing and maintaining look-ahead schedule and resource requirements.
• Evaluating the Extension Of Time claim if any
• Supporting the various construction strategies by the corrective action and mitigation for any delay.
• Attending progress meetings for monitoring the progress of works and the productivity rate.
EDUCATION:
BSc., Bachelor of Engineering;
Fine Arts (Architecture)
Helwan University - 1990
Mini Master of Business
Administration (Mini MBA)
Warnborough College - 2013
PMP Preparation Course at Cambridge
in UAE 2014
PSP training in Planning Scheduling
Profissional at Cambridge, UAE 2010
GEOGRAPHICAL EXPERIENCE:
UAE, Egypt and KSA
Armed Forces Officer’s Club & Hotel at
Abu Dhabi
HANY EZZAT BOULOS, GUIRGIS
Planning Manager & Projects Control Engineer
2
2. Hill International (Middle East) Ltd.
From: Feb 14 to July 18
Senior Planning Engineer
Project Name: ADNOC Civil Projects Division - Abu Dhabi, UAE.
Projects Description: Various projects, Residentials, Schools, and administration buildings
Responsibilities included:
• Reviewing the Baseline Schedule with fully resource loading and productivity rate.
• Analyzing Extension Of Time using the Time Impact Analysis.
• Recognizing and developing reports for management in weekly & monthly basis.
Other Project: Emaar – Dubai Creek Harbour at Dubai, UAE
Responsibilities included:
• Program Management Overview.
• Follow up the projects in the construction stage.
• Review and assist for developing reporting for
management in weekly & monthly basis.
• Assist and advice PM. & CM. by evaluating Extension Of Time claim.
3. Dorsch Holding GmbH – Dorsch Consult, Abu Dhabi From: Jun 10 to Feb 14
Senior Planning Engineer
Project: AL-Ghadeer Development Project: Mixed-use; low rise residential development 75 Hectare; Along Al-Fayah Road at the end of the Emirates Road at the Abu Dhabi - Dubai border, conveniently midway between the new
Khalifa Port & Free Zone in Abu Dhabi and Dubai World Central Airport at Jebel Ali. Total built up area is 277,741.62 square meters / 2,989,610.79 square feet; predominantly residential for accommodation of around 5000 residents. Phase I: Residential, 2 Clubhouses, Retail, Parks, Recreation Facilities, School & 2 Mosques.
Construction Cost ~ 1.4 Billion AED
Client: “Sorouh” Previous and currently “ALDAR”
Responsibilities included:
• Review the Baseline Schedule.
• Review the Claim studying and EOT if any.
• Assist and advice PM. & CM. by daily, weekly and monthly report.
• Assist to develop various construction strategies by the corrective action for any delay.
ADNOC New Headquarter
Dubai Creek Harbour
AL-Ghadeer Development Project
HANY EZZAT BOULOS, GUIRGIS
Planning Manager & Projects Control Engineer
3
4. MUSHRIF NATIONAL CONSTRUCTION (L.L.C.)
May 09 to May 10
Senior Planning Engineer
Project:
Ruwais Housing Complex Expansion Phase III –, for Abu Dhabi National Oil Company (ADNOC) Package 6 at western area. Construction of 12 Residential Buildings (G+5 Story) in addition to Services Blocks “Substations”, Chiller Yards, related Soft and Hard Landscape and Infrastructure works. Construction Cost ~ 400 Million AED
Client: Abu Dhabi National Oil Company (ADNOC)
Responsibilities included:
• Prepare the Baseline Schedule using P6.
• Resource, cost loading assigning.
• evaluation of EOT for the Claim using TIA technique.
• Prepare and maintain daily, weekly and monthly report.
• Develop Manpower histogram, cash flow and S-Curve for monitoring the progress of works in Earned value analysis..
5. AL SHAFAR GENERAL CONTRACTING@ UAE
From: Jul 06 to May 09
Planning Manager
Projects:
1-Golden Mile Residences - Palm Jumeirah – Dubai,
10 Buildings (3 Basements+Ground+Mezzanine+6 Typical
+2 Penthouse) including external Landscaping work as well as service utilities.
Client: Nakheel Construction Cost ~ 1.4 Billion AED 2-British School-ALRAHA Garden (Yasmina school),
Al Raha Gardens KHALIFA A City: Built alongside 5.2 million square meters of natural beach front, the spectacular Al Raha Beach Development will provide a unique
unparalleled lifestyle through its world class residential, commercial, cultural, entertainment and public facilities, which will house up to 120,000 residents in this mega- billion-dirham development. Located on the beach side of the main highway leading into Abu Dhabi from Dubai, the development consists of eleven precincts, each with their own distinct personalities and appeal. Area 56.000,00 M2
& Buildup area 10.000,00 M2
Client: ALDAR Construction Cost ~ 120 Million AED
Responsibilities included:
Ruwais Housing Complex Expansion
Phase III
Golden Mile Residences - Palm Jumeirah
British School-ALRAHA Garden
(Yasmina school),
HANY EZZAT BOULOS, GUIRGIS
Planning Manager & Projects Control Engineer
4
• Tender studying and create a tentative program for the various projects at Head Office.
• Prepare strategy plan for the outline Project includes the Baseline Schedule.
• Resource management and assist for the Claim studying.
• Assist and advice PM. & CM. by daily, weekly and monthly report.
• Assist to develop various construction strategies by the corrective action for any delay.
6. Target Engineering @ UAE
From: Jun 05 to Jul 06
Senior Planning Engineer & Cost Control
In Marine, Jun to Nov 05 & in Oil Field; Dec 05 to Jul 06 Projects:
1. SAR Project, Sahil Accommodation Replacement, for ADMA- OPCO at Das Island; Project management ADNOC Construction Cost ~ 140 Million AED
2. 30 MGD SWRO at Power station, Jebel Ali for DEWA Dubai for Electrical and Water Authority; Project consists of Pump House “Intake Building” Around 290.00 M2 with total height around 16.50 M. “12 M. underground & 4.50 M Aboveground. ”Pipe line “Inlet Marine Works” Around 769 LM total length contains 112 L.M. Onshore & 657 LM. Offshore.
Management: Pal Technology – Consultant: Mouchel
Parkman Construction Cost ~ 26 Million AED.
Responsibilities included:
• Reporting to PM. as daily, weekly and monthly report.
• Assisted to develop various construction strategies. 7. Orascom Construction industries @ Cairo, Egypt
Dec. 1998 to Jun 05
Senior Planning Engineer & Cost Control
From Sep 02 to Jun 05
Projects:
1. MobiNil Refurbishment at Nile City Towers.
2. Greater Cairo Metro Line 2 to El Monib
Responsibilities included:
• Planning & cost control
• Quantity Surveying
• Prepare, the Invoices – Cost report – progress report 3. Golden Pyramids Plaza Project- City Stars – Egypt
CCIC & Orascom; From Dec 98 to Sep 02
(Consolidated Contractors International Company & OCI) Project: The project is a mixed development of 3 hotels (5
& 4 stars), furnished apartment buildings, 7 (seven) tower Sahil Accommodation Replacement,
for ADMA- OPCO at Das Island
Golden Pyramids Plaza Project-
City Stars – Egypt
HANY EZZAT BOULOS, GUIRGIS
Planning Manager & Projects Control Engineer
5
blocks of private apartments & commercial center
covering 400,000 m2.
Position: (Material & S/C Eng., "Procurement Department") Construction Cost ~ 1.1 Billion LE
Responsibilities included:
• Working in “Sub-contractor & Material Procurement” Department.
• Evaluation & recommendation for sub-contractor.
• Prepare the local & overseas purchase orders ordering goods from suppliers
8. Kvaerner Construction
Junior Architectural Engineer From Feb 98 to Dec 98 Project: Media City project: Mubarak TV. Studio Complex at 6 of October City.
Responsibilities included:
• Junior architectural engineer.
• Prepare the shop drawings.
9. Green for design & technical consulting
(Green Enterprises) From Jan 95 to Jan 98
(Consulting of Egyptian American Bank and Contractor) Technical Office Manager and Quality Controller
Responsibilities included:
• Technical Office Manager and Quality Controller.
• Prepare all bids for EAB branches.
• Coordinator with the sub-contractors for running jobs. 10. City First at Zamalek From Sep 94 to Jan 95
Travel Agency: Magdy Henein
Site Engineer supervisor
Project: City Sharm at Sharm El Sheikh
11. Mascot Design Bureau From May 92 to Sep 94
Design works & Site Engineer supervisor
Responsibilities included:
• Designing and prepar Shop drawings
• Work as a site supervisor for complete project
12. Youssef Decoration Establishment at Saudi Arabia From Jan 92 to Apr 92
Architectural Engineer
Responsibilities included:
• Worked as an Architectural making perspectives & internal design for gypsum boards ceiling & partitions.